Agency: | HOMELAND SECURITY, DEPARTMENT OF |
---|---|
State: | North Carolina |
Type of Government: | Federal |
FSC Category: |
|
NAICS Category: |
|
Posted Date: | Dec 16, 2024 |
Due Date: | Feb 28, 2025 |
Solicitation No: | 70Z04725RPCNI0001 |
Original Source: | Please Login to View Page |
Contact information: | Please Login to View Page |
Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0002 for Solicitation 70Z04725RPCNI0001 - RFI due date extended, Proposal due date extended, Site Visit Log attached
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III), POOL 1.
Base Item 0001: The contractor shall provide all the supervision, labor, tools, equipment, materials, transportation, and other services for the design/build to Restore Runway 1-19 (RPUID 24082) to operational conditions as a crosswind, alternate runway for the design mix aircraft at its present dimension of 4,518-feet in length and 150-feet in width; also, to include Taxiway Kilo and Taxiway Golf. The contractor shall also provide and install operational LED edge lighting, guidance signs, lighting system components supporting taxiways for Runway 1-19 and various taxiways. All lighting shall comply with FAA standards (FAA AC 150/5340-30).
Option Item 0001: RW 1-19 North Turnaround: Provide all services and materials necessary for the site demolition and disposal to construct a RW 1-19 North Turnaround Pad. The RW 1-19 turn-around pad shall be compatible for the largest operating aircraft, the H-C 130 Construction shall be in accordance with the requirements of UFC 03-260-01 for Army and Air Force facilities based upon the HC-130 aircraft. Demolition shall include the removal of the existing PCC pavement section to natural subgrade. New construction shall include the demolition of existing pavements and tie-into exiting airfield taxiways and runways. New work shall include all required airfield lights (i.e. edge lights), navigation aids, to include feeders and duct banks, and includes all pavement striping/markings.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Repair BEQ HP505 Active Contract Opportunity N4008525R2549 Related Notice Contract Line Item
DEPT OF DEFENSE
Bid Number: RFP25224 Bid Title: Central Library Cafe' Operations Category: Formal Bids Status:
City of Winston-Salem
Bid Due: 4/04/2025
Solicitation Number: 274-2025-21-2001 Project Title: Tennis Court Repair and Resurfacing Description: The City
State Government of North Carolina
Bid Due: 3/28/2025
Solicitation Number: 109-MCC202505 Project Title: HISTORIC GAITHER HOUSE SECOND FLOOR & EXTERIOR RENOVATIONS
State Government of North Carolina
Bid Due: 4/04/2025