PW - 103128 - VCWRF Bio Solids Facility Bank Stabilization
| Agency: | City of Fort Worth |
|---|---|
| State: | Texas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 13, 2024 |
| Due Date: | Oct 31, 2024 |
| Solicitation No: | 24-0278 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: Proposed improvements are to include realigning 800 LF of the West Fork Trinity River to a stable planform. The stabilization would include realignment of the channel thalweg using a riffle, pool, riffle sequence and providing a stable meander radius of 400’. A bankfull bench would be graded throughout the project. Rock will be placed along the riffles, and a rock toe will be added in the pool along the outside of the meander to protect from lateral migration. Pool grading will also be included. The left and right bank would be laid back to a stable 3:1 or shallower slope. The site will be stabilized by providing an extensive vegetation plan which includes biodegradable erosion control and various sizes and species of native trees, shrubs, live stakes and seeding.
See Also
STATE LET CONSTRUCTION CONTRACT, LUBBOCK CO, REHABILITATE EXISTING ROADWAY Follow Solicitation Solicitation ID:
State Government of Texas
Due by 12/02/2026
STATE LET CONSTRUCTION CONTRACT, ANDREWS CO, SAFETY LIGHTING AT INTERSECTION, ADD LEFT TURN
State Government of Texas
Due by 12/01/2026
STATE LET CONSTRUCTION CONTRACT, DE WITT CO, HAZARD ELIMINATION & SAFETY Follow Solicitation
State Government of Texas
Due by 12/02/2026
STATE LET CONSTRUCTION CONTRACT, GALVESTON CO, INSTALL NOISE BARRIER Follow Solicitation Solicitation ID:
State Government of Texas
Due by 12/02/2026