| Agency: | North Carolina State University |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 13, 2026 |
| Due Date: | Feb 20, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Institution | UNC Pembroke | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://www.uncp.edu/info-for/external-vendors.html | |||||
| Project Name | Replacement of Fire Alarm Panels (Lowry, Locklear, Moore, Oxendine, UC, Pinchback) | |||||
| Type of Services | Engineering/Architectural | |||||
| Project Manager | Matt Greene | |||||
| Phone Number | ||||||
| Contact Email | matt.greene@uncp.edu | |||||
| Closing Date | 02/20/2026 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
The University of North Carolina Pembroke (UNCP) is seeking letters of interest from qualified professionals to provide complete design and construction administration services for Fire Alarm Control Panels (FACP) and all system devices. These systems are comprised of both addressable and non-addressable systems. All systems have annunciators, duct detectors, heat detectors, smoke detectors, audible / visual devices, pull stations, remote power supplies and back up battery systems. All systems are to be replaced with modern, addressable systems and all devices on the system are to be replaced upgrading the fire alarm control panel in D.F. Lowry, Locklear Hall, Moore Hall, Oxendine Science, Pinchback Maintenance and Facilities. Added 2/13/2026: Evaluation will be based on the published expanded information criteria. Information discussed at the non-mandatory pre-proposal meeting was clarifying only and did not add to or modify the published evaluation criteria. Firms are requested to assure receipt of One (1) electronic copy via email in PDF format to the project contact with a copy to douglas.hall@uncp.edu by Noon on 02/17/2026. The current schedule is: - 02/03/2026 Pre -Submittal Meeting @ 10am (virtual via Webex URL above) - 02/27/2026 Finalists Notified - 03/24/2026 Interviews (Virtual) So that the selection process is as objective as possible, from the date of this public announcement, applicants are not to communicate with members of the Board of Trustees, Campus Officials, and staff other than the Project Contact. All communications to the project contact are to be via email only, to Matt Greene at matt.greene@uncp.edu with a copy to Douglas Hall at douglas.hall@uncp.edu
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
UNC Pembroke Matt Green Project Manager Facilities Planning, Design and Construction 1 University Drive Pembroke, NC 28372
|
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Sources Sought - Installation, testing, and training of industrial and trade equipment
DEPT OF DEFENSE
Bid Due: 6/17/2026
Follow Internal Revenue Service (IRS) Greensboro, NC - Electrical and Data Cabling Installation
TREASURY, DEPARTMENT OF THE
Bid Due: 6/05/2026
Follow FY26 CALO HOUSING GENERATOR DORM 205 Active Contract Opportunity Notice ID 140P5326Q0020
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/08/2026
Follow N--FY26 CALO HOUSING GENERATOR DORM 205 Active Contract Opportunity Notice ID 140P5326Q0020
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/10/2026