Pottsville Street Stormwater Improvements
| Agency: | The Enterprise Center |
|---|---|
| State: | Pennsylvania |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 29, 2025 |
| Due Date: | Oct 30, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project: Pottsville Street Stormwater Improvements
Location: Herndon Borough, Northumberland County, PA
Funding: Community Development Block Grant (CDBG)
Solicited By: Tonia Troup, Project Coordinator, SEDA-COG
?? 201 Furnace Road, Lewisburg, PA 17837
?? (570) 524-4491 | ??
ttroup@seda-cog.org
Publication Date: September 27, 2025
Deadline: October 30, 2025 at 11:00 AM (local time)
-
Provide 3 copies of the quotation
-
Seal and clearly mark envelope: “Engineering Services Quotation – Pottsville Street”
-
Deliver to:
Tonia Troup, Project Coordinator
SEDA-COG
201 Furnace Road
Lewisburg, PA 17837 -
Quotations must be received by deadline; faxed or emailed submissions cannot be accepted
-
Public opening at SEDA-COG Board Room
Herndon Borough will use CDBG funds to mitigate stormwater issues and restore Pottsville Street, which is in poor condition due to erosion, worn pavement, and failing drainage.
Scope of Improvements:
-
Install 2 new box inlets connected by 18" plastic corrugated pipe
-
Install 4" rolled curbs on both sides to channel stormwater away from sidewalks and basements
-
Mill and repave roadway with new base and wearing course, sloped for proper drainage
-
Extend useful life of roadway by at least 7 years
The selected Engineer will provide design, permitting, specifications, bidding assistance, construction administration, and project close-out. Federal Wage Rates apply.
Project Design Requirements-
Complete design drawings/specifications per professional standards
-
Investigate existing systems and provide modification recommendations
-
Plans must allow deletion or addition of segments if costs vary
-
Include anticipated permits with fees (paid by Engineer)
-
Surveys and environmental/historic/archaeological reviews are excluded
-
Attend required meetings:
-
Kick-off + 2 development sessions
-
Final design/approval to advertise
-
Pre-bid (optional)
-
Bid opening (Engineer prepares bid tabulation)
-
Award recommendation
-
Preconstruction conference
-
4 preconstruction-related sessions
-
-
Provide project design schedule with milestones
-
Provide preliminary and final opinions of probable construction costs
Engineer will:
-
Prepare all bid documents, bond forms, compliance forms, and agreements
-
Distribute up to 10 bid packages
-
Publish advertisements (ad costs reimbursed by Borough)
-
Manage contract award process: notices, agreements, start, substantial completion, final inspection, close-out
-
Minimum 2 site visits + final inspection
-
Monitor progress and quality; disapprove non-conforming work
-
Review/approve contractor submittals and payment requests
-
Serve as Borough’s site representative
-
Provide “As Built” drawings (1 print + 1 electronic copy)
-
Professional Services Agreement with Borough
-
Lump sum fee (includes all reimbursables)
-
Monthly billing based on percentage complete
-
Payments contingent on DCED reimbursement
-
MBE: 5%
-
WBE: 3%
-
Section 3 (24 CFR Part 75): Applies to federal projects > $200,000
-
25% of labor hours = Section 3 workers
-
5% of labor hours = Targeted Section 3 workers
-
Section 3 does not apply to professional services, but firms are encouraged to support compliance
-
Quotations will be scored based on:
-
Responsiveness to RFQ
-
Relevant experience and past performance
-
Quality of previous work
-
Resources and record of timely delivery
-
Cost
-
Commitment to MBE/WBE participation
-
Completed Standard Engineering Estimate Form
-
At least 2 references (similar projects, within last 3 years)
-
MBE/WBE certification (if applicable)
-
Solicitation and Commitment Statement
-
Proof of Professional Liability Insurance coverage
Herndon Borough reserves the right to reject any or all quotations, waive irregularities, or negotiate terms.
| Attachment | Size |
| RFQ ENGINEERING SERVICES. BID 2.pdf | 338.05 KB |
See Also
Facility: David L. Lawrence Convention Center Project: Exterior Loading Dock Roll Door Replacement
Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)
Due by 9/22/2026
ABK Daycare (Envision Center) Emergency Egress Project IFB#600-22-26 OPEN The Housing Authority of
Housing Authority of the City of Pittsburgh
Due by 9/30/2026
Follow JP Martha Float Mooring Bitts Retrofit Active Contract Opportunity Notice ID W911WN26CA015
DEPT OF DEFENSE
Homewood North Community Center HVAC Replacement, AMP-20 IFB#600-28-26 OPEN The Housing Authority of
Housing Authority of the City of Pittsburgh
Due by 10/07/2026