Remanufacture of B-1B Horizontal Stabilizer Shaker Gearbox and Motor Assembly
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Nov 26, 2024 |
| Due Date: | Dec 31, 2024 |
| Solicitation No: | FA8118-25-R-0007 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Nov 26, 2024 12:44 pm CST
- Original Date Offers Due: Dec 31, 2024 01:00 pm CST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Jan 15, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 1680 - MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS
-
NAICS Code:
- 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
-
Place of Performance:
REMANUFACTURE
A 5-YEAR FIRM FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) TYPE CONTRACT IS CONTEMPLATED.
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Qualification requirements apply. Submit questions on SAR packages and SAR Process to the AFSC Small Business Office Source Development Specialist stacy.cochran@us.af.mil
SAR submittals need to be sent to:
https://www.tinker.af.mil/Home/429SCMS-SASPO/
Source Development Specialist Email: stacy.cochran@us.af.mil
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin dessie.breslin@us.af.mil or Amy Gil amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall be on company letterhead and include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further overhaul on any such items except at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO.
Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.
(h) Condemned units shall not be counted as production.
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.
(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.
(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.
(l) All quantities specified herein represent the total contract quantities for all five years combined. The ordering period for each line item shall extend from the contractual effective data to years thereafter or until the maximum quantity for each line item is reached, whichever comes first. The minimum and maximum quantities for each line item are as follows:
Line Item 0001 NSN: 1680013206815RK Minimum Quantity: 3 each Maximum Quantity: 20 each
(m) This Solicitation contemplates award of a five-year Indefinite Delivery Indefinite Quantity (IDIQ) Type Contract. Reference Clauses 52.216-19 – Delivery-Order Limitations, 52.216-22 – Indefinite Quantity and 252.216-7006 – Ordering.
(n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
- CP 405 739 2048 3001 STAFF DR STE 1AC4 99A
- TINKER AFB , OK 73145-3303
- USA
- Dessie Breslin
- dessie.breslin@us.af.mil
- Amy Gil
- amy.gil@us.af.mil
- Nov 26, 2024 12:44 pm CSTSolicitation (Original)
See Also
Follow 16--PANEL,INDICATOR,AIR Active Contract Opportunity Notice ID SPE4A726T721P Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 9/16/2026
Follow NSN: 1620-006133497, FORWARD DRAIN TUBE, WSDC: 04F, AIRCRAFT, STRATOFORTRESS B-52 Active Contract
DEPT OF DEFENSE
Due by 9/24/2026
Follow 16--MASK,OXYGEN Active Contract Opportunity Notice ID SPE4A726T728A Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 9/17/2026
Follow FD2030-26-02399 Active Contract Opportunity Notice ID FD2030-26-02399 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Due by 7/16/2027