Replacement of water source heat pumps for geothermal system
| Agency: | City of Lebanon |
|---|---|
| State: | New Hampshire |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 9, 2024 |
| Due Date: | Nov 15, 2024 |
| Solicitation No: | 2024-RFx-013 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 2024-RFx-013
Title: Replacement of water source heat pumps for geothermal system
Addenda: 0
Release Date: 8/9/2024
Due Date: 11/15/2024
The library is looking for quotes to replace three heat pumps in a geothermal system at the Kilton Public Library. The existing heat pumps are fourteen years old, and are reaching the end of their expected life. They are supplemented by a small propane boiler. The geothermal system as it is currently set up will not keep the building warm in a very cold winter without the supplemental heat from the propane boiler. The attachments include specs for the current heat pumps we have.
The Kilton Public Library is a LEED Gold building, so sustainability was built into the plans for it. If we could increase the efficiency of the system to be able to use the propane boiler less frequently, that would be ideal.
9 East Park Street
Lebanon, NH 03766
See Also
Bid Number: RFP 08-27 Bid Title: RFP 08-27 ARENA REFRIGERATION SYSTEM REPLACEMENT Category:
City of Concord
Due by 9/24/2026
Bid Number: RFP 08-27 Bid Title: RFP 08-27 ARENA REFRIGERATION SYSTEM REPLACEMENT Category:
City of Concord
Due by 9/24/2026
Follow Construction Services for Replace Siding on All Buildings at the New Hampshire
LABOR, DEPARTMENT OF
Due by 10/05/2026
CM Services - KSC Student Center, Mabel Brown Room Theatrical and House Lighting
University of New Hampshire
Due by 10/01/2026