| Agency: | Shawnee County |
|---|---|
| State: | Kansas |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 1, 2026 |
| Due Date: | Jun 15, 2026 |
| Solicitation No: | 020-26 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Request | Department | Description | Due Date |
| Parks and Recreation | Provide professional design services for the development of a new clubhouse facility at Cypress Ridge Golf Course. | 6/15/2026 2:00 PM |
SHAWNEE COUNTY
REQUEST FOR PROPOSAL
(RFP)
Quotation Number: 020-26 Vendor Name: ______________________________
Date Issued: 05-01-2026 Address: ___________________________________
Closing Date: 06-15-2026 2:00pm Phone Number:______________________________
THIS IS NOT AN ORDER
1. In communications, always refer to the above quotation number.
2. All prices and conditions must be shown. Additions or conditions not shown on this bid will not be
allowed.
3. Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal.
4. All prices quoted are to be less Federal Excise Tax and Kansas Sales Tax.
5. Price quoted shall remain firm for ninety (90) days after bid closing date.
*SHAWNEE COUNTY HAS AN ELECTRONIC BID SYSTEM*
All vendors are required to create an online portal account (www.snco.gov/purchasing) in order to receive
or submit bid requests. All responses must be submitted through the bid portal
ITEM AND DESCRIPTION
Shawnee County Parks & Recreation is seeking qualified architectural firms to provide professional
design services for the development of a new clubhouse facility at Cypress Ridge Golf Course.
The selected firm will serve as the lead design consultant, responsible for architectural design and
coordination of all required engineering disciplines necessary to deliver a complete, bid-ready set of
construction documents.
Note: Construction services are not part of this contract. Construction will be publicly bid at a later date.
PRE-BID MEETING
A MANDATORY pre-bid meeting and on-site inspection is being held as part of the RFP process. The
meeting will be held on:
Wednesday, May 27, 2026 at 10:00 am
Cypress Ridge Golf Course
2533 SW Urish Rd., Topeka, KS 66614
Attendance is mandatory at the pre-proposal conference. All questions requesting clarification of
items/issues discussed at the pre-proposal conference must be submitted in writing via the online bid portal.
Page 1 of 10
Proposers should clearly understand that the only official answer or position of Shawnee County will be in
writing. Any modification to this Request arising from the pre-proposal conference, as well as answers to
written questions shall be made in writing by addendum and will be issued through the online bid portal.
SCOPE & INFORMATION
Project Overview
The project includes the design of a new golf clubhouse facility (new build) on the northwest portion of the
property to replace and enhance existing amenities at Cypress Ridge Golf Course.
The clubhouse will serve as the central hub for:
* Golf operations
* Food and beverage service
* Events and tournaments
* Community use
The anticipated size is approximately 6,000-10,000 square feet (to be refined during design).
Required Services
The selected consultant shall provide complete architectural and engineering design services, including:
* Architectural design (lead)
* Civil engineering
* Structural engineering
* Mechanical, Electrical, and Plumbing (MEP)
* Interior design
* Coordination of all disciplines
* Preparation of construction documents suitable for public bidding
* Cost estimating at key milestones
* Assistance during bidding phase (RFIs, addenda, evaluation support)
Design Phases
The project shall be completed in the following phases:
1.Schematic Design (SD)
* Conceptual layouts and site placement
* Initial cost opinion
* Stakeholder input
2.Design Development (DD)
* Refined floor plans and systems
* Material selections
* Updated cost estimate
3.Construction Documents (CD)
* Complete, bid-ready drawings and specifications
* Coordination across all disciplines
4.Bidding Support
* Respond to contractor questions
* Issue addenda
* Assist with bid review
Page 2 of 10
Budget Awareness & Cost Control
The County expects the selected consultant to design the project with a strong emphasis on budget
awareness and cost control throughout all phases of design.
The consultant shall:
* Work collaboratively with County staff to establish a realistic project budget early in the design
process
* Provide opinion of probable construction cost at the conclusion of each design phase (SD, DD,
CD)
* Clearly identify any scope or design elements that may cause the project to exceed the established
budget
* Proactively recommend value-conscious design alternatives when necessary to maintain alignment
with budget expectations
* Design a facility that balances quality, durability, and long-term maintenance considerations with
overall project cost
The intent is to deliver a project that is fully aligned with budget expectations prior to bidding,
minimizing the need for redesign or scope reduction after bids are received.
Site Evaluation Requirements
The consultant shall conduct a full site analysis and feasibility review, including:
1.Topography & Drainage
* Evaluate grading and slope for optimal building placement
* Ensure proper stormwater drainage and runoff management
* Identify floodplain or erosion concerns
2.Utilities & Infrastructure
Assess availability and capacity of water, sewer, electrical service, gas, and data/communications. Identify
required upgrades or extensions.
3.Access & Circulation
* Vehicular access and parking layout
* ADA accessibility compliance
* Golf cart circulation and staging
* Pedestrian flow between parking, clubhouse, and course
4.Environmental Considerations
* Minimize environmental impact
* Preserve natural views and course aesthetics
* Incorporate sustainable and energy-efficient practices
5.Building Orientation
* Maximize views of the golf course
* Optimize natural lighting
* Consider wind exposure and seasonal conditions
6.Clubhouse Design Requirements
The clubhouse should be designed as a modern, high-quality, and flexible facility, approximately 6,000-
10,000 square feet.
Page 3 of 10
7.Building Systems & Materials
* Energy-efficient HVAC systems
* Durable exterior materials with high-quality, low-maintenance finishes
* IT/data infrastructure for operations and events
8.Additional Notes
* All design must comply with ADA standards
* All documents must be suitable for public bidding
* The County reserves the right to negotiate scope and fees
RFP QUESTIONS
All questions regarding this RFP should be submitted through the Shawnee County Online Bid Portal. The
last day to submit questions: 06/09/2026 by 5:00 pm (local time). Questions submitted after this deadline
will not be answered.
RESPONSE REQUIREMENTS
Responses should assume that the county has had no previous knowledge of their products, services or
capabilities. Emphasis should be placed on a clear complete presentation of factual information. They
should include the following:
Proposals shall be organized as follows: