Rentschler Field Concourse Restroom Finish Upgrades
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 3, 2025 |
| Due Date: | Jul 28, 2025 |
| Solicitation No: | CRDA 25-029 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The project generally includes, but is not limited to, the following: 1. Preparation of existing concrete floors, including scarification, infill, and temporary removal of floor drains, as recommended by manufacturer to receive new floor finish. 2. Preparation of existing CMU walls, as recommended by manufacturer to receive high-performance coatings. 3. Preparation of existing steel doors and frames as recommended by manufacturer to receive high-performance coatings. 4. Removal and replacement of hollow metal doors, frames and hardware as identified as an alternate bid in the Drawings and Specifications. 5. Proper offsite disposal of all removed materials in accordance with applicable regulations.
Erica Levis 100 Columbus Blvd Suite 500 Hartford CT, 06103 United States Tel: 8609248913 Fax: elevis@crdact.net
See Also
Invitation to Bid for Construction Services Old New-Gate: Viets Rehabilitation 106 New Gate
State Government of Connecticut
Due by 10/14/2026
Willow Brook Park Tennis Court Rehabilitation The scope of work generally consists of
State Government of Connecticut
Due by 9/25/2026
Number 8749 Title ADA Compliant Bathrooms at the Mattatuck Historical Society Available Date
City of Waterbury
Due by 9/23/2026
Heroes Tunnel Rehabilitation and Route 15 Interchange 46 Improvements Start Date : August
State Government of Connecticut
Due by 9/24/2026