Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects

Agency: East Bay Municipal Utility District
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
Posted Date: Dec 18, 2024
Due Date: Dec 31, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects

[Sign In] Current Construction Bid Opportunities
Title: Request for Prequalification of Electrical Contractors and Subcontractors for Selected EBMUD Projects
Specification Number: 0B
Bid Walk:
Project Engineer:
Bid Opening Date: Wednesday, December 31, 2025, 4:00 PM
Estimated Cost:
Description: *For those renewing prequalification, the existing PDF package on the webpage may be downloaded and completed for submittal.*

Notice is hereby given that all electrical contractors and subcontractors that intend to submit a bid for performance of the identified electrical work listed below on East Bay Municipal Utility District (EBMUD) projects are required to complete the prequalification questionnaire, provide all requested materials, and be approved by EBMUD to be on the final qualified bidders list.

Bids that include an electrical contractor or subcontractor (hereinafter referred to as "Contractor") of any tier that has failed to comply with these requirements will be rejected as nonresponsive. If two or more business entities expect to perform the identified electrical work as part of a Joint Venture, each entity within the Joint Venture must be prequalified in order to qualify for bidding.

Contractors on the final qualified electrical bidders list will be eligible to bid on the selected projects identified in Appendix A. Projects identified in Appendix A are anticipated to be awarded in the near future, and are provided as examples of the types of projects that will use the list. Not all EBMUD projects will require the usage of this list. Electrical Contractor prequalification, if required for a specific project, will be identified in the Instructions to Bidders of the specifications for the project.

To view the full details, please see the "Download the Prequal Document HERE" link on the left. Please note the "Request a Bid Set" link is not available and hard copies of the document will not be provided.
Request a Bid Set
Download the Prequal Document HERE
Plan Holders List
Questions and Answers
Bid Walk Sign-In Sheet
Bid Walk Location Map
Bid Results
Construction Documents
Specifications
Plans - PDF

For more
information, please contact the Specifications Section .

Attachment Preview

Request for Prequalification
of
Electrical Contractors and
<BSubcontractors
for
SELECTED
EBMUD PROJECTS
EBMUD
November 16, 2020
TABLE OF CONTENTS
Page No.
NOTICE TO CONTRACTORS ...................................................................................................... i
SECTION 1 INSTRUCTIONS FOR PREQUALIFICATION SUBMITTALS ............................ 1
1.1 DELIVERY OF SUBMITTAL ........................................................................................ 1
1.2 PREPARATION OF SUBMITTAL ................................................................................ 1
1.3 WITHDRAWAL OF SUBMITTAL ................................................................................ 2
1.4 LATE SUBMITTAL........................................................................................................ 2
1.5 PROJECT INFORMATION ............................................................................................ 2
1.6 INTERPRETATION OF INFORMATION ..................................................................... 2
1.7 DETERMINATION......................................................................................................... 3
1.8 EXCLUSION OF COST QUOTATIONS........................................................................ 3
SECTION 2 SCOPE OF PREQUALIFICATION .............................................................................4
2.1 INTENT ........................................................................................................................... 4
2.2 EXPERIENCE REQUIREMENT .................................................................................... 4
SECTION 3 SUBMITTAL INFORMATION....................................................................................5
3.1 GENERAL ....................................................................................................................... 5
PREQUALIFICATION SUBMITTAL FORM ...................................................................... 6
PART I. ESSENTIAL REQUIREMENTS FOR QUALIFICATION.............................. 7
PART II. ORGANIZATION, HISTORY, ORGANIZATIONAL PERFORMANCE,
COMPLIANCE WITH CIVIL AND CRIMINAL LAWS................................ 9
PART III. RECENT CONSTRUCTION PROJECTS COMPLETED ............................. 19
CONTRACTOR EXPERIENCE AND REFERENCES FORM .......................................... 20
SECTION 4 BASIS OF DETERMINATION.............................................................................. 21
4.1 GENERAL ..................................................................................................................... 21
4.2 RESPONSIVENESS ...................................................................................................... 21
4.3 CAPABILITY ................................................................................................................ 21
APPENDIX A – PROJECT DESCRIPTIONS
APPENDIX B – CONTRACTOR PREQUALIFICATION SCORING
NOTICE TO CONTRACTORS
Notice is hereby given that all electrical contractors and subcontractors that intend to submit a bid
for performance of the identified electrical work listed below on East Bay Municipal Utility
District (EBMUD) projects are required to complete the prequalification questionnaire, provide all
requested materials, and be approved by EBMUD to be on the final qualified bidders list.
Bids that include an electrical contractor or subcontractor (hereinafter referred to as “Contractor”)
of any tier that has failed to comply with these requirements will be rejected as nonresponsive. If
two or more business entities expect to perform the identified electrical work as part of a Joint
Venture, each entity within the Joint Venture must be prequalified in order to qualify for bidding.
Contractors on the final qualified electrical bidders list will be eligible to bid on the selected
projects identified in Appendix A. Projects identified in Appendix A are anticipated to be awarded
in the near future, and are provided as examples of the types of projects that will use the list. Not
all EBMUD projects will require the usage of this list. Electrical Contractor prequalification, if
required for a specific project, will be identified in the Instructions to Bidders of the specifications
for the project.
Bidding Period
If a contractor wishes to submit during the initial prequalification period, applications must be
received by the time and date listed in the Submission of Prequalification Package section below.
After the initial prequalification period, applications may be submitted during the continuously
open period.
Identified Electrical Project Work
Identified projects are those projects in which electrical Contractors will perform construction of
industrial electrical power distribution and control systems at water and wastewater facilities, and
the delivery, storage, handling, installation, and testing and commissioning of equipment which
include, but are not limited to, any of the following:
Anchors, fasteners, hangers and supports for the electrical equipment
Outlet boxes, junction and pull boxes
Wiring devices (including wall switches, receptacles, device plates)
Low and medium voltage fused and non-fused disconnect switches
Exposed and concealed raceways (including rigid steel conduit, PVC coated rigid steel conduit,
liquid-tight flexible steel conduit, PVC schedule 40 conduit, wireways, cable trays)
Low voltage and medium voltage shielded power cable, shielded instrumentation cable
Permanent and temporary electric power and communication services
Low and medium voltage electric motors and motor controllers
Fiber optic cables and accessories (terminations, splices, patch panels)
Fire alarm systems
Grounding systems
Low voltage switchboards
Low and medium voltage motor control centers
Electrical Contractors and Subcontractors
Request for Prequalification
i
11/16/2020
Low and medium voltage generator sets and auxiliaries (including starting batteries, load
banks, fuel monitoring systems)
Low voltage panelboards
Busways
Low voltage dry-type and medium voltage dry-type and liquid-filled transformers
Low voltage uninterruptible power supplies
Photovoltaic power systems (including PV panels, combiner boxes, and inverters)
Low voltage and medium-voltage metal-clad switchgear
Indoor and exterior LED based lighting systems and controls
Emergency lighting and exit signs
Underground nonmetallic concrete encased duct banks and direct buried raceways
Protective devices (including low and medium voltage fuse and circuit breakers, protective
relays)
Local control panels (including remote telemetry units, programmable logic controllers, human
machine interfaces, Ethernet switches, DC power supplies, control relays, selector switches,
indicating lights, pushbuttons)
Security system components (including interior and exterior pan-tilt-zoom closed circuit
television cameras and controllers , card readers, infrared beam transmitters and receivers,
intercoms, motorized gate operators, door alarm switches)
Wireless 900 MHz spread spectrum radio telemetry systems
Low and medium voltage variable frequency drives (VFD)
Low and medium voltage reduced voltage solid state motor starters
Direct current battery systems (including battery chargers and monitoring equipment
Capacitors and line reactors
Underground manholes and pullboxes
Overhead power distribution and communications cables and poles
Automatic and manual transfer switches
Perform harmonic testing
Perform international electrical testing association (NETA) Acceptance Testing Standards,
including testing for all electrical equipment
Process control and instrumentation (including pressure, level, flow, and vibration sensors,
transmitters, and switches; and water quality analyzers)
Pipeline cathodic protection systems and corrosion monitoring systems
A copy of the Request for Prequalification of Electrical Contractors and Subcontractors, along
with any addenda to this document, and questions and answers, will be posted on the EBMUD
Current Construction Bids Opportunities webpage, under “Request for Prequalification of
Electrical Contractors and Subcontractors for Selected EBMUD Projects”
https://www.ebmud.com/business-center/construction-bids/current-construction-bids. It is the
responsibility of the bidder to frequently check the website for updated information.
The current Prequalified Electrical Contractors List will be included as part of the Contract
Documents of the project requiring usage of the list.
Basis of Rating
Electrical Contractors and Subcontractors
Request for Prequalification
ii
11/16/2020
EBMUD will provide a pass/fail score for each contractor based on responses to questions
contained in the attached questionnaire. EBMUD reserves the right to check other sources
available and contact listed references. EBMUD’s decision will be based on objective evaluation
criteria.
Contractor must demonstrate ability to perform installation work in accordance with the
California Electrical Code (CEC) and in a neat and workmanlike manner in accordance with
National Electrical Contractors Association (NECA) Standards.
See Section 4 – Basis of Determination and Appendix B – Contractor Prequalification Scoring for
additional information on scoring criteria.
Prequalification Approval
Prequalification approval will be valid for one calendar year after the date of Contractor
notification. However, EBMUD reserves the right to adjust, limit, suspend or rescind the
prequalification rating based on subsequently learned information. Prequalified Contractors whose
rating changes sufficiently to disqualify them will be notified and given an opportunity to appeal a
prequalification rating consistent with the appeal procedures described below.
The intent of the prequalification questionnaire and documents is to allow the District to identify
qualified contractors prior to contract award to aid EBMUD in selecting the lowest responsive,
responsible bidder. Neither the fact of prequalification nor any prequalification rating will
preclude EBMUD from a post-bid consideration and determination of whether a bidder or its
subcontractors have the quality, fitness, capacity and experience to satisfactorily perform the
proposed work.
Submission of Prequalification Package
If submitting during the initial prequalification period, the submittal must be received by Wednesday
4:00PM, December 30, 2020.
Contractors may submit an application at any time after the initial prequalification period. However,
if submitting for a specific EBMUD project, the submittal must be received at least 21 calendar
days before the initial bid opening date. EBMUD will make its best efforts to review the
completed submittal upon receipt, but makes no guarantee a determination will be made in time for
bid submittal on the specified project. See the Instructions to Bidders of the specific project for more
information.
See Section 1 – Instructions for Prequalification Submittals for detailed submission instructions.
Each questionnaire must be signed under penalty of perjury by an individual who has the legal
authority to bind the contractor on whose behalf that person is signing. If any information
provided by a contractor becomes inaccurate, the contractor must immediately notify EBMUD
and provide updated accurate information in writing, under penalty of perjury.
EBMUD reserves the right to waive minor irregularities and omissions in the information
contained in the prequalification application submitted, to determine at any time that the
prequalification procedures will not be applied to a specific future public works project, and to
make all final determinations.
Electrical Contractors and Subcontractors
Request for Prequalification
iii
11/16/2020
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow GAOA Housing Facility Upgrades Active Contract Opportunity Notice ID 127EAW26Q0027 Related Notice

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/16/2026

EXT REC | CON26-0001 Marina Dredging - SF First Format : Sell |

City and County of San Francisco

Bid Due: 12/31/2026

Bid Number: 23-206 Addendum No. 1 Bid Title: Sanger HSP Cycle 11 Project

Sanger city

Type Title Deadline Status Notice Berth 24 Backlands Redevelopment Project 06/22/2026 until 12:00

Port of Oakland

Bid Due: 6/22/2026