Replace Chillers, Campus Wide

Agency: Ohio Facility Construction Commission
State: Ohio
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Aug 12, 2026
Due Date: Aug 20, 2026
Solicitation No: SCC-002701
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/07/21 2026/08/20 SCC-002701 Sinclair Community College Local Higher Education Replace Chillers, Campus Wide A/E $1,100,000 Q&A TBD

Attachment Preview

Request for Qualifications (Registered Design Professional*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name Replace Chillers, Campus Wide
Project Location 444 W. Third Street, Dayton, OH 45402
City / County Dayton / Montgomery
Owner
Sinclair Community College
Delivery Method General Contracting
Publish Date 7/21/2026
Response Deadline 8/20/2026
2:00 PM local time
Project Number
FAC 27-01 | SCC-002701
Project Manager
Paul Blankenship
Contracting Authority Local Higher Education
Prevailing Wages State
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
* “Registered Design Professional includes any architect holding a certificate issued under section 4703.10 of the Revised
Code, any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer
holding a certificate issued under section 4733.14 of the Revised Code.” (Ohio Building Code section 4101:1-2-01 Definitions)
. Submit the requested number of Statements of Qualifications (Form F110-330) to RFP@sinclair.edu The current version of
this form is found at https://ofcc.ohio.gov/. See Section J of this RFQ for additional submittal instructions.
Submit all inquiries regarding this RFQ in writing to Purchasing at RFP@sinclair.edu with the project number included in the
subject line (no phone calls please). Questions are due on Thursday, August 6, 2026 at 2:00 PM. Questions will be
answered and posted to the Opportunities page on the OFCC website at http://ofcc.ohio.gov. The name of the party submitting
a question will not be included on the Q&A document.
Project Overview
A. Project Description
This project consists of the evaluation, design, and phased replacement of aging and end-of-life chilled water equipment at
multiple campus locations. Work may include the replacement of air-cooled and water-cooled chillers, associated pumps,
piping modifications, valves, controls integration, electrical infrastructure upgrades, structural supports, refrigerant piping, and
other related mechanical and electrical components necessary to provide a complete and operational system. The project will
also include commissioning, testing and balancing, and coordination to minimize disruptions to campus operations. The
objective is to improve system reliability, energy efficiency, maintainability, and the long-term performance of the campus
chilled water infrastructure.
B. Scope of Services
For projects advertised with an appropriately developed Program of Requirements (POR), upon award of the
Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by
developing the Program of Requirements.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost
components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity
(EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: Program
Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support,
Conformed Documents, Construction Administration, Post-Construction, Commissioning, and Additional Services of all
types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
F110-02-2026-JAN
Publish Date: 7/21/2026
Page 1 of 4
Request for Qualifications (Registered Design Professional) continued
During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Design of system requirements.
2. Bidding and award services, Bid Express.
3. Project oversite during construction.
4. Construction and closeout support.
C. Estimated Budget / Funding
State Funding:
$
Other Funding:
$1,100,000.00
Construction Cost: $1,100,000.00
Total Project Cost: $1,100,000.00t
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
09 / 26
04 / 27
04 / 28
05 / 28
E. Estimated Basic Fee Range (see note below)
8% to 10%
F. EDGE Participation Goal
Percent of initial Total A/E Fee:
0.0%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all registered design professional services and consultant services necessary for proper completion of the Basic Services,
including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for
the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above,
including the Owner’s contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Engineering
H. Additional Service Providers Required
Secondary
Architecture
Disciplines:
Mechanical-Electrical-Plumbing Eng.
Structural Engineering
Select Secondary Discipline
Select Secondary Discipline
Select Secondary Discipline
Select Secondary Discipline
Select Secondary Discipline
Enter Secondary Discipline
Enter Secondary Discipline
NOTE: The lead A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any landscape
architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued under section
4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
Previous experience compatible with the proposed project (e.g., type, size).
Relevant past work of prospective firm’s proposed consultants.
Past performance of prospective firm and its proposed consultants.
Qualifications and experience of individuals directly involved with the project.
F110-02-2026-JAN
Publish Date: 7/21/2026
Page 2 of 4
Request for Qualifications (Registered Design Professional) continued
Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
Specification writing credentials and experience.
Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
Approach to and success of using partnering and Alternative Dispute Resolution.
Proximity of prospective firms to the project site.
Proposer’s apparent resources and capacity to meet the needs of this project.
The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested A/E firms are required to address how they will implement Building Information Modeling (“BIM”) on the project,
experience and level of training of staff related to BIM, incorporation of team partners that have previous BIM experience,
and an understanding of collaborative BIM processes, including but not limited to the State of Ohio BIM Protocol available
at the OFCC website at https://ofcc.ohio.gov.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm’s name, followed by “SOQ”. Use the “print” feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by “SOQ”.
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2026-JAN
Publish Date: 7/21/2026
Page 3 of 4
Registered Design Professional Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name Replace Chillers, Campus Wide
Project Number FAC 27-01 | SCC-002701
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 50 miles
50 miles to 100 miles
More than 100 miles
Less than $500,000
$500,000 to $1,000,000
More than $1,000,000
Less than 5 professionals
5 to 10 professionals
More than 10 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
b. Proposed EDGE-certified Consultant participation*
Experience / ability of key consultants to
perform effectively and collaboratively
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. LEED** Registered / Certified project experience
c. BIM project experience
d. Team organization
Less than 3 sample projects
3 to 6 sample projects
More than 6 sample projects
Registered LEED v4.0 or v4.1 projects
Certified LEED v4.0 or v4.1 projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 3 projects
3 to 6 projects
More than pp projects
Performance in completing projects within
original construction budget and schedule
Less than 3 projects
3 to 6 projects
More than 6 projects
Value
Score
5
2
0
2
1
0
1
1
1
Max
=3
0 - 10
0-5
0-5
0 - 10
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
0
0
Max
=0
0
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
* Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
** Leadership in Energy & Environmental Design administered by Green Business Certification Inc.
Notes:
Evaluator:
Name
Subtotal
Signature
Date
F110-02-2026-JAN
Publish Date: 7/21/2026
Page 4 of 4
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Date Project Number Owner Project Name City County Pba SOL Docs Bid

Ohio Facility Construction Commission

Due by 9/23/2026

Solicitation ID: SRC0000041195 Solicitation Name: CHJCF_HVAC Systems MRO_8-11-26 Original Begin Date: 8/11/2026 9:41:12

State Government of Ohio

Due by 9/18/2026

456 - Fan File Number: 456 Closing Date: September 15, 2026, 3:00 PM

City of Cleveland

Due by 9/15/2026

Solicitation ID: SRC0000041795 Solicitation Name: ZANESVILLE AIR FILTERS Original Begin Date: 9/10/2026 4:34:24

State Government of Ohio

Due by 9/16/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.