Replacement of Hydraulic System for Penstock #5
| Agency: | INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO |
|---|---|
| State: | Texas |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | May 15, 2025 |
| Due Date: | Jul 2, 2025 |
| Solicitation No: | 191BWC25B0003 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: May 15, 2025 10:54 am MDT
- Original Published Date: May 12, 2025 01:51 pm MDT
- Updated Date Offers Due: Jul 02, 2025 03:00 pm MDT
- Original Date Offers Due: Jul 02, 2025 03:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jul 17, 2025
- Original Inactive Date: Jul 17, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1KA - CONSTRUCTION OF DAMS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Del Rio , TX 78840USA
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the replacement of the hydraulic system for Penstock #5 in Amistad Dam. This penstock has not been functional in several years. The successful Offeror will fully inspect system and structures and replace hydraulic system to fully restore Penstock #5 to full functionality.
The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, replacement of Penstock #5 hydraulic system, disposal of debris and construction waste, quality control testing, and if awarded, the manufacturer of a new penstock bulkhead.
The following site constraints apply:
- The working hours of the adjacent USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work onsite during these proposed hours. USIBWC facilities, including the dam, are closed during all Federal Holidays.
- There is currently only 1 penstock bulkhead, located at Amistad Dam and it is moved via mobile crane. Only 1 penstock can be bulk headed at a time for servicing so design inspections must be coordinated with Amistad Field Office AOM through the COR. Amistad Field Office does not have a certified crane operator at this time so the Contractor must provide a crane an certified operator to perform the relocation of the bulkhead. Several relocations may be required. The bulkhead is approximately 14.3 feet wide by 24.6 feet tall. The weight of the bulkhead gate with lifting beam is approximately 33,000 pounds (16.5 Tons).
- Access to the site is made via Texas Spur 349. Texas Spur 349 bridge inventory rating is limited to HS-20. The load capacity of the embankment crest road is 70,000 pounds.
- Workers must pass through the port of entry to access the worksite. The port of entry is open from 10:00 a.m. to 6:00 p.m. DHS may change these hours without notice. If the Contractor requires to begin work prior to the port of entry opening or after closing, this must be coordinated with the Amistad Dam Area Operations Manager. Workers crossing through the port of entry need to have proper documentation for reentry to the United States.
Per FAR 36.204, the magnitude of the project is estimated between $1,000,000 and $5,000,000.
The work is located in Val Verde County, Texas. A site visit date will be listed in the Solicitation. The work will be performed under NAICS Code 237990. The Contract will be firm-fixed price.
All work is proposed to be completed within four hundred and eighty five (485) calendar days after the Notice to Proceed.
- Three sixty-five (365) calendar days are anticipated for construction.
- The final paperwork for closeout of the Contact shall be completed within one hundred and twenty (120) calendar days of completion of construction.
The time for completion of final paperwork is included in the four hundred and eighty five (485) calendar days. The time stated for completion shall include final cleanup of the premises.
This Solicitation will be issued pursuant to FAR Part 14.
All responsible sources must submit a bid to be considered by the Agency.
Please see document named SBU Document Notice for information in receiving additional documentation.
- 4191 N. Mesa
- El Paso , TX 79902
- USA
- Adrian Knights
- adrian.knights@ibwc.gov
- Phone Number 9158324794
- Seone Michael Jones
- seone.jones@ibwc.gov
- May 15, 2025 10:54 am MDTSolicitation (Updated)
- May 14, 2025 11:43 am MDT Solicitation (Updated)
- May 12, 2025 01:51 pm MDT Solicitation (Original)
- Apr 20, 2025 09:55 pm MDT Presolicitation (Original)
Related Document
| Mar 19, 2025 | [Presolicitation (Original)] Replacement of Hydraulic System for Penstock #5 |
| May 12, 2025 | [Solicitation (Original)] Replacement of Hydraulic System for Penstock #5 |
| May 14, 2025 | [Solicitation (Updated)] Replacement of Hydraulic System for Penstock #5 |
| Jun 10, 2025 | [Solicitation (Updated)] Replacement of Hydraulic System for Penstock #5 |
| Jun 25, 2025 | [Solicitation (Updated)] Replacement of Hydraulic System for Penstock #5 |
| Jul 2, 2025 | [Solicitation (Updated)] Replacement of Hydraulic System for Penstock #5 |
| Jul 3, 2025 | [Solicitation (Updated)] Replacement of Hydraulic System for Penstock #5 |
| Oct 3, 2025 | [Award Notice (Original)] Replacement of Hydraulic System for Penstock #5 |
See Also
Project: PW 2027 Asphalt Resurfacing Contract 3, City Project No. 106794 Ref. #:
City of Fort Worth
Due by 9/24/2026
Solicitation Details eResponse Instructions Subscribe Print PDF Type: Invitation For Bids (IFB) Status:
City of Austin
Due by 10/22/2026
Title New Maintenance Facility Available Date 8/28/2026 9:13 AM Clarification Deadline 9/23/2026 5:00
The Port of Corpus Christi
Due by 9/24/2026
Bid Information Type Competitive Sealed Proposal Status Issued Number 9072 (Neighborhood 7B &
City of Denton
Due by 10/07/2026