Request for Information (RFI) for Request for Information (RFI) For B-52 Advanced Wing Weapons Pylon (AWWP)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | May 6, 2026 |
| Due Date: | Jul 6, 2026 |
| Solicitation No: | FA8628-27-R-B001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: May 06, 2026 09:03 am EDT
- Original Response Date: Jul 06, 2026 05:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jul 21, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: 1560 - AIRFRAME STRUCTURAL COMPONENTS
-
NAICS Code:
- 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
-
Place of Performance:
Edwards , CAUSA
The Department of the Air Force is issuing this Request for Information (RFI) to conduct market research and identify qualified industry partners capable of supporting an accelerated Engineering and Manufacturing Development (EMD) phase and subsequent production of a replacement external weapons release pylon for the B-52 aircraft.
To meet emerging mission needs, the Government requires a newly designed Advanced Wing Weapons Pylon (AWWP) that incorporates MIL-STD-1760 series heavy weapon capability.
The anticipated acquisition strategy targets a 36-month EMD phase culminating in a Critical Design Review (CDR). Upon successful completion of the EMD phase, the design must be ready for integration with required support equipment, transitioning immediately into the production of 20 to 24 pylons (with a minimum delivery of 12 pylons in the first year).
Key Objectives for Industry Feedback:
-
Assess the feasibility of the proposed 36-month EMD timeline to CDR and production timeline.
-
Identify vendors with the engineering expertise to design and manufacture heavy weapons carriage systems (>5,000 lbs capacity).
-
Inform the Government's overall Acquisition Strategy.
Note: Physical work locations may vary, and interested parties must be willing and able to travel. Small businesses are highly encouraged to participate and respond to this RFI.
- CP 937 713 6290 2690 LOOP ROAD WEST BLDG 556
- WRIGHT PATTERSON AFB , OH 45433-7148
- USA
- Ashley Gray
- ashley.gray.9@us.af.mil
- Matthew Lesko
- matthew.lesko@us.af.mil
- May 06, 2026 09:03 am EDTSources Sought (Original)
See Also
Bid Title: Sales Tax RFP 2026 Category: Bids Status: Open Description: The City
City of Foster City
Due by 9/25/2026
Bid Title: Sales Tax RFP 2026 Category: Finance Status: Open Description: The City
City of Foster City
Due by 9/25/2026
Number Title Type NAICS Code(s) Due Date Issue Date Status RQ145617(2) FLAP ASM
LA Metro
Due by 9/24/2026
Follow Rendezvous, Proximity Operations (RPO) Threat Response (RTR) VICTUS Responsive Launch Space Vehicle
DEPT OF DEFENSE
Due by 10/19/2026