Repair Fire Suppression
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Wyoming |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Apr 9, 2025 |
| Due Date: | Apr 25, 2025 |
| Solicitation No: | W50S8W-25-Q-A004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 09, 2025 02:05 pm MDT
- Original Date Offers Due: Apr 25, 2025 10:00 am MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 10, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 4820 - VALVES, NONPOWERED
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Cheyenne , WY 82009USA
Fire Pump Inspection and Isolation
-
Contractor shall perform a visual inspection of the fire pump(s), including but not limited to:
- Pump casing for signs of leaks, cracks, or corrosion
- Pump shaft and bearings for signs of wear or damage
- Suction and discharge valves for proper operation
- Pressure gauges and flow switches for proper function
- Contractor shall isolate the fire pump(s) from the fire suppression system, ensuring the system remains operational through backup or temporary means during the work.
- Contractor shall obtain client approval before proceeding with any work.
Seal and Solenoid Replacement
-
Contractor shall replace the following components on each fire pump:
- All mechanical seals
- All solenoid valves
- Contractor shall use only new, manufacturer-recommended replacement parts.
- Contractor shall clean and inspect all mating surfaces before installing new seals and solenoids.
- Contractor shall follow manufacturer specifications and industry best practices for installation and torquing procedures.
Clean Up and Demobilization
- After replacing the seals and solenoids, the contractor shall reinstate the fire pump(s) into the fire suppression system.
-
Contractor shall perform a comprehensive test of the fire pump(s) and associated systems, including but not limited to:
- Flow tests to verify pump performance
- Pressure tests to verify system integrity
- Alarm and control system functionality
- Contractor shall record and submit all test results to the client for review and approval.
- KO FOR WYANG DO NOT DELETE 217 DELL RANGE BLVD
- CHEYENNE , WY 82009-4799
- USA
- Kristopher W Kahle
- kristopher.kahle@us.af.mil
- Phone Number 3077726884
- Christopher Davalos
- christopher.davalos.1@us.af.mil
- Phone Number 3077726887
- Apr 09, 2025 02:05 pm MDTSolicitation (Original)
- Mar 31, 2025 09:34 am MDT Sources Sought (Original)
Related Document
| Apr 13, 2025 | [Solicitation (Updated)] Repair Fire Suppression |
| Apr 23, 2025 | [Solicitation (Updated)] Repair Fire Suppression |
| Apr 24, 2025 | [Solicitation (Updated)] Repair Fire Suppression |