Replacement of Bathrooms and Re-piping of potable water lines
| Agency: | STATE, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jul 25, 2025 |
| Due Date: | Sep 1, 2025 |
| Solicitation No: | PR15462106 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Jul 25, 2025 10:51 am CEST
- Original Date Offers Due: Sep 01, 2025 05:00 pm CEST
- Inactive Policy: Manual
- Original Inactive Date: Sep 01, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: S201 - HOUSEKEEPING- CUSTODIAL JANITORIAL
-
NAICS Code:
- 56172 - Janitorial Services
-
Place of Performance:
Berlin , DE-BEDEU
This project entails the re-piping of the potable water lines from the basement level boiler room and water meter room (hot and cold water and hot recirculation) to all the associated bathroom and laundry area fixtures on both levels of the house which includes 6 bathrooms and 2 laundry areas, 2 kitchens included. The existing potable water lines to these described areas, where practical, will be removed. Where the existing lines are located in areas of the house that will not be affected by the work (i.e., embedded in cement under the tiled floors), these lines will be disconnected and left in place, fully drained and capped if necessary. The garden water line will be renewed until the living room. The line will be left untouched underneath the living room floor.
A new and more practical route will be chosen for the new potable water lines after a site visit(s), and will be mutually agreed upon with the Contractor and Embassy COR/CO. The tiles in the hallways, laundry rooms and kitchens shall also be removed and replaced the same as in the bathrooms with all corresponding work included.
The kitchen furniture, built-in cabinets and the existing shelving will be removed by the Embassy workshops and be reinstalled after the contracted work is done.
This project also includes the work and materials/technical supplies for the complete renovation of the 6 bathrooms in the multifamily house, referred to as Apartment 1 and Apartment 2 at Goldfinkweg 32, 14195 Berlin-Dahlem.
NOTE: A SITE VISIT IS MANDATORY
- DEPARTMENT OF STATE, 2201 C ST NW
- WASHINGTON , DC 20520
- USA
- Berlin Procurement
- BerlinEinkauf@state.gov
- Jul 25, 2025 10:51 am CESTSolicitation (Original)
See Also
Follow MT BFTC CARPET REPLACEMENT CONFERENCE ROOM Active Contract Opportunity Notice ID 140FF027Q0034
INTERIOR, DEPARTMENT OF THE
Due by 11/13/2026
Follow S--PEST CONTROL Active Contract Opportunity Notice ID 140A2327Q0300 Related Notice Department/Ind. Agency
INTERIOR, DEPARTMENT OF THE
Due by 11/20/2026
Follow BGNDRF CUSTODIAL SERVICES Active Contract Opportunity Notice ID 140RR027Q0001 Related Notice 140RR027Q0001
INTERIOR, DEPARTMENT OF THE
Due by 11/18/2026
Follow Snow Removal Services, Westville Lake, Southbridge, MA Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 11/16/2026