Purchase and Installation of Gym Dividers for Recreation

Agency: State Government of Louisiana
State: Louisiana
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 339920 - Sporting and Athletic Goods Manufacturing
Posted Date: Apr 17, 2026
Due Date: May 15, 2026
Solicitation No: 50012-650-26
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number Description Date Issued Bid Open Date/Time
50012-650-26
Purchase and Installation of Gym Dividers for Recreation

Original: 50012-650-26
04/17/2026 05/15/2026
2:00:00 PM CT

Contact Information for Bid # 50012-650-26

Department ++ University - Louisiana Tech University
Section Purchasing Department
Dept Code 50012
Contact Melissa Hughes
Address
P.O. Box 3157
408 Keeny Hall
Ruston, LA 71272
Phone 318-257-4205
Fax 318-257-3772
Email mhughes@latech.edu

Attachment Preview

INVITATION TO BID
DO NOT SHIP BASED UPON THIS BID
Bid Number: 50012-650-26
Bid Title:
Return this SIGNED form to:
Louisiana Tech University
Office of Purchasing
PO Box 3157
208 Keeny Circle, RM 408
Ruston, Louisiana 71272
Purchase and Installation of Gym Dividers for Recreation
Bid Schedule:
Pre-Bid Conference:
May 1, 2026 @ 1:00 PM
Bid Submission Deadline / Opening:
May 15, 2026 @ 2:00 PM
Bidder agrees to comply with all
conditions below and attached to this
request.
Prices are to be complete and the
FOB point is to be Louisiana Tech
University unless otherwise specified.
Bidder Information: (Bidder to provide all required information)
(Full Company Name)
(Full Street or Mailing Address)
(City)
(State)
(Zip)
(Phone)
(Email)
(Fax)
(Company Quote Number if Applicable)
PRICES MUST BE FIRM FOR AT LEAST 30 DAYS FROM BID OPENING DATE
FAILURE TO SIGN BELOW IN INK SHALL DISQUALIFY BID
Typed or Printed Name / Title
Authorized Signature
The Louisiana Tech University Office of Purchasing is seeking SEALED BIDS for the following:
Purchase and Installation of Gym Dividers for Recreation
* No bid bond is required for this solicitation *
** The Awarded Vendor shall be required to provide a current Certificate of Insurance compliant with the attached Insurance Requirements
for Contractors document attached to this soliciation **
**See Attached Bid Specifications for additional details**
ALL BIDS MUST BE RETURNED TO THE LOUISIANA TECH UNIVERSITY OFFICE OF PURCHASING VIA MAIL OR IN PERSON.
The Bidder is solely responsible for ensuring that its courier service provider makes inside deliveries to our physical location. Louisiana Tech
University is not responsible for any delays caused by the bidder’s chosen means of delivery.
For questions regarding specifications, please contact the Office of Purchasing at 318-257-4205 or purchasing@latech.edu. Please ensure that
the above bid number appears on all communications.
IMPORTANT: If bidding other than requested brand and product number (or style), enclose sufficient literature to determine compliance with specifications. Failure to comply with this
request may eliminate your bid from consideration. Any manufacturer’s names, trade names, brand names, or catalog numbers used in the specifications are for the purpose of describing
and establishing general quality levels. Such references are not intended to be restrictive. Bids will be considered for any brand which meets or exceeds the quality of the specifications
listed for any items.
PUR2526028 Rev. 06/12/2025
The Louisiana Tech University Office of Purchasing is now accepting Sealed Bid solicitations for the Purchase of Gym
Dividers for Recreation.
The Department of Recreation operates the Lambright Intramural Sports and Wellness Center at 922 Tech Drive Ruston,
LA 71270. The Lambright Intramural Sports and Wellness Center contains a number of amenities that are utilized by
University students, faculty, and visitors. One of these amenities are two (2) gymnasiums that are utilized for basketball,
volleyball, cheer and dance activities, birthday parties, etc. University Staff have the ability to subdivide a single gym using
a mechanized divider / curtain. These dividers / curtains were installed when the building was constructed in 1982. The
two dividers in the Blue Gym are in disrepair, and are in need of replacement.
This solicitation is seeking the purchase of two (2) new dividers / curtains and accompanying motorized hoist equipment,
materials, and supplies, removal of the existing dividers / curtains and accompanying motorized hoist equipment, disposal
of same, installation of newly purchased dividers / curtains, and clean-up of the affected areas. Vendors are to submit per
unit pricing that reflects the above requirements and also meets the below material and installation specifications.
This solicitation is seeking the purchase of a Draper Fold-up Gym Divider or equivalent to replace the Blue Gym Dividers.
The use of a brand name is not intended to be restrictive of any brand / model matching or exceeding the specifications.
If bidding other than the requested brand, vendors shall provide sufficient product documentation or literature to
determine equivalence. Failure to provide this documentation or literature of equivalence shall cause the vendor’s bid to
be deemed as non-responsive.
General Specifications:
- Dividers / curtains shall be fold-up, electrically operated
- Dividers / curtains shall move by ‘accordion fold-up action’ as hoist lines pass through grommets that raise a
bottom steel pipe
- Dividers / curtains shall be rectangular in shape with a straight bottom and extending across the length of the gym
- When fully raised, the stored divider / curtain shall be at least three (3) feet from the bottom of any structural or
supplemental support to the bottom of the divider / curtain.
- Dividers / curtains shall have a minimum clearance between vertical curtain / divider edge and adjacent fixed
objects shall be approximately six (6) inches
- Dividers / curtains shall have approximately three (3) feet of space between the divider / curtain ends and walls
or other fixed objects to allow passage space around the divider.
- Dividers / curtain shall have a drive-pipe powered operating mechanism that utilizes instant reversing, ¾ HP, 110-
120V, 60-cycle, single phase capacitor-style motor with built-in thermal overload protections.
- Winch is to have an oil-filled, precision cast high strength metal allow case that is fully sealed with precision ball
bearings and premium gaskets. Load holding, hardened steel gears and motor to combine to produce at least
1500-inch pounds of torque at 13.5 RPM. Integral limit switches to control upper and lower travel.
- Drive pipe shall rotate in pipe supported assemblies spaced approximately ten (10) feet apart.
- Divider / curtain shall attach to the structural or supplemental support with beam clamps, hanger brackets, and a
minimum of ½-inch diameter threaded rods. Attachment clamps are to be capable of supporting a minimum of
five thousand (5,000) pounds each and sufficient are installed to achieve a combined 45:1 attachment point safety
factor.
- All hoist lines shall be a minimum of 1/8-inch diameter steel cable with a minimum of two thousand (2,000) pound
breaking strength attached to the bottom batten and passing through divider / curtain grommets at eighteen (18)
inches to terminate at the top drive pipe. Space these lines at a maximum of ten (10) feet on center. Hoist lines
shall be secured to a minimum of 1 5/8-inch diameter steel pipe batten in a six (6) inch wide curtain pocket.
- The bottom eight (8) feet of the divider / curtain material shall be opaque, solid vinyl coated polyester fabric. This
fabric shall weight approximately eighteen (18) ounces per square yard and shall be resistant to rot, mildew,
PUR2526028 Rev. 06/12/2025
fungus, and UV light. Material shall be rated as self-extinguishing material. Material shall be Class A rated in
accordance with the requirements of NFPA-101. This material color shall be selected at the time of award and
shall be complementary to the existing color scheme.
- The upper divider / curtain shall be vinyl coated polyester mesh and weigh approximately nine (9) ounces per
square yard and be resistant to rot, mildew, fungus, and UV light. Mesh shall be rated as self-extinguishing
material. Material shall be Class A rated in accordance with the requirements of NFPA-101. This mater color shall
be selected at the time of award and shall be complementary to the existing color scheme.
- Divider / curtain material shall be low VOC emitting and certified to meet all requirements of UL Greenguard and
Greenguard Gold certification program.
- All seams shall be vertical and electronically welded with approximately one (1) inch full contact weld
- All outer hems shall be triple turned with double welds
- Top edge shall be a solid fabric in triple thickness and double welded to mesh to form a six (6) inch wide pocket
for top pipe batten.
- Bottom edge shall be a vinyl pocket designed to house the bottom pipe batten
- Divider / curtain shall have a drive shaft safety device such as a Draper Model 504321 Curtain Lock or equivalent.
This curtain lock shall be sensitive to automatically lock a divider curtain in position at any time where in storage
or during the raising or lowering cycle. In the event of an overspeed situation caused by a malfunction of the
hoisting apparatus, any increase in cycle speed, or tension, whether sudden or gradual, immediately activates the
locking device. The locking mechanism shall react to speed of the drive shaft and prevent it from exceeding a
speed of approximately one (1) feet per second. This divider / curtain lock shall be designed to be a fail-safe, so
that any sticking, jamming, or breakage of any of the components of the arresting mechanism results in an
immediate, positive locking of the drive shaft. This divider / curtain lock shall also incorporate a fully automatic
reset when the equipment is repaired, and load removed, requiring no poles, ropes, levers, or buttons to be used.
Removal / Installation General Specifications:
- Ensure that adequate protection is in place to preserve the existing flooring, walls, and ceilings while removal or
installation functions are being performed.
- Disposal of existing dividers / curtains has been authorized by the State of Louisiana without the need to involve
the Division of Administration. All existing, removed curtains, motors, and accompanying debris can be removed
at the Awarded Vendor’s discretion in the most cost-effective manner possible. *Please note that the Awarded
Vendor shall not utilize any University dumpster(s) to dispose of waste or debris. Vendor may acquire and place
a rollout dumpster onsite with coordination with University Staff.*
- The Awarded Vendor shall coordinate all work with University Staff to minimize facility program interruptions
- The Awarded Vendor shall coordinate all support of the gym divider / curtains with the roof structure to ensure
proper load distribution and adequacy of attachment points with the University’s Buildings Superintendent.
- The Awarded Vendor shall provide additional structural framing members as required and needed.
- The Awarded Vendor shall install dividers / curtains to match the height, slope, and type of building structure and
lighting fixtures, mechanical equipment, ductwork, fire-suppression systems, bleachers, athletic equipment and
any other potential obstructions.
- The Awarded Vendor shall field verify all dimensions prior to fabrication and installation
- The Awarded Vendor shall coordinate all electrical connections and requirements for motorized mechanisms to
the University’s Buildings Superintendent to ensure proper power source, conduit, wiring, and boxes for keyed
switches.
- Prior to installation, the Awarded Vendor shall verify type and location of power supply.
- All installations shall be in accordance with the manufacturers written instructions
- All installations shall be level, even, and plumb
- Control switches shall be installed such that the operator has view of the complete operation during the lowering
and raising of the dividers / curtain
PUR2526028 Rev. 06/12/2025
- Adjustment of the limit switches of the electric winch to ensure accurate position in both the stored and lowered
positions.
- The Awarded Vendor shall demonstrate proper operation of the dividers / curtains to designated University staff
members to ensure proper lifting and lowering. Perform adjustments as needed to ensure smooth operation and
accurate positioning.
- The Awarded Vendor shall provide the University with the required maintenance schedule for all components
- If any portion of this installation requires altering existing electrical connections, the Awarded Vendor shall utilize
a person / entity that holds a Commercial Contractor’s license with an Electrical classification type in good standing
with the Louisiana State Licensing Board for Contractors
Vendors are to provide per unit pricing in accordance with the above listed equipment and installation specifications that
shall include all aspects of this project. These aspects include, but are not limited to the fabrication and installation of the
new dividers / curtains, removal of the existing dividers / curtains and accompanying equipment, installation of new
dividers / curtains and accompanying equipment, disposal of existing dividers / curtains and accompanying equipment,
shipping / handling, freight, travel, accommodations or lodging, per diem, installation materials and supplies, equipment
rentals, etc.
The Awarded Vendor shall ensure that all employees, contractors, or subcontractors carry and display identification that
clearly identifies themselves as such. These employees, contractors, or subcontractors shall remain properly attired at all
times when working in or around University facilities.
The Awarded Vendor shall be required to provide the University with a current Certificate of Insurance complaint with the
attached Insurance Requirements for Contractors document. The Awarded Vendor shall also provide the University with
updated Certificates of Insurance if any coverages lapse or expire during the course of the work associated with this project.
A non-mandatory pre-bid meeting will be conducted on May 1, 2026 @ 1:00 PM at the Lambright Intramural Sports and
Wellness Center 922 Tech Drive Ruston, LA 71270. Vendors are highly encouraged to attend the pre-bid meeting so that
they can take careful note of the conditions under which they would be required to operate. This will be the vendor’s only
opportunity to tour the facility, view the work area, and ask questions of University Staff. The University will not grant the
Awarded Vendor any allowances in performance, quality, and / or workmanship due to the Awarded Vendor’s lack of
knowledge of any existing conditions. Vendors are also responsible for taking their own measurements of any existing
structures or the existing divider / curtains.
Vendors shall complete all pages of this Invitation to Bid, including the printed name and signature of the person
submitting the quotation and pricing on the Schedule of Items page. Bid received without this information shall be
deemed as non-responsive. Vendors are encouraged to include their own quote for an explanation of your proposed
system, BUT this vendor quote shall not be a substitute for this completed Invitation to Bid Form.
PUR2526028 Rev. 06/12/2025
Schedule of Items
page 5
Bid Number: 50012-650-26
Bid Title: Purchase and Installation of Gym Dividers for Recreation
IMPORTANT: If bidding other than requested brand and product number (or style), enclose sufficient literature to determine compliance with specifications. Failure to comply with this request
may eliminate your bid from consideration. Any manufacturer’s names, trade names, brand names, or catalog numbers used in the specifications are for the purpose of describing and
establishing general quality levels. Such references are not intended to be restrictive. Bids will be considered for any brand which meets or exceeds the quality of the specifications listed for
any items.
Vendors shall complete all pages of this Invitation to Bid, including the printed name and signature of the person submitting the quotation and pricing on the Schedule of Items page. Bids
received without this information shall be deemed as non-responsive.
Item Description
1 Purchase & Installation of Gym Dividers for Recreation (as per specifications above)
Quantity
2 ea
Unit Price
Total Price
PUR2526028 Rev. 06/12/2025
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number Description Date Issued Bid Open Date/Time JPP-50-00150075 COUSINS BOULEVARD EXTENSION (WOODMERE

State Government of Louisiana

Bid Due: 6/25/2026

Bid Number Description Date Issued Bid Open Date/Time 3000026264 Norix BN Furniture -

State Government of Louisiana

Bid Due: 6/24/2026

Follow Fitness Bleachers Active Contract Opportunity Notice ID FA460826QC016 Related Notice Department/Ind. Agency

DEPT OF DEFENSE

Bid Due: 6/12/2026

Bid Number Description Date Issued Bid Open Date/Time JPP-50-00150163 Labor, Materials & Equipment

State Government of Louisiana

Bid Due: 7/16/2026