Pre-Solicitation Notice - Trenching, Conduit and Ground-well Installation
| Agency: | STATE, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Oct 9, 2026 |
| Due Date: | Oct 26, 2026 |
| Solicitation No: | PR16330526 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Oct 09, 2026 03:01 pm UTC-05
- Original Response Date: Oct 26, 2026 02:00 pm UTC-05
- Inactive Policy: 15 days after response date
- Original Inactive Date: Nov 10, 2026
-
Initiative:
- Recovery and Reinvestment Act
- Original Set Aside: No Set aside used
- Product Service Code: J038 - MAINT/REPAIR/REBUILD OF EQUIPMENT- CONSTRUCTION/MINING/EXCAVATING/HIGHWAY MAINTENANCE EQUIPMENT
-
NAICS Code:
- 238910 - Site Preparation Contractors
-
Place of Performance:
Saint Andrew , JM-02JAM
Description
The United Stated Embassy in Kingston, Jamaica, plans to issue a Request for Quotations (RFQ) for trenching, conduit and ground-well installation in various locations on the Embassy compound.
Scope of Work: The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job
Infrastructure Support System - Handhole / Underground Conduit System
Trenching
- Nine locations have been identified requiring trench work.
- Thirteen locations have been identified requiring trench work.
- Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment.
- If excavation interferes with existing drains, piping, or structures, the Contractor shall immediately notify, in writing, the COR and provide temporary protection for these systems before proceeding.
Trenching from Handholes
- The Contractor shall make wall penetrations into existing manholes/handholes as required for the number and size of conduits entering and exiting each structure, in accordance with the drawings.
Conduit
- Existing conduit shall remain in place unless the drawings specifically direct removal or modification.
- Under grass, soil, the Contractor shall install Schedule 80 PVC conduit with a minimum cover of 24 inches (610 mm) from finished grade to top of conduit, or as indicated on the drawings, whichever is greater.
- All underground 90 degree bends with a 12inch (305 mm) radius shall use prefabricated sweeping bends.
- Above grade, all underground PVC conduit shall transition to rigid galvanized steel (RGS) using PVC to RGS couplers.
- The Contractor shall install pull lines in all new conduit runs.
Soil and Backfill Materials
Soil Materials
The Contractor shall provide all labor and materials for soil and backfill, where required.
- Select Backfill: ASTM D 2487 soil classification groups SW, SP, and SM, or combinations thereof; free of rock or gravel larger than 3 inches (75 mm), debris, waste, frozen materials, vegetation, and other deleterious matter.
- Asphalt/Concrete Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; with at least 95% passing a 11/2inch (40 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
- Base Gravel: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; 100% passing a 1inch (25 mm) sieve and not more than 8% passing a 1/4inch (6.4 mm) sieve.
- Sand Cushion: ASTM C 33 fine aggregate, natural or manufactured sand.
Placement and Compaction
-
Place backfill and fill in layers not exceeding:
- 8 inches (203 mm) loose thickness for heavy compaction equipment;
- 4 inches (102 mm) loose thickness when compacted by hand-operated tampers.
- Place backfill and fill evenly to the required elevations, uniformly along their full length.
-
Compact soil materials to not less than the following percentages of maximum dry unit weight per ASTM D 1557:
- Under lawns or unpaved areas: scarify and re-compact top 6 inches (152 mm) below subgrade and compact each layer to 85%.
- Utility trenches: compact each layer of initial and final backfill to 85%.
Anticipated Period of Performance: a base period of twenty-one (21) days after contract award
Eligibility and Registration
Offerors must hold an active registration in the System for Award Management (SAM.gov) when they submit a proposal and at award.
Local Insurance and Defense Based Act (DBA) Insurance.
Solicitation Availability
The Embassy will post the solicitation and all amendments only on SAM.gov at https://sam.gov. Interested parties should monitor SAM.gov for the release and any amendments. The Embassy will not issue paper copies.
Disclaimer
This notice is for informational purposes only and is not a request for proposals. It does not commit the Government to issue a solicitation or award a contract. The Government will not pay for any information or materials submitted in response to this notice.
Interested Parties are required to send their interest to Kingstonquotes@state.gov on or before October 26, 2026 at 2pm local time.
- DEPARTMENT OF STATE, 2201 C ST NW
- WASHINGTON , DC 20520
- USA
- U.S. Embassy Kingston Procurement Office
- Kingston.quotes@state.gov
- Phone Number 8767026000
- Handel Blake
- BlakeHA@state.gov
- Phone Number 8767026393
- Oct 09, 2026 03:01 pm UTC-05Presolicitation (Original)
See Also
Follow TF33 Repair 2nd-4th Stage Turbine Nozzle Vanes Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 12/02/2026
Follow J066--Biosystems (Leica) | Follow On/Base +4OY's | Start Date: 2/1/27 | Columbus
VETERANS AFFAIRS, DEPARTMENT OF
Due by 11/09/2026
Follow USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request
DEPT OF DEFENSE
Due by 11/23/2026
Follow Elevator Inspection & Preventative Maintenance Active Contract Opportunity Notice ID 140A2327Q0301 Related
INTERIOR, DEPARTMENT OF THE
Due by 11/12/2026