Purchase and Installation of Variable Frequency Drive for Selective Catalyst Reduction Tempering Air Fan
| Agency: | City of Pasadena |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 24, 2026 |
| Due Date: | Sep 7, 2026 |
| Solicitation No: | 2026-Informal-0453 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: 2026-Informal-0453
Title: Purchase and Installation of Variable Frequency Drive for Selective Catalyst Reduction Tempering Air Fan
Addenda: 0
Release Date: 8/24/2026
Due Date: 9/7/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The City of Pasadena, Water & Power Department is soliciting bids from qualified vendors to provide and install a variable frequency drive at the City’s Power Plant located at 85 East State Street in the City of Pasadena, California.
Pasadena Water and Power ("PWP"), a department of the City of Pasadena ("City"), is soliciting bids from qualified vendors to deliver and install one Variable Frequency Drive for Selective Catalyst Reduction Tempering Air Fan as part of a General Electric Model LM6000 PG combined cycle gas turbine to the City of Pasadena, CA. This variable frequency drive is a critical component of the selective catalytic reduction system of the gas turbine. The purpose of this procurement is to replace the existing variable frequency drive that has reached the end of its useful life. The City invites interested and qualified suppliers to submit their proposals in accordance with the specifications provided in the scope of services section of this bid specification.
Background
PWP’s Glenarm Power Plant consists of five (5) natural gas-fired combustion turbine units (GTs). GT-1, GT-2, GT-3, and GT-4 are simple cycle units and GT-5 is a combined cycle unit. GT-1 and GT2 are 1970’s-era Curtiss-Wright simple cycle gas turbines each rated at 26 MW. GT-3 and GT-4 are GE LM6000 simple cycle gas turbines with a capacity of 47 MW each. GT-5 is a combined cycle unit with a GE LM6000 gas turbine and Shin Nippon Steam Turbine with a total combined capacity of 71 MW. These units are mainly used to provide power generation during peak periods.
Timeline
See Also
Basic Information Title Invitation for Bids (IFB) Number 26C830006 entitled, CHP Cache Creek
State Government of California
Due by 12/08/2026
Number 1561-00017 Title Farber Educational Campus Buffer Tank Installation Available Date 10/21/2026 10:00
Fresno Unified School District
Due by 11/17/2026
Basic Information Title CHP Inland Division Air Operations Heating, Ventilating and Air Conditioning
State Government of California
Due by 11/10/2026
Posted Title Type Status Documents October 12, 2026 IFB 2027-01 Building Modifications Hydrogen
Victor Valley Transit Authority
Due by 11/19/2026