Public Safety Pavement Repairs and Site Improvements

Agency: City of Duluth
State: Georgia
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238910 - Site Preparation Contractors
  • 238990 - All Other Specialty Trade Contractors
Posted Date: May 11, 2026
Due Date: May 26, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Description Opening Date/Time Closing Date/Time


Public Safety Pavement Repairs and Site Improvements


Addendum 1



April 21, 2026
:


May 26, 2026
1:45
PM

Attachment Preview

Addendum 1
Invitation to Bid
Pavement Repairs and Site Improvements at Public Safety Building
This Addendum to the Invitation to Bid includes questions received through the end of day on May 7, 2026,
along with corresponding responses and clarifications. A subsequent addendum will be issued following
the question deadline of May 14, 2026.
Please review and acknowledge this addendum with an authorized signature below and include this signed
page with your submitted bid. Failure to do so may result in your bid being declared non-responsive.
__________________________________
COMPANY
__________________________________ _________________________________
SIGNATURE DATE
__________________________________ _________________________________
PRINT NAME TITLE

Question Answer
1 Will you please provide more detail regarding "FDR Medium Duty" and "FDR Heavy Duty". For example a spread rate and or mix design? See sheet C-501 of the design plans.
2 Also, what is your paving spec for "asphalt heavy duty" and "asphalt medium duty"? Is this new full depth paving? If so where is this suppose to be installed? See sheet C-504 of the design plans.
3 Do you have a set of plans to show the proposed phasing and site work? The plans are available for download from the City's website and the Georgia Procurement Registry.
4 Regarding the FDR, can the existing asphalt be removed prior to mixing? Or is the intent to pulverize and mix all the existing material in place? Full-depth reclamation (FDR) shall consist of pulverizing and mixing the existing asphalt in place.
5 Are there any utilities that may be impacted by construction? Yes. The Contractor shall be responsible for locating and coordinating around existing utilities. Note that electrical and irrigation lines run under the concrete sidewalks at the front of the building. The contractor should use extreme caution in these areas, and if any utilities are impacted, stop work immediately and contact the City of Duluth for repairs.
6 Is any type of utility contractor license needed for this project? No.
7 Does this project require General Contracting license? Yes.
8 Any restrictions regarding the working days and hours that we should be aware of? Construction work will be allowed between 7:30 am and 6 pm on weekdays, and between 10 am and 6 pm on weekends/holidays.
9 How will the contractor access the secured areas behind the fence/gates? Access to secured areas will be coordinated through the Police Department. The Contractor shall coordinate scheduling and access requirements in advance.
10 Does the concrete work (including the stairs) at the entrance need to be phased? Yes. The Contractor shall phase the work as necessary to maintain continuous pedestrian access to the front entrance throughout construction. The phasing plan shall be submitted for review and approval by the Project Team by the selected contractor.
11 Will the existing Conex box at the rear corner of the site be moved prior to construction? No. The existing Conex box will remain in place. The Contractor shall preserve and protect it from damage throughout construction and shall be responsible for any damage resulting from construction activities.
12 Does the city have a preferred vendor for the detector loops at the gates? The Contractor shall coordinate with the existing system installer/manufacturer for compatibility and integration requirements. The existing system was installed by ECA Gate and Lock (https://ecagateandlock.com/).
13 In the case of a new firm, will relevant project experience held by the firm's principals or key team members be credited toward the firm's overall experience requirements? For newly established firms, relevant project experience of principals and key team members will be considered; however, the firm will be evaluated as a whole based on the qualifications and experience presented in its submittal.
14 Who is responsible for inspections and materials testing and the associated fees? If the General Contractor is responsible for the testing, please provide all the testing requirements for this project. This question will be addressed in a forthcoming addendum to be issued at a later date.
15 Does this project require any compaction test? The Contractor shall be responsible for all required compaction and associated testing to demonstrate compliance with project specifications. Testing should be completed in accordance with GDOT specfications.
16 How would the owner want to address soft soils conditions, if encountered? This question will be addressed in a forthcoming addendum to be issued at a later date.
17 When is the anticipated start date? The project team anticipates making a recommendation to City Council in early June. Contract execution will follow pending Council approval.
18 Will weather days count against the project? No. Bad weather days will be defined in accordance with GDOT specifications.
19 Does this project have a Force Majeure clause? No.
20 Can the contractor work on the weekends? See the response to question #8. Weekend work will need to be coordinated with the city in advance so that access and supervision can be provided.

Pre-Bid Question Log
Project:Public Safety Pavement Repair and Site Improvements
Date:5/8/2026
Question Answer
Will you please provide more detail regarding "FDR Medium Duty" and
1 See sheet C-501 of the design plans.
"FDR Heavy Duty". For example a spread rate and or mix design?
Also, what is your paving spec for "asphalt heavy duty" and "asphalt
2 medium duty"? Is this new full depth paving? If so where is this suppose to See sheet C-504 of the design plans.
be installed?
The plans are available for download from the City's website and the Georgia
3 Do you have a set of plans to show the proposed phasing and site work?
Procurement Registry.
Regarding the FDR, can the existing asphalt be removed prior to mixing? Or Full-depth reclamation (FDR) shall consist of pulverizing and mixing the existing asphalt in
4
is the intent to pulverize and mix all the existing material in place? place.
Yes. The Contractor shall be responsible for locating and coordinating around existing
utilities. Note that electrical and irrigation lines run under the concrete sidewalks at the
5 Are there any utilities that may be impacted by construction? front of the building. The contractor should use extreme caution in these areas, and if
any utilities are impacted, stop work immediately and contact the City of Duluth for
repairs.
6 Is any type of utility contractor license needed for this project? No.
7 Does this project require General Contracting license? Yes.
Any restrictions regarding the working days and hours that we should be Construction work will be allowed between 7:30 am and 6 pm on weekdays, and
8
aware of? between 10 am and 6 pm on weekends/holidays.
Access to secured areas will be coordinated through the Police Department. The
9 How will the contractor access the secured areas behind the fence/gates?
Contractor shall coordinate scheduling and access requirements in advance.
Yes. The Contractor shall phase the work as necessary to maintain continuous pedestrian
Does the concrete work (including the stairs) at the entrance need to be
10 access to the front entrance throughout construction. The phasing plan shall be
phased?
submitted for review and approval by the Project Team by the selected contractor.
No. The existing Conex box will remain in place. The Contractor shall preserve and
Will the existing Conex box at the rear corner of the site be moved prior to
11 protect it from damage throughout construction and shall be responsible for any damage
construction?
resulting from construction activities.
The Contractor shall coordinate with the existing system installer/manufacturer for
12 Does the city have a preferred vendor for the detector loops at the gates? compatibility and integration requirements. The existing system was installed by ECA
Gate and Lock (https://ecagateandlock.com/).
In the case of a new firm, will relevant project experience held by the firm's For newly established firms, relevant project experience of principals and key team
13 principals or key team members be credited toward the firm's overall members will be considered; however, the firm will be evaluated as a whole based on the
experience requirements? qualifications and experience presented in its submittal.
Who is responsible for inspections and materials testing and the associated
14 fees? If the General Contractor is responsible for the testing, please provide This question will be addressed in a forthcoming addendum to be issued at a later date.
all the testing requirements for this project.
The Contractor shall be responsible for all required compaction and associated testing to
15 Does this project require any compaction test? demonstrate compliance with project specifications. Testing should be completed in
accordance with GDOT specfications.
How would the owner want to address soft soils conditions, if
16 This question will be addressed in a forthcoming addendum to be issued at a later date.
encountered?
The project team anticipates making a recommendation to City Council in early June.
17 When is the anticipated start date?
Contract execution will follow pending Council approval.
18 Will weather days count against the project? No. Bad weather days will be defined in accordance with GDOT specifications.
19 Does this project have a Force Majeure clause? No.
See the response to question #8. Weekend work will need to be coordinated with the city
20 Can the contractor work on the weekends?
in advance so that access and supervision can be provided.

What are the requirements to safe-up the project site? Do you require placement of chain-link fences, signages, and barricades? Site security and safety measures shall be the responsibility of the Contractor. The Contractor shall provide and maintain any necessary fencing, signage, barricades, and other protective measures required to comply with applicable codes and ensure public and worker safety.
22 Are there any requirements for vehicular traffic and/or pedestrian control? Are there any signages required? The Contractor shall be responsible for vehicular and pedestrian traffic control as required for the project. The Contractor shall provide and maintain all necessary signage, barricades, and traffic control measures in accordance with applicable codes, regulations, and safety standards.
23 Are there water and power available on site within proximity of the construction locations? Water and power may be available on site via a standard hose bibb and a typical 120-volt electrical outlet; however, availability is not guaranteed and shall be coordinated with the Police Department. The Contractor shall be responsible for providing any additional utility needs required for the Work.
24 Any designated parking areas for construction personnel? Any designated areas for dumpsters and equipment? A portion of the existing parking lot may be made available for limited staging of dumpters and equipment, subject to coordination with and approval by the City. The Contractor shall be responsible for complying with all requirements and applicable restrictions associated with use of the staging area.
25 Are there any available staging areas for this project close by? What are requirements for staging areas? If any? A portion of the existing parking lot may be made available for limited staging, subject to coordination with and approval by the City. The Contractor shall be responsible for complying with all applicable requirements and restrictions associated with use of the staging area.
26 Is there any existing irrigation system within the construction areas? If there is, how would you want us to address it? Yes. See the response to question 5.
27 Do we have to use the services of a private underground utility locator for this project? Yes. See the response to question 5.

Site security and safety measures shall be the responsibility of the Contractor. The
What are the requirements to safe-up the project site? Do you require Contractor shall provide and maintain any necessary fencing, signage, barricades, and
21
placement of chain-link fences, signages, and barricades? other protective measures required to comply with applicable codes and ensure public
and worker safety.
The Contractor shall be responsible for vehicular and pedestrian traffic control as
Are there any requirements for vehicular traffic and/or pedestrian control? required for the project. The Contractor shall provide and maintain all necessary signage,
22
Are there any signages required? barricades, and traffic control measures in accordance with applicable codes, regulations,
and safety standards.
Water and power may be available on site via a standard hose bibb and a typical 120-volt
Are there water and power available on site within proximity of the electrical outlet; however, availability is not guaranteed and shall be coordinated with the
23
construction locations? Police Department. The Contractor shall be responsible for providing any additional utility
needs required for the Work.
A portion of the existing parking lot may be made available for limited staging of
Any designated parking areas for construction personnel? Any designated dumpters and equipment, subject to coordination with and approval by the City. The
24
areas for dumpsters and equipment? Contractor shall be responsible for complying with all requirements and applicable
restrictions associated with use of the staging area.
A portion of the existing parking lot may be made available for limited staging, subject to
Are there any available staging areas for this project close by? What are coordination with and approval by the City. The Contractor shall be responsible for
25
requirements for staging areas? If any? complying with all applicable requirements and restrictions associated with use of the
staging area.
Is there any existing irrigation system within the construction areas? If
26 Yes. See the response to question 5.
there is, how would you want us to address it?
Do we have to use the services of a private underground utility locator for
27 Yes. See the response to question 5.
this project?

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-76500-NONST-2027-000000024

State Government of Georgia

Bid Due: 8/24/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77077-NONST-2026-000000007

State Government of Georgia

Bid Due: 8/07/2026

Follow Repair Airfield Stormwater Drainage Phase II Active Contract Opportunity Notice ID FA670326R0001

DEPT OF DEFENSE

Bid Due: 8/11/2026

Follow Naval Submarine Base Kings Bay, Maintenance Dredging, Entrance Channel, Camden County, Georgia

DEPT OF DEFENSE

Bid Due: 8/12/2026