Repair Intersection Runway 03-21 & 15-33
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | South Carolina |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Feb 12, 2026 |
| Due Date: | Mar 9, 2026 |
| Solicitation No: | FA441826R00XX |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Feb 12, 2026 07:16 am EST
- Original Response Date: Mar 09, 2026 12:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Mar 24, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: Y1BD - CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Charleston AFB , SC 29404USA
The scope of this project includes removal and replacement of 136 individual pavement panels that measure 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runways at Joint Base Charleston-Air Base. Replacement panels will be 25 ft wide x 25 ft long by 26 inches deep. All work will be during a 6–8-hour period between approximately 2300 hrs to 0700, Thursday through Monday. It is anticipated that the process will involve 3 primary activities each night, saw cutting, removal and installation of temporary panels, and placement of permanent panels. Each permanent panel will be constructed from fast setting concrete, capable of achieving aircraft traffic strength during a 3–4-hour cure period. The runway intersection shall open for daily aircraft traffic each morning. The project necessitates specialized capabilities and equipment, such as sawing and removal equipment for 24-inch pavement and volumetric mixers, sufficient in quantity to place a minimum of 50 cubic yards of fast setting concrete. Ancillary work includes milling and overlay of existing asphalt shoulders, installation of new runway centerline and edge lightings within the limits of work, installation of runway markings, pavement grinding for smoothness and pavement grooving.
- ADMIN ONLY NO REQTN CP 843 963 5155 101 E HILL BLVD
- JOINT BASE CHARLESTON , SC 29404-5021
- USA
- Brian T. Hawk
- brian.hawk@us.af.mil
- Phone Number 8439635165
- Robert R. Melton
- robert.melton.6@us.af.mil
- Phone Number 8439635173
- Feb 12, 2026 07:16 am ESTSources Sought (Original)
See Also
Project Name: Ocean Woods Cemetery Phase 3 Agency/Owner: City of Myrtle Beach Ad
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 9/24/2026
RFB 2026-07 - Marina Parking Lot Improvements The City of Isle of Palms
City of Isle of Palms
Due by 9/25/2026
Follow Trade and Cargo Academy Active Contract Opportunity Notice ID W912HP27RA002 Related Notice
DEPT OF DEFENSE
Follow JB Charleston Multiple Award Construction Contract Active Contract Opportunity Notice ID FA441826R0009
DEPT OF DEFENSE
Due by 9/21/2026