Powerhouse Drainage Sump Oil Skimmer and Day Tank Replacement - Oil Remover and Transfer System (ORTS)
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Washington |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Feb 3, 2025 |
| Due Date: | Feb 14, 2025 |
| Solicitation No: | W68MD943476352 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Feb 03, 2025 02:17 pm EST
- Original Response Date: Feb 14, 2025 08:00 am EST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Mar 01, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 4330 - CENTRIFUGALS, SEPARATORS, AND PRESSURE AND VACUUM FILTERS
-
NAICS Code:
-
Place of Performance:
Bridgeport , WA 98813USA
The vendor shall provide a complete oil skimmer system which meets the specifications listed below. All components shall be new, and the skimmer system shall be shipped to the US Army Corps of Engineers at Chief Joseph Dam in Bridgeport, WA 98813. The oil skimmer system shall consist of a tube type oil skimmer, decanter, and a 100-gallon day tank for collecting the oil and water from the decanter.
Specifications:
Vertical tube type skimmer with integrated decanter and collection tank.
The collection tank shall be stainless steel.
Collection tank shall have a capacity between 65 (minimum) and 100 (maximum) gallons.
The skimmer must automatically transfer recovered oil to collection tank.
The collection tank must have a float switch which automatically shuts off the oil skimmer when full.
The The skimmer must have both an audible annunciation and indicator lamps in the event the skimmer shuts down or loses power.
The collection tank must have both an indicator lamp and audible alarm when full.
The collection tank must have liquid level indicator lamps to signal when the unit is 3/4 full and when full.
The collection tank must have a manually activated electris pump for transferring oil and water to "used oil" drums once the collection tank is full.
The skimmer must automatically return the water separated from the oil to the sump.
The skimmer must use a free-floating closed loop oil collector tune to recover oil from the water surface.
The oil collector tube must operate without requiring any mounts or guides installed in sump.
The skimmer system must be capable of recovering 65-100 gallons/hour.
The skimmer with integrated decanter and collection tank shall be mounted on a skid (as an all-in-one oil skimmer system).
The skid shall have holes for mounting to a concrete floor or base (stationary installation).
All components of the skimmer system must be designed to operate continously (24/7).
The skimmer and collector tube must recover oil from a sump with fluctuating water levels (the normal operating level for the sump is 15 to 35 feet from the finished floor).
The collector tube must extend 35 feer from the finished floor into a drainage sump.
The required overall length for the collector tube is estimated at 78 feet based on the old skimmer (will need to work with vendor to determine optium length based on final installation).
The collector tube must be resistant to tangling up on itself while floating on water surface.
The collector tube must operate within the existing sump opening (30 inches center to center).
The entire skid mounted skimmer system must fit within the existing skimmer system footprint of 30 inches x 74 inches.
The power requirement is 120 VAC single phase.
The skimmer system shall have a NEMA control box to house components for power, timers, lights, level switches, etc.
All local alarms and indicator lamps much allow duplication to a remote annunciation panel.
- KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH
- SEATTLE , WA 98134-2329
- USA
- Della S. Overton
- della.s.overton@usace.army.mil
- Phone Number (206) 764-6170
- Feb 03, 2025 02:17 pm ESTSources Sought (Original)
See Also
Follow CGC POLAR STAR PUMP PARTS Active Contract Opportunity Notice ID POLARSTAR_PUMPPARTS_14501PR260000174 Related
HOMELAND SECURITY, DEPARTMENT OF
Due by 10/01/2026
Follow CGC POLAR STAR PUMP PARTS Active Contract Opportunity Notice ID POLARSTAR_PUMPPARTS_14501PR260000174 Related
HOMELAND SECURITY, DEPARTMENT OF
Due by 10/10/2026
Bid Title: Shadow Mountain Water System Project (Water Main and Booster Pump Station)
County of Cowlitz
Due by 9/28/2026
Bid Title: KNITTLE BOOSTER PUMP STATION Category: Public Works Projects Status: Open Description:
City of Stanwood
Due by 9/29/2026