| Agency: | SECO Energy |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 29, 2025 |
| Due Date: | Jun 6, 2025 |
| Solicitation No: | 2025-41 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Agency | SECO Energy |
| Status | Active |
| Fiscal Year | 2025 |
| Primary Contact | Karen Bennett |
| Secondary Contact | Substation Engineering Bid |
| Tertiary Contact | Purchasing and Contracting SECO Energy |
| Title | Pre-Qualification for Substation Contractors |
| Number | 2025-41 |
| Type | Request for Qualifications |
| Online Quote/Bid | Yes |
| Department | Purchasing |
| Piggyback Solicitation | No |
| Insurance Required | No |
| Bid Bond Required | No |
| Bid Bond Amount | |
| Performance Bond Required | No |
| Performance Bond Amount | |
| Scope of Services |
SECO Energy is seeking qualified contractors to bid on substation construction projects. See attached bidder qualification specifications.
Introduction: Sumter Electric Cooperative, also known as SECO Energy, is a not-for-profit, member-owned electric utility. With over 250K active accounts (90/10 residential/commercial split), SECO Energy is the third largest electric cooperative in Florida and the seventh largest in the entire United States. The service territory area is approximately 2,000 square miles. SECO maintains a sophisticated electrical network with a maximum operating voltage of 25 KV. This system includes 48 substations comprised of over 198 feeders. SECO Energy is a very customer-focused utility which has high expectations for all its various contracted services. Additional information on SECO Energy can be found on its website at www.secoenergy.com. ***NOTE*** All questions and proposals must be submitted on VendorLink. PLEASE NO PHONE CALLS OR EMAILS. The following requirements must be met, in order to submit your bid on VendorLink: Must upload your proposal, choosing `Proposal` as your file type |
| Broadcast Date | 5/7/2025 7:00 PM |
| Question End Date | 6/4/2025 5:00 PM |
| Due Date | 6/6/2025 2:00 PM |
| Anticipated Award Date |
| Date | Time | Mandatory | Location |
| Type | Name | Description | File Type | |
| Request for Qualifications | Substation Construction Qualification.docx | Substation Construction Qualifications | Word | |
| All Solicitation Types | SECO - PO Terms and Conditions for RUS Goods Acquisition - revApril2022.pdf | RUS T&Cs for Purchase Order |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Delivery Date | None |
|
Include Shipping in
Price of Items |
No |
| Shipping | None |
| Terms and Conditions | See SECO Energy`s Terms and Conditions |
| Files to Request | None |
| Display Bid Tabulation to Vendors | |
| Display Vendor Submissions to Vendors | |
| View Vendor Submissions while Bid Solicitation is Active |
| Code | Description |
| [280-58] | High Voltage Cables and Wires (601-15,000V), Solid and Stranded, Single and Multiconductor |
| [725-42] | Poles, Metal, Transmission, High Voltage (EFFECTIVE 3-1-07 THIS CLASS-ITEM INACTIVATED FOR NEW USE, REFER TO 839-60) |
| [839-60] | Poles, High Voltage Transmission |
| [936-77] | Substation/High Voltage (Electrical) Maintenance and Repair |
| [936-87] | Transformer (High Voltage) Maintenance and Repair |
| [936-77] | Substation/High Voltage (Electrical) Maintenance and Repair |
| [936-87] | Transformer (High Voltage) Maintenance and Repair |
| [450-62] | Pads, Equipment Foundation, All Types (Including Recycled Type) |
| [913-48] | Construction, Special Foundation |
| [912-21] | Construction, Energy Related (All Types) |
| [914-38] | Electrical |
| [914-84] | Trade Services, Construction (Not Otherwise Classified) |
| [914-79] | Structural and Reinforcement Steel |
| [914-85] | Welding |
| [909-76] | Site Work (Incl. Site Clean-Up) |
| [912-16] | Boring, Drilling, Testing, and Soundings |
| [912-23] | Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.) |
| [912-30] | Construction, Power Plant |
| [912-40] | Demolition Services |
| [912-44] | Excavation Services |
| [285-87] | Transformers, Power, Electric Sub-Station |
| Publication | Date |
| Question | Date Asked | Answer | Date Answered |
| Is this bid applicable to tubular steel pole manufacturers? For example, for tall steel structures like H-Frames and static masts? | 5/8/2025 12:23:17 PM | No, we are not asking for any corrosion control. This proposal is seeking qualified substation construction contractors to bid on our projects. See requirements under Documents. | 5/9/2025 12:42:52 PM |
| Does the scope of services you require for Pre-Qualification for Substation Contractors, include Corrosion Control? | 5/8/2025 1:05:22 PM | 2. No, this is not a material bid, but a construction bid. This proposal is seeking qualified substation construction contractors to bid on our projects. See requirements under Documents. | 5/9/2025 12:43:50 PM |
| What is the average expected length per job for these rates? | 5/16/2025 1:58:03 PM | The requested labor and equipment rates will be used solely for evaluation purposes as part of this prequalification. While a service agreement is not anticipated at this time, the submitted rates may be referenced should such an agreement be considered in | 5/29/2025 2:00:15 PM |
| Will the contractor be responsible for the testing and commissioning scope on substation projects, or will SECO handle with support from the contractor? | 5/22/2025 10:45:16 AM | Contractor is not responsible for testing and commissioning of any equipment or relays. Contractor is responsible for pulling and terminating interconnects per drawings and conduit/cable schedule | 5/22/2025 2:36:53 PM |
| Do SECO`s substation projects typically include fiber splicing and testing? If so, would this scope be the contractor`s responsibility? | 5/22/2025 10:46:30 AM | Contractor is not responsible for splicing or testing fiber. SECO will splice and test all fiber. Contractor may be required to pull fiber based on the conduit and cable schedules. | 5/22/2025 2:36:30 PM |
| The pre-qualification form is requesting labor rates for emergency and non-emergency storm rates, as well as equipment rates. Would you please clarify how requested rates will be utilized? Are the rates intended for a service agreement, and if so, what would be the duration of the agreement? Thank you. | 5/28/2025 3:49:07 PM | This solicitation is part of SECO’s Substation Contractor Qualification process, intended to identify and approve Substation Construction Contractors eligible to participate in future closed-bid construction opportunities. The requested labor and equipment rates will be used solely for evaluation purposes as part of this prequalification. While a service agreement is not anticipated at this time, the submitted rates may be referenced should such an agreement be considered in the future | 5/29/2025 1:59:31 PM |
| Would SECO consider extending the bid event by a couple days? | 5/29/2025 3:01:38 PM | Yes. Extended until June 6, 2025 | 5/29/2025 4:40:18 PM |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description: LGL COUNSEL PERS INJ. PROTECT. (PIP) INS. CLAIMS- FR ETS Department: Procurement
Palm Beach County
Bid Due: 10/22/2030
Project ID: 11-26 Title: Fleet Maintenance Facility Repairs, Electrical, Plumbing. Addenda: 0 Release
Walton County
Bid Due: 6/03/2026
Description: INSTALLATION AND REMOVAL OF HURRICANE FABRIC AT PBIA Department: Purchasing Buyer: Antonio
Palm Beach County
Bid Due: 5/03/2030
Description: FENCE, CHAIN LINK, REPAIR, FURNISH AND INSTALL SERVICES Department: Purchasing Buyer: Bridget
Palm Beach County
Bid Due: 4/22/2029