Repair Replace Hangar Roof B11525
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 30, 2026 |
| Due Date: | Apr 7, 2026 |
| Solicitation No: | FXSB-26-6837 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Mar 30, 2026 11:46 am AKDT
- Original Response Date: Apr 07, 2026 01:00 pm AKDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Apr 22, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z1JZ - MAINTENANCE OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
- 238160 - Roofing Contractors
-
Place of Performance:
JBER , AK 99506USA
Building 11525 is a one-story, 113,000 square feet (SF) building framed from steel and cast concrete (beams and columns with CMU infill). The building was originally constructed in the early 1940s and is a historic property. The high barrel roof section that’s approximately 200-ft (curved) by 280-ft, two low roof low sections that are approximately 35-ft by 280-ft each, and one low roof section that approximately 62 ft by 242 ft. This project will remove the existing built-up roof (BUR) from both barrel center section and the east side roof low section, down to the existing decking and replaced with new 3-ply SBS-Modified BUR roof assembly with granular cap sheet on the barrel roof section and the south lower roof low section shall be replaced with a new 90-mil Ethylene Propylene Diene Monomer (EPDM) roof assembly. All roofing assemblies shall be fully adhered. Replace existing roof drains, flashings, vent pipe flashing, cover board (as required), vapor barrier, cant strips, metal copings and trim with new.
Contractor shall provide all labor, materials, equipment, hardware, software and programming necessary to provide fully functional repairs for Tank Farms 3 and 4 in accordance with (IAW) the SOW and as detailed in drawings and specifications
- ADMIN ONLY NO REQTN CP 907 552 5614 10480 SIJAN AVE STE 242
- JBER , AK 99506-2501
- USA
- Robin Cole-Barden
- robin.cole-barden.1@us.af.mil
- Christopher Nelson
- Christopher.nelson.70@us.af.mil
- Mar 30, 2026 11:46 am AKDTSources Sought (Original)
Related Document
| Apr 3, 2026 | [Sources Sought (Updated)] Repair Replace Roof B11525, Roof B10571 and Roof B11551 |
See Also
Follow USCG REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (RMACC III) Active Contract Opportunity Notice
HOMELAND SECURITY, DEPARTMENT OF
Due by 12/31/2026
REQUEST FOR PROPOSALS - RFP 694 - Alaska State Capitol Elevator Modernization The
State Government of Alaska
Due by 9/18/2026
ITB NFAPT00600 Kotzebue Airport Crosswind Runway Improvements Sealed bids for furnishing all labor,
State Government of Alaska
Due by 10/31/2026
Snowden Administration Building Facade INVITATION TO BID Alaska Court System Issuing Office Issue
State Government of Alaska
Due by 10/21/2026