Replace Housing Unit A Boilers
| Agency: | JUSTICE, DEPARTMENT OF |
|---|---|
| State: | West Virginia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 17, 2025 |
| Due Date: | Mar 24, 2025 |
| Solicitation No: | 15BFA025Q00000118 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Mar 17, 2025 01:10 pm EDT
- Original Response Date: Mar 24, 2025 10:00 am EDT
- Inactive Policy: Manual
- Original Inactive Date: Apr 08, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 4410 - INDUSTRIAL BOILERS
-
NAICS Code:
- 332410 - Power Boiler and Heat Exchanger Manufacturing
-
Place of Performance:
Alderson , WV 24910USA
1.0 GENERAL
1.1 Introduction
The Federal Bureau of Prisons, FPC Alderson, located at Glen Ray RD. Box Alderson, WV 24910, intends to make a single award to a responsible entity that will provide all necessary equipment to replace (2) two Lochinvar PBN1701-M13 Power Fin Boilers with 2 (two) new hot water boilers.
1.2 Background
FPC Alderson is a federal prison camp, which houses approximately 700 inmates. The prison was constructed in 1927. The institution is currently seeking to replace (2) two hot water boilers and all necessary components. FPC Alderson will purchase and install the (2) two hot water boilers in-house.
2.0 REQUIREMENTS
2.1 Equipment
A. High-efficiency hot water boilers designed for commercial heating applications.
B. AHRI Gross Output Rating: 1445 MBH (Maximum)
C. AHRI Input Rating:
D. Maximum: 1700 MBH
E. Minimum: 340 MBH
F. Net AHRI Rating (Water): 1257 MBH
G. Appliance Water Content: 5.75 gallons
H. Water Connections: 2-1/2” (inlet/outlet)
I. Gas Connections: 1-1/2”
J. Air and Vent Connections: 7”
K. Must support at least one of the following communication protocols:
a. BACnet
b. LONtalk
c. MODBUS
L. Equipment shall be supplied with a minimum of manufacturer warranty period of 10 years, to include the heat exchanger and/or tank against failure due to defects in materials or workmanship. For the lifetime of the product, the tank and/or heat exchanger against failure due to thermal shock should also be included. All parts are warranted for 1 year.
- USAF RES CMPLX 346 MARINE FORCES DR
- GRAND PRAIRIE , TX 75051
- USA
- Anne Bradley
- abradley1@bop.gov
- Mar 17, 2025 01:10 pm EDTSources Sought (Original)
Related Document
| Apr 21, 2025 | [Solicitation (Original)] FPC Alderson Unit A Boilers |
| Jun 16, 2025 | [Award Notice (Original)] FPC Alderson Boilers |