PRIMARY CLARIFIER AND JOCKEY PUMP IMPROVEMENTS
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 20, 2025 |
| Due Date: | Oct 2, 2025 |
| Solicitation No: | PWC 26-10 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The project includes replacing Primary Clarifier No. 2’s mechanism and associated equipment at the Water Pollution Control Facility due to a major mechanism failure. Work includes replacing the main clarifier mechanism including the bridge, center column, scum trough and beach, sludge collector mechanism, connections to existing piping and existing pumps for sludge handling, removal, and replacement of the grout layer on the Clarifier floor, and the replacement of electrical conduit and wiring associated with the electrical equipment for the mechanism. Additionally, as an alternate the project includes installing a jockey pump in the effluent pump station, fittings and restraints, structurally modifying the pump/pipe gallery, providing variable frequency drive (VFD) for the new pump, connecting to the SCADA panel and PLC, associated electrical and controls equipment/wiring.
Karl Klein 45 Fort Hill Rd. Groton CT, 06340 United States Tel: 860-441-6681 Fax: kklein@groton-ct.gov
See Also
ITB No 2026-005ston WPCA River Road Pump Station Upgrades Start Date : September
State Government of Connecticut
Due by 10/15/2026
2027-05 HVAC Upgrades - Wilcoxson School due 09/17/2026 2027-05 HVAC Upgrades - Wilcoxson
Town of Stratford
Due by 9/17/2026
Project ID: Title: Milling & Paving of Still River Drive, Grove Street &
Town of New Milford
Due by 9/17/2026
Bid/Rfp Number Description Due By Bid 27-184T Green's Farms Rd Bridge Replacement Wednesday,
Town of Westport
Due by 9/30/2026