Primary Settling Roof Replacement,Raw Pump&Instrument TechRoof Repairs

Agency: City of Kalamazoo
State: Michigan
Type of Government: State & Local
NAICS Category:
  • 238160 - Roofing Contractors
Posted Date: Aug 1, 2025
Due Date: Aug 28, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Primary Settling Roof Replacement,Raw Pump&Instrument TechRoof Repairs

Closing date

August 28, 2025, 03:30 PM

  • Reference number 91066-043.0
  • Status Open
  • Summary The reroof and repair project is located at 1415 Harrison Street, Kalamazoo, MI 49007. Grew Grewett, Project Manager/Coordinator, is the Owner’s Representative and may be contacted regarding any questions by phone at 269-552-3131 or grewettg@kalamazoocity.org.
    1.1 The project consists of installing Carlisle’s Sure-Seal (black) Adhered Roofing System as outlined below for Primary Settling Roof Sect

91066-043.0-Attachment A (PDF, 12KB)

91066-043.0-bid document (PDF, 4MB)

91066-043.0-Distribution List (PDF, 36KB)

91066-043.0-Plans/Drawings (PDF, 3MB)

91066-043.0-Specifications (PDF, 242KB)

MANDATORY PRE-BID MEETING/SITE INSPECTION – August 14, 2025 @ 10:00 a.m. Location: 1415 Harrison St, Kalamazoo, MI 49007 Conference Room D

SCOPE OF WORK

The reroof and repair project is located at 1415 Harrison Street, Kalamazoo, MI 49007. Grew Grewett, Project Manager/Coordinator, is the Owner’s Representative and may be contacted regarding any questions by phone at 269-552-3131 or grewettg@kalamazoocity.org.

1.1 The project consists of installing Carlisle’s Sure-Seal (black) Adhered Roofing System as outlined below for Primary Settling Roof Section 1:

Remove all of the existing roof down to the deck. Remove all skylights and unused penetrations, and then install adequate decking once they are removed. Install a fully adhered EPDM Roofing System in conjunction with adding (2) layers of 2.6” polyisocyanurate insulation with tapered saddles between drains. Install new edge metal, color to be determined by the city. (See attached Specifications)

1.2 The project will also consist of repairs that will be made to primary settling, raw pump and instrument tech roofs. The specific sections of these roof repairs are listed in the attached plans/drawings and attachment a. (See attached Plans/Drawings & Attachment A)

The bidder shall have all work completed by November 15, 2026.

Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Solicitation: BID 6770 Description: North Campus Fuel Station >> Solicitation >> Specification Solicitation

Kent County

Due by 11/10/2026

Follow Grid Logic Inc. Maintenance Agreement for Additive Manufacturing Machine Active Contract Opportunity

DEPT OF DEFENSE

Due by 11/13/2026

solicitation number name due date documents submission Link BID 2625 Natural Treatment System

Gerald R. Ford International Airport

Due by 11/10/2026

solicitation number name due date documents submission Link BID 2625 Natural Treatment System

Gerald R. Ford International Airport

Due by 11/10/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.