PW CSP - 105176 - Eagle Mountain Water Treatment Plant Phase IV Expansion

Agency: City of Fort Worth
State: Texas
Type of Government: State & Local
NAICS Category:
  • 221310 - Water Supply and Irrigation Systems
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 23, 2025
Due Date: May 1, 2025
Solicitation No: 25-0086
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: PW CSP - 105176 - Eagle Mountain Water Treatment Plant Phase IV Expansion
Ref. #: 25-0086
Type: CSP
Status:
Open
Open Date: Feb 5th 2025, 2:00 PM CST
Intent to Bid Due Date: May 1st 2025, 2:00 PM CDT
Questions Due Date: Apr 10th 2025, 5:00 PM CDT
Close Date: May 1st 2025, 2:00 PM CDT

Project Description: Construction of a new 35-million gallons per day (MGD) expansion of the existing Eagle Mountain Water Treatment Plant (WTP) on the existing plant site. Facilities and improvements will include:
[1.] Liquid oxygen (LOX) storage and vaporizers [2.] Ozone Generation Building and associated ozone generation equipment [3.] Ozone Contact Basins with side-stream injection and off-gas destruct equipment [4.] Coagulant chemical storage area and feed pumps [5.] Treatment Structure with rapid mix basins, flocculation basins, and plate settler sedimentation basins [6.] Granular media biological filters with an administration space located atop the filter pipe gallery [7.] Filtered water break tank with vertical turbine backwash pumps and membrane feed pumps [8.] Membrane Building with membrane filtration system facilities and plant chemical feed equipment [9.] Chemical storage tank area [10.] Washwater Recovery Basins and Recycle Pump Station [11.] Electrical Building and related electrical systems throughout [12.] Civil site work including grading, dewatering, vaults, excavation and excavation support, paving, and yard piping. This includes sanitary sewer relocation and a new NSIII finished water pipeline. [13.] Instrumentation and controls and physical security measures for an integrated and operation system.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project: PW - 102052-3 - Westside Water Treatment Plant (WTP) WS-3 and WS-4

City of Fort Worth

Due by 10/01/2026

Liquid Oxygen Follow Solicitation Solicitation ID: RFB2026-054 Status: Posted Contact Name: Melanie Wade

State Government of Texas

Due by 9/15/2026

IFB27-6201 Water Treatment Chemicals Bid No. IFB27-6201 Status: Closes: Open 9/23/2026 2:00 PM

Athens city

Due by 9/23/2026

Pest Control & Rat Eradification Services CONTACT: Crockhom, Robbie (214-749-2574) ISSUED: 9/17/04 CONFERENCE:

Dallas Area Rapid Transit

Due by 10/08/2027

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.