Request for Bids - 2026 Water Mains (Dover, 10th, 11th, and Larson).pdf
| Agency: | City of Salina |
|---|---|
| State: | Kansas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 15, 2026 |
| Due Date: | Aug 6, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Name | Size | |
| File | Request for Bids - 2026 Water Mains (Dover, 10th, 11th, and Larson).pdf | 140.7 KB |
Attachment Preview
REQUEST FOR BIDS
The City of Salina, Kansas is currently accepting sealed bids for the following project, at
the office of the City Clerk, City-County Building 300 West Ash, Room 206 Salina, Kansas,
until 2:00 p.m. (Central), Thursday, August 6, 2026, at which time the bids will be opened
publicly and read aloud.
PROJECT NO. 26017
2026 WATER MAIN REPLACEMENT PROJECT
PHASE 1 - DOVER DR
* Install 12-inch (36 Linear Feet) DICL Water Main
* Install 6-inch (36 Linear Feet) DICL Water Main
* Install 6-inch (1,725 Linear Feet) Water Main
* Install Fire Hydrants & Valve Assemblies (2 Each)
* Remove Fire Hydrants & Valve Assemblies (2 Each)
* Install Resilient Gate Valves: 12-inch (1 Each); 6-inch (7 Each)
* Install Water Services: 1" (17-Long, 16-Short)
* Remove & Replace Private Sanitary Sewer Main: (20 Linear Feet)
* Remove & Replace Sanitary Sewer Main: 8-inch (20 Linear Feet)
* Abandon Existing Water Line Valves (8 Each)
* Tracer Wire Connection Terminals (3 Each)
* Remove and Replace Water Meter Pit, One Meter (2 Each)
* Remove and Replace Water Meter Pit, Two Meters (1 Each)
* Remove, Replace, and Relocate Water Meter Pit, One Meter (19 Each)
* Remove, Replace, and Relocate Water Meter Pit, Two Meters (5 Each)
*
PHASE 2 - 10TH AND 11TH ST
* Install 6-in (18 Linear Feet) DICL Water Main
* Install 6-inch (3,165 Linear Feet) Water Main
* Install Fire Hydrants & Valve Assemblies (7 Each)
* Remove Fire Hydrants & Valve Assemblies (6 Each)
* Install Tapping Sleeve, Valve and Valve Box (12" x 6") (3 Total)
* Install Resilient Gate Valves: 6-inch (7 Each)
* Install Water Services: 2" (1-Long); 1.5" (14-Long); 1" (30-Long, 38-Short)
* Abandon Existing Water Line Valves (9 Each)
* Tracer Wire Connection Terminals (9 Each)
* Remove Abandoned Meter Pit (1 Each)
* Remove and Replace Water Meter Pit, One Meter (30 Each)
* Remove and Replace Water Meter Pit, Two Meters (8 Each)
* Remove, Replace, and Relocate Water Meter Pit, One Meter (35 Each)
* Remove, Replace, and Relocate Water Meter Pit, Two Meters (8 Each)
RB-1
PHASE 3 - LARSON ST
* Install 6-inch (18 Linear Feet) DICL Water Main
* Install 6-inch (750 Linear Feet) Water Main
* Install Fire Hydrants & Valve Assemblies (2 Each)
* Remove Fire Hydrants & Valve Assemblies (1 Each)
* Install Tapping Sleeve, Valve and Valve Box (8" x 6") (1 Total)
* Install Resilient Gate Valves: 6-inch (1 Each)
* Install Water Services: 1" (11-Long, 9-Short)
* Abandon Existing Water Line Valves (7 Each)
* Tracer Wire Connection Terminals (2 Each)
* Remove and Replace Water Meter Pit, One Meter (19 Each)
* Remove, Replace, and Relocate Water Meter Pit, One Meter (1 Each)
The drawings, specifications and other contract documents are the property of the City of
Salina, Kansas, and are available for public inspection at the office of the Director of Utilities,
City-County Building 300 West Ash, Room 205, Salina, Kansas. Please contact the Utilities
Department at 785-309-5725 with any questions in regard to the project. The documents may be
obtained from the office of the Director of Utilities upon payment of $60.00, which is non-
refundable.
The City of Salina, Kansas, reserves the right to reject any or all proposals and to waive
any irregularities therein.
THE CITY OF SALINA, KANSAS
/s/ Nikki Goding
CITY CLERK
RB-2
See Also
Event Name Cherryvale Rest Area Flooring Repair Business Unit Department of Transportation Event
State Government of Kansas
Due by 9/29/2026
Follow Z2DA--589A7-23-306 Renovate Bldg. 5 & 5B for Mental Health FY27 NRM Active
VETERANS AFFAIRS, DEPARTMENT OF
Due by 10/19/2026
Contract: 526106131 Call #: 613 Project Number: K099-075 KA 8080-01 Federal Project Number:
State Government of Kansas
Due by 10/21/2026
Contract: 526106212 Call #: 621 Project Number: K015-021 KA 8097-01 Federal Project Number:
State Government of Kansas
Due by 10/21/2026