Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Washington |
Type of Government: | Federal |
FSC Category: |
|
NAICS Category: |
|
Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
Posted Date: | Apr 16, 2024 |
Due Date: | Apr 30, 2024 |
Solicitation No: | 1240BD24Q0085 |
Bid Source: | Please Login to View Page |
Contact information: | Please Login to View Page |
Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
REQUEST FOR QUOTATION (RFQ)
Refer to the full RFQ as attached.
SCOPE OF WORK
The goal of this project is to install a new irrigation pump that serves our north pastures at Eightmile Ranch on the Methow Valley Ranger District in Winthrop, Washington. Specific objectives are to have a contractor furnish a new submersible pump, pipe, control panel, materials, supplies and equipment for the replacement, provide all labor to complete the project including installation of pump and electrical control panel, and remove the old submersible pump and any unusable or damaged materials. Do not remove the surface booster pump, as it will be reutilized at an adjacent site. Completed project will function to provide adequate flow to simultaneously operate two wheel lines and buckner riser sprinklers as outlined in the Project Background.
PROJECT BACKGROUND
Eightmile Ranch is located on the Methow Valley Ranger District, on the Okanogan-Wenatchee National Forest near Winthrop, Washington. Eightmile Ranch provides irrigated pastures that support our herd of 22 Forest Service horses and mules. We have 4 irrigated pastures, served by a north and south well. Each well operates two 6” irrigation wheel lines. The north well involved in this project provides water to approximately 25-acres of pasture with one 650ft wheel line, one 600ft wheel line, and 20 buckner riser sprinklers. In 2023, our submersible pump in the north well (Well Tag ID #AKW708) failed, and we were unable to irrigate our two north pastures. The original pump systems were installed around 2001 at Eightmile Ranch. The original pump system consisted of a small submersible pump and a large surface pump that provided enough pressure for the two irrigation wheel lines and a field of buckner riser sprinklers served by the pump. The objective is to install a replacement submersible pump in the well that eliminates the need for the secondary surface pump.
TECHNICAL REQUIREMENTS / PROJECT TASKS
The North well pump is currently out of order. The old submersible pump and piping have been removed and a replacement system is needed to resume irrigation. The well ID tag is #AKW708 and is 93 feet deep. This well provides water to approximately 25-acres of pasture with one 650ft wheel line, one 600ft wheel line, and 20 buckner riser sprinklers. The wheel-line connections to the water main are at locations up to 1500ft from the well and are within 25ft of elevation gain. Completed project will function to provide maximum flow to simultaneously operate two-wheel lines and buckner riser sprinklers.
PROJECT TASKS
Apr 29, 2024 | [Combined Synopsis/Solicitation (Updated)] Pump Replacement, Eightmile Ranch |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Pump Replacement, Eightmile Ranch Active Contract Opportunity Notice ID 1240BD24Q0085 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 5/07/2024
Format for Printing Bid Number: 17-019 Bid Title: NTC - 8th Ave NW
City of Puyallup
Bid Due: 5/15/2024
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Snohomish County
Bid Due: 5/02/2024