Reissue-DBIA-RFQ-24-01.1 Rehabilitation of Battery “A” Primary Settling Tanks and Pipe Gallery A-2, at the Little Ferry WPCF

Agency: Bergen County
State: New Jersey
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Nov 13, 2024
Due Date: Dec 13, 2024
Solicitation No: DBIA-RFQ-24-01.1
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: Reissue-DBIA-RFQ-24-01.1 Rehabilitation of Battery “A” Primary Settling Tanks and Pipe Gallery A-2, at the Little Ferry WPCF
Ref. #: DBIA-RFQ-24-01.1
Department: BC Utilities Authority
Type: RFSQ
Status:
Open
Open Date: Nov 13th 2024, 11:00 AM EST
Questions Due Date: Nov 26th 2024, 11:00 AM EST
Contact Information: Gerald Reiner, greiner@bcua.org
Close Date: Dec 13th 2024, 2:00 PM EST

Project Description: In 2022, BCUA conducted investigations to determine the condition of the Primary Settling Tanks (PSTs) for all four batteries A, B, C, and D. The investigations, conclusions, and recommendations were published in an engineering report titled “Primary Settling Tank Rehabilitation and Upgrade Facilities Assessment and Planning Report’ dated December 19, 2022 (Exhibit A). The report identifies a number of upgrade projects necessary to improve treatment performance and resolve maintenance issues. The investigations concluded that the Battery A PSTs (PSTs 1 through 4) as well as a portion of Pipe Gallery A-2 (PG A-2) have undergone significant settlement which impacted the performance of the PST Battery. Settlement was attributed to the construction of PG A-2 which increased the loading on the western Battery A wall (PST-4 west wall) without the installation of additional foundation wall support as well as the degradation of the existing timber piles which support the Battery. Previous modifications to the tanks, including the installation of helical piles in the southwestern portion of PST-4 in 2009, were constructed in an attempt to limit the settlement of the tanks and pipe gallery, however, settlement continued to increase. A complete demolition and reconstruction of Battery A was considered, however, removing the entirety of Battery A from service for a significant period of time would greatly reduce the hydraulic capacity of the treatment facility and was not considered feasible. As such, a phased rehabilitation of the existing battery was chosen as the desired solution.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Title: Notice to Bidders: Installation of Pump 'A' Motor & Drive Category:

Township of East Brunswick

Due by 11/26/2026

Bid Number: 23-2026 Bid Title: Roof Replacement at Sports Room Building Category: Goods

Livingston township

Due by 11/18/2026

Bid Number: MTB #26-12 Bid Title: MTB #26-12 RESIDENTIAL COLD WATER METERS Category:

Township of Mahwah

Due by 11/05/2026

THE MEADOWBROOK PLACE & MAPLEWOOD VILLAGE CONDOMINIUMS DRAINAGE IMPROVEMENTS Department: Engineering, Public Works

Maplewood township

Due by 11/05/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.