REPAIR RESTROOMS CONTRACTING OFFICE B95
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Local Area Set-Aside (FAR 26.2) |
| Posted Date: | Mar 31, 2025 |
| Due Date: | Apr 2, 2025 |
| Solicitation No: | FA527025R0007 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Updated)
- Updated Published Date: Mar 31, 2025 12:52 pm JST
- Original Published Date: Mar 31, 2025 12:43 pm JST
- Updated Response Date: Apr 02, 2025 02:30 pm JST
- Original Response Date: Apr 02, 2025 02:30 pm JST
- Inactive Policy: 15 days after response date
- Updated Inactive Date: Apr 17, 2025
- Original Inactive Date: Apr 02, 2025
-
Initiative:
- None
- Original Set Aside: Local Area Set-Aside (FAR 26.2)
- Product Service Code: Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
96368JPN
The project scope consists of, but is not limited to, providing all field investigations,
surveys, design, plant, labor, supervision, materials, equipment, supplies, transportation,
third-party services, and other work necessary to design and execute construction work defined in
this Statement of Work and the attached documents. The work includes all necessary finishing work
to provide the Government with a final product that is fully functional and leaves no areas of the
facility that appear incomplete or unfinished.
Provide all labor, materials, and equipment necessary to repair four restrooms in Building 95 to
provide a reliable and efficient plumbing system for 18th Contracting Squadron (18 CONS) Office.
Architectural repairs include replacement of interior finishes including ceiling, wall and flooring, replacement of doors, windows, bathroom vanities, specialties such as partitions, and bathroom and janitorial accessories. Reconfigure the existing interior spaces on the first floor to provide minimum clearances, turning spaces, fixture spacing, and stall dimensions to accommodate personnel in wheelchairs. Mechanical repairs include replacement of bathroom exhaust fans and controls, replacement of plumbing fixtures, water heater, entire domestic water runs from fixtures to mains, domestic water risers, vent piping, and sanitary sewer piping from fixtures to mains. Electrical repairs include replacement of lighting fixtures, lighting controls, receptacles, and miscellaneous power for mechanical equipment. Provide temporary bathroom facility and utility connections required for construction. Suspect hazardous materials (hazmat) such as Asbestos Containing Material (ACM) and Lead-Based Paint (LBP) were tested in the work areas. Project includes abatement on positive building materials that will be disturbed by the repairs of the project.
The scope includes the abatement/removal of any ACM, LBP, or any hazardous materials. For
detailed information, see the Section 7 and 8.
If the Contractor determines that materials other than those already identified as ACM/LBP in the
Government-provided records require additional sampling to safety execute the awarded scope, notify
the Contracting Officer, and submit sampling plans. After approval, conduct sampling and analysis
in accordance with the specifications and submit the Asbestos and/or Lead Sampling and Analysis
Results (ASAR/LSAR) to the Contracting Officer for action.Ensure to submit and get approved AHAP/LHAP for the discovered ACM and LBP prior to beginning the
work.
The contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion.
- (ADMIN ONLY NO REQTN) UNIT 5199
- APO , AP 96368-5199
- USA
- Victor T. Cannon Jr.
- victor.cannon.2@us.af.mil
- Phone Number 3156341837
- Jonathan Garcia
- jonathan.garcia.27@us.af.mil
- Phone Number 3156345019
- Mar 31, 2025 12:52 pm JSTPresolicitation (Updated)
- Mar 31, 2025 12:43 pm JST Presolicitation (Original)
Related Document
| Apr 14, 2025 | [Solicitation (Original)] LXEZ221048 Repair Restrooms Contracting Office B95 |
| May 7, 2025 | [Solicitation (Updated)] LXEZ221048 Repair Restrooms Contracting Office B95 |
| Jun 18, 2025 | [Solicitation (Updated)] LXEZ221048 Repair Restrooms Contracting Office B95 |
See Also
Follow Z1DA--Replace Cast Iron Fittings 676-23-009 Active Contract Opportunity Notice ID 36C25226B0037 Related
VETERANS AFFAIRS, DEPARTMENT OF
Due by 10/14/2026
Follow ZION-EAST ENTRANCE STATION REHAB Active Contract Opportunity Notice ID 140P6026Q0063 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/15/2026
Follow NNSY DD4 DUCT INSULATION REPLACEMENT Active Contract Opportunity Notice ID N4008526R0254 Related
DEPT OF DEFENSE
Due by 9/21/2026
Follow MT-BOWDOIN NWR-HQ OFFICE FLOORS Active Contract Opportunity Notice ID 140FGA26Q0074 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/23/2026