REPLACEMENT OF BRIDGE NO. 07143 QUAKER ROAD OVER HALEY'S BROOK
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 21, 2025 |
| Due Date: | Sep 25, 2025 |
| Solicitation No: | PWC 26-08 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The project generally consists of, but is not limited to: Replacement of Bridge No. 058015, Quaker Farm Road over Haley’s Brook, Groton, CT. The existing structure, consisting of two 54” dia. Corrugated metal pipes, is to be removed and replaced with a 26-foot span bridge consisting of prestressed concrete deck units supported by concrete abutments and pile foundations. A natural streambed will be constructed with native material. Regrading of embankment slopes is also required to provide a shelf for installation of guiderail.
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax: kklein@groton-ct.gov
See Also
Follow Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Active Contract
DEPT OF DEFENSE
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
City of Stamford
Due by 12/10/2026
RFQ.RFP #2-2627 Saw Mill Rd Affordable Housing Project The Town of Guilford is
State Government of Connecticut
Due by 12/01/2026
Follow Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Active Contract
DEPT OF DEFENSE
Due by 11/12/2026