Repair Maintenance Dock B578 & Repair IMC Pavements Area F, Joint Base Charleston SC
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | South Carolina |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Nov 14, 2024 |
| Due Date: | Dec 3, 2024 |
| Solicitation No: | FA441825RXXXX |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Nov 14, 2024 08:00 am EST
- Original Response Date: Dec 03, 2024 04:00 pm EST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Dec 18, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Charleston AFB , SC 29404USA
The 628th Contracting Squadron at Joint Base Charleston, SC is seeking capabilities packages from potential sources for planning purposes to Repair Maintenance Dock B578 and Repair IMC Pavements Area F, at Joint Base Charleston, South Carolina.
This project is to repair a +/- 27,100 SF aircraft maintenance dock building to include replace air handler unit, chilled water supply/return pumps. Replace chiller and packaged terminal A/C units. Replace domestic hot water heater. Replace faulty 400 HZ wiring and converter. Repaint hangar floor, and CMU walls, update bathrooms and fixtures, update office floor and fixtures. Assess and repair, as necessary, the existing fire suppression system to comply with TAB 1 Sundown Policy Foam Fire Suppression System. This project also includes the replacement of existing asphalt and concrete pavements with a new concrete pavement section, new pavement markings, and incidental work. The anticipated performance time is 398 calendar days. The breakdown of this time is 60 days for submittals, 308 days for construction to include weather days and 30 days for closeout documentation.
- ADMIN ONLY NO REQTN CP 843 963 5155 101 E HILL BLVD
- JOINT BASE CHARLESTON , SC 29404-5021
- USA
- SSgt Megan Rowlett
- megan.rowlett@us.af.mil
- Phone Number 8439633707
- Nov 14, 2024 08:00 am ESTSources Sought (Original)
See Also
Project Name: Correction- RFP: Hilton Head PSD - Ribaut Island Water Main Replacement
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 10/09/2026
Bid Number Description Attachments Deadline Award RFB-2026-03-COS Former Seneca Middle School - Exterior
City of Seneca
Due by 9/28/2026
Ad Title: Mauldin Road Clarifier Launder Concrete Preparation and Coating Services Purchasing Agent/Entity:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 9/16/2026
Project Name: Partial Roof Replacement & Exterior Building Repairs at Eagle Nest ES
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 10/05/2026