Replace Roofs 682, 1408, and 1409-Amendment 0001
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Alabama |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Sep 24, 2025 |
| Due Date: | Sep 26, 2025 |
| Solicitation No: | FA330025RFP0588 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Sep 24, 2025 01:53 pm CDT
- Original Published Date: Sep 11, 2025 04:47 pm CDT
- Updated Date Offers Due: Sep 26, 2025 12:00 pm CDT
- Original Date Offers Due: Sep 23, 2025 12:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Oct 11, 2025
- Original Inactive Date: Oct 08, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
-
NAICS Code:
- 238160 - Roofing Contractors
-
Place of Performance:
Montgomery , AL 36112USA
RFIs - 24 September 2025
RFI Question: Does Bldg 1408 and 1409 need a NEW lightning protection system, including new downleads and grounds, to meet the requirements provided in the amendment?
Response: Just the points that are in contact with new roof system. The Lightening Protection is on both buildings now. The problem is that, its copper. We are changing the roof system from concrete tils to a steel roof system. Copper cannot be used on a metal roof system. So all points connected to the new roof system has the be aluminum. In the attic, these parts will be converted from aluminum back to copper wire in the attic per code.
RFI Question: To clarify, does the lightning protection system need to be installed on all 3 buildings or just BLDG 1408 as shown in the updated drawing?
Response: Buildings 1408 and 1409 are the same buildings, therefore lightening protection will need to be included for buildings 1408 and 1409.
Amendment 001 - 23 September 2025
The purpose of this Amendment is to:
a) To extend the proposal receipt date to 12PM CDT, 26 September 2025.
b) Add updated drawings for this requirement (Note drawings Building 862; to read Remove concrete tiles. Repair decking and install Boral Tile-Seal or equal. Install Stone Coated Steel).
c) Demolish the existing lightning protection system from concrete tile roof system at attic and convert to medal roofing system. Design and install a new system in accordance with NFPA 780. The new system must be tested and certified by Lightning Protection Institute.
d) POC(s): Contract Specialist Mrs. Kemeshia Smith; Phone (334) 953-2560 or kemeshia.smith@us.af.mil or Contracting Officer Mr. Eldrae Perdue (334) 953-3518.
e) All other terms and conditions remain unchanged and in full effect.
RFIs - 18 September 2025
682
Is 682 is a two-story building? Yes
The drawings call for Asphalt Shingles. Is this correct or will the new roof system be Stone Coated Steel? Drawing A-1 says to install stone coated steel.
1408
Is 1408 a five-story building? Yes
The drawings do not show porches are they to be included? Drawing 4 in the package shows the porches, see revised drawings
1409
Is 1409 a five-story building? Yes
The drawings do not show porches are they to be included? Yes include the porches, see revised drawings.
General
Please confirm that the amounts of deck replacement and rafter replacement on the drawings is correct.
The solicitation states that the acquisition is unrestricted, yet the size standard is $19,000,000. Is this project set aside for Small Businesses only? Yes, this is a small business set aside.
11 September 2025
Furnish all plant, labor, materials, and equipment necessary to perform all work in connection with Project Number, PNQS 25-9165 Repair Roofs 682, 1408, 1409, at Maxwell AFB, Alabama, in accordance with the attached specifications and drawings.
- ADMINISTRATIVE ONLY NO REQUISITIONS 50 LEMAY PLAZA S
- MAXWELL AFB , AL 36112-6334
- USA
- Kemeshia Smith
- kemeshia.smith@us.af.mil
- Phone Number (334)953-2560
- Eldrae A. Perdue
- eldrae.perdue@us.af.mil
- Phone Number (334) 953-3518
- Sep 24, 2025 01:53 pm CDTSolicitation (Updated)
- Sep 24, 2025 11:06 am CDT Solicitation (Updated)
- Sep 23, 2025 10:16 am CDT Solicitation (Updated)
- Sep 18, 2025 09:52 am CDT Solicitation (Updated)
- Sep 11, 2025 04:47 pm CDT Solicitation (Original)
Related Document
| Sep 11, 2025 | [Solicitation (Original)] PNQS 25-9165 Repair Roofs 682, 1408, and 1409 |
| Sep 18, 2025 | [Solicitation (Updated)] PNQS 25-9165 Repair Roofs 682, 1408, and 1409 |
| Sep 23, 2025 | [Solicitation (Updated)] Replace Roofs 682, 1408, and 1409-Amendment 001 |
See Also
Revenue Multipurpose Meeting Room Renovations Facilities Maintenance Bid/RFP #: MCFM-2026-023 Date Posted: Thursday,
Mobile County
Due by 9/30/2026
Project ID: Title: The River Front Stage at the Silos Project Addenda: 0
City of Montgomery
Due by 9/29/2026
ITB - GULF STATE PARK CAMPGROUND BATH HOUSES DRAIN REPAIRS **** PROPOSAL DEADLINE
Alabama Department of Conservation and Natural Resources
Due by 9/23/2026
2027 Annual Contract for Manhole Rehabilitation Contract or Solicitation Number M5712-2867 Solicitation Description
Mobile Water Service System(MAWSS)
Due by 10/05/2026