Repair MWD Kennel Interior, Facility 1030 at Joint Base Langley-Eustis (JBLE), VA
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Virginia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 30, 2025 |
| Due Date: | Nov 18, 2025 |
| Solicitation No: | FA480025B0007 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Sep 30, 2025 12:48 pm EDT
- Original Response Date: Nov 18, 2025 02:00 pm EST
- Inactive Policy: Manual
- Original Inactive Date: Dec 31, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Langley AFB , VA 23665USA
Building 1030 currently functions as a United States Air Force Military Working Dog (MWD) Kennel. The building has undergone numerous renovations since its conception. This upcoming renovation will function to bring the kennel up to current standards. This facility is essential to the training and health of each MWD.
There are a few key components to the project that exist. First, a complete gut of existing heating, ventilation, and air conditioning (HVAC) systems. The existing HVAC system does not supply enough air changes as required per the Kennel Design Guide and has led to terrible odor and health concerns. The system will be replaced with a Dedicated Outside Air System (DOAS) that will meet the required air changes. Part of DOAS installation will be the required installation of three-phase power to the building from a nearby switch. Currently, the building exists only on single phase power. Another key component will be a complete rework and improvement of the interior kennel structures to expand individual kennel cells to meet square footage requirements per the Kennel Design Guide.
Please review the attached Statement of Work, Drawings, and Specifications. If you have questions or concerns about the contract documents, please submit to the government for review. These industry questions may not be responded to; however, the government may utilize the questions to refine the requirement and project documents.
- ADMIN ONLY NO REQTN CP 757 764 7707 14 BURRELL ST BLDG 67
- LANGLEY AFB , VA 23665
- USA
- Callie J Compton
- callie.compton@us.af.mil
- Phone Number 7577647228
- Adrian Galvis
- adrian.galvis@us.af.mil
- Phone Number 7572250251
- Sep 30, 2025 12:48 pm EDTPresolicitation (Original)
See Also
B06_2026 BRIDGE REHAB - ZONE COATING Status: Open IFB 126184 Virginia Department of
State Government of Virginia
Due by 9/23/2026
Bid Number: 26-27-014 Bid Title: RFP-26-27-014 Line Survey of Distribution Lines Transmission Lines
City of Danville
Due by 9/24/2026
Painting MET Building Patrick Henry Community Coll... Status: Open QQ 128162 Virginia Community
State Government of Virginia
Due by 9/23/2026
Bid Number: 27039-AG Bid Title: Traffic Signal Construction Services Category: Purchasing Bid Board
City of Suffolk
Due by 10/14/2026