Public Notice – Pre-Solicitation Conference Materials Available Online

Agency: Washington County Water Conservancy District
State: Utah
Type of Government: State & Local
NAICS Category:
  • 541611 - Administrative Management and General Management Consulting Services
  • 541613 - Marketing Consulting Services
Posted Date: Aug 5, 2025
Due Date: Dec 31, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Public Notice - Pre-Solicitation Conference Materials Available Online

Pre-Solicitation Conference June 24, 2025 – Materials

The Washington County Water Conservancy District (district) conducted a  pre-solicitation conference for design engineering for the Regional Reuse Purification System (system) conveyance components (project) on Tuesday, June 24, 2025.  Materials from the conference are now available online.

The conference included a presentation on the project and multiple-award procurement process with an opportunity for questions and answers. Project information and scope are below.

Any questions regarding the materials available for download please contact Dinah Neumann at dinah@wcwcd.gov .

Project Information:

The system is a planned infrastructure network comprised of reclamation facilities, advanced water purification technology, conveyance infrastructure, and storage facilities. The district will be issuing a multiple-award procurement to solicit statements of qualifications for the design engineering of the conveyance components of the system.

Project Scope:

  • Approximately 37 miles of 48” welded steel pipeline
  • Three pump stations
  • Two storage facilities
Project Information
Project Type Public Notice - Pre-Solicitation Conference Materials Available Online
Project Manager
Dinah Neumann (Dinah@wcwcd.gov) Send Email
Project Description

Pre-Solicitation Conference June 24, 2025 – Materials

The Washington County Water Conservancy District (district) conducted a  pre-solicitation conference for design engineering for the Regional Reuse Purification System (system) conveyance components (project) on Tuesday, June 24, 2025.  Materials from the conference are now available online.

The conference included a presentation on the project and multiple-award procurement process with an opportunity for questions and answers. Project information and scope are below.

Any questions regarding the materials available for download please contact Dinah Neumann at dinah@wcwcd.gov .

Project Information:

The system is a planned infrastructure network comprised of reclamation facilities, advanced water purification technology, conveyance infrastructure, and storage facilities. The district will be issuing a multiple-award procurement to solicit statements of qualifications for the design engineering of the conveyance components of the system.

Project Scope:

  • Approximately 37 miles of 48” welded steel pipeline
  • Three pump stations
  • Two storage facilities
Consultant(s) Dinah F Neumann
Open June 27, 2025
Close December 31, 2025 12:00 am
Vendor(s) n/a

Attachment Preview

Pre-Solicitation Conference Materials
The Washington County Water Conservancy District (district) conducted a pre-solicitation
conference for design engineering for the Regional Reuse Purification System (system)
conveyance components (project) on Tuesday, June 24, 2025.
Materials from the conference are now available online for this announcement at
https://www.wcwcd.gov/procurement/ .
The conference included a presentation on the project and multiple-award procurement
process with an opportunity for questions and answers. Project information and scope
are below.
Any questions regarding the materials available for download please contact Dinah
Neumann at dinah@wcwcd.gov .
Project Information:
The system is a planned infrastructure network comprised of reclamation facilities,
advanced water purification technology, conveyance infrastructure, and storage facilities.
The district will be issuing a multiple-award procurement to solicit statements of
qualifications for the design engineering of the conveyance components of the system.
Project Scope:
Approximately 37 miles of 48” welded steel pipeline
Three pump stations
Two storage facilities
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project: SLCo PWO130995 Asphalt Concrete Mix - RFC Ref. #: SLCo PWO130995 Asphalt

State Government of Utah

Bid Due: 6/18/2026

Project: BD26-75 Cobble Rock Delivery to Farmington Bay Turpin Dike Line Ref. #:

State Government of Utah

Bid Due: 6/08/2026

Project: CMU Block Walls- 9000 S Ref. #: WJCE26051301 Department: CITIES - City

State Government of Utah

Bid Due: 6/09/2026

Project: DFCM Construction - Prequalified General Stage II - Department of Natural Resources/DWR

State Government of Utah

Bid Due: 7/02/2026