POST - REPLACE FIRE CONTROL PANEL AND TRANSFER SWITCH
| Agency: | General Contractors Association |
|---|---|
| State: | Hawaii |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jan 14, 2026 |
| Due Date: | Jan 30, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: Provide all labor necessary to replace the fire pump controller and transfer switch
as indicated in the plans and specifications. The proposed work shall generally
include removal, disposal and replacement of the pump’s controller and transfer
switch. Replace the fire pump control panel per manufacturer’s specifications. Start-
up the pump per manufacturer’s recommendations and perform system checks to confirm
proper operations. Submit all data collected to the university of Hawaii facilities
management office, attention: Carl Oshiro prior to request for final inspection. All
work located in the Information Post, UHM.
Provide all tools, materials, equipment and insurance necessary to replace the fire
pump controller and transfer switch as indicated in the plans and specifications. The
proposed work shall generally include removal, disposal and replacement of the pump’s
controller and transfer switch. Replace the fire pump control panel per
manufacturer’s specifications. Start-up the pump per manufacturer’s recommendations
and perform system checks to confirm proper operations. Submit all data collected to
the university of Hawaii facilities management office, attention: Carl Oshiro prior
to request for final inspection. All work located in the Information Post, UHM.
Special Instructions
ALL bidders are requested to attend a mandatory site walk-through. A site walk through is
scheduled for 8:00 a.m. on Friday January 16, 2026. Contractors shall meet at the
Physical Plant Mechanical Engineer Office located at 2002 East- West Road. Contract
documents will be distributed at the mandatory walk through. Contractors interested in
bidding this work must contact Carl Oshiro through email ( coshiro6@hawaii.edu), facsimile
(956-5979) or phone (956-0479) to confirm attendance by 4:00 p.m. Thursday January 15,
2026. Contractors who DO NOT attend a mandatory site walk-through will not be allowed to
bid on this work. Contractor is required to provide a cost breakdown at time of bid. The
breakdown must equal to the total cost of the bid. If correct breakdown is not provided at
time of bid, the bid may be disqualified.
No attachments have been added to this solicitation.
| Download |
See Also
Day Date Time Area ADD/ / AMD GCA# Project 09/22/26 10:00am Oahu 36722-350
General Contractors Association
Due by 9/22/2026
Day Date Time Area ADD/ / AMD GCA# Project 09/17/26 2:00pm Oahu 36752-376
General Contractors Association
Due by 9/17/2026
Follow HPACs AERP, Remove, Re-install, & Operational Testing Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 9/28/2026
Follow Dockside (DS): USCGC MIDGETT FY27 Repair Active Contract Opportunity Notice ID 70Z08526QLREP0024
HOMELAND SECURITY, DEPARTMENT OF
Due by 9/22/2026