REPLACEMENT OF IN-SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST
| Agency: | Town of Manchester |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 24, 2026 |
| Due Date: | Mar 9, 2026 |
| Solicitation No: | 25/26-35 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 25/26-35
Title: REPLACEMENT OF IN-SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST
Addenda: 1
Release Date: 2/9/2026
Due Date: 3/9/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
NOTICE IS HEREBY GIVEN that the Town of Manchester, Connecticut, herein called the Town, acting by and through its Town Manager will receive sealed Bids for project Bid No. 25/26-35 REPLACEMENT OF IN-SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST . Bids will be accepted via the Town's eProcurement Portal until 2:00 pm on Monday, March 9, 2026 at which time and place said bids will be publicly opened and read aloud.
Bids may be submitted prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered.
Background
Work under this contract includes the replacement of approximately thirty (30) existing in-service 16-inch butterfly valves and fifty (50) gate valves, varying in size from 4-inches to 12-inches, with new resilient wedge gate valves located along the Town-owned section of Main Street (trailblazed as Route 83) primarily in the Downtown section of the Town of Manchester between Hartford Road and US Route 6/44 (Center Street). Included with the primary work in the Downtown area, there are three additional spot locations with valve replacements within the CT Dept. of Transportation-owned Route 83 (S Main St) right of way used to isolate the water main carried by the S Main St bridge over I-384 (valves are located beyond bridge limits/outside I-384 right of way). The project's valves identified have either failed or are at the end of service life and need to be replaced as part of system maintenance.
Work includes other appurtenant work such as installation of resilient wedge gate valves at new locations, replacement of existing water main segments with ductile iron pipe ranging in size from 4-inches to 16-inches as part of reconnecting the replacement valve installations, temporary and permanent pavement repair, and traffic control. The Work may include the installation of various size insertion valves and line-stops to facilitate gate valve installations.
The Project Schedule for this project is projected to be completed within ONE HUNDRED FIFTY (150) WORKING DAYS (contract days).
Timeline
https://us06web.zoom.us/j/83742378233?pwd=MTZ2Q1kackMldELNqYEyU1xvhRKpyn.1
Meeting ID: 837 4237 8233
Passcode: 1zPDzZ
---
One tap mobile
+13052241968,,83742378233#,,,,*160266# US
+13092053325,,83742378233#,,,,*160266# US
Join instructions
https://us06web.zoom.us/meetings/83742378233/invitations?signature=glabt9tsnFvIVlrr1LQECrRXR9VDUOJ3NN8Hwm7g23w
See Also
Invitation to Bid for Construction Services Old New-Gate: Viets Rehabilitation 106 New Gate
State Government of Connecticut
Due by 10/14/2026
Willow Brook Park Tennis Court Rehabilitation The scope of work generally consists of
State Government of Connecticut
Due by 9/25/2026
Number 8749 Title ADA Compliant Bathrooms at the Mattatuck Historical Society Available Date
City of Waterbury
Due by 9/23/2026
Heroes Tunnel Rehabilitation and Route 15 Interchange 46 Improvements Start Date : August
State Government of Connecticut
Due by 9/24/2026