| Agency: | Sarasota County |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 19, 2024 |
| Due Date: | Jan 15, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Project ID:
Title: Post Construction Beach Tilling for 2023 South Siesta Key Beach Repair Project
Addenda: 0
Release Date: 12/19/2024
Due Date: 1/15/2025
Sarasota County is requesting quotes from bidders to provide an all-inclusive quote that shall include labor, materials, equipment, setup, hauling, and supervision for all costs necessary to till approximately 6,000 +/- linear feet of beach on Siesta Key.
Bidders
1. Bidders are requested to provide an all-inclusive quote that shall include labor, materials, equipment, setup, hauling, and supervision for all costs necessary to till approximately 6,000+/- linear feet of beach between Florida Department of Environmental Protection (FDEP) Monument R-71, to Monument R-77 in accordance with the requirements specified in FDEP Joint Coastal Permit Modification No. 0240984-008-JN attached hereto and incorporated herein, and as depicted in the attached aerial photographs and surveys. Tilling shall be performed to a minimum depth of 24 inches, and as outlined in Specific Condition 19.b. of the modified permit.
Bidders are advised that the project area experienced a loss (erosion) of sand due to impacts from the 2024 hurricanes. The sand loss may preclude tilling access from approximately 750 feet south of R-74 to R-77. The attached aerial photos depict the beach conditions on October 19, 2024, after Hurricane Milton. Access to the site will be via Sarasota County's Turtle Beach Park, 8918 Midnight Pass Road, Sarasota, FL 34242.
Required
2. In the event no responsive and responsible quotes are received under the quote threshold, the County may elect to cancel this Quick Quote and re-solicit using another procurement method. Award will be made to the responsive and responsible Bidder providing the lowest total bid price.
References
3. Bidder must provide three references that demonstrate experience in this field. All references must be submitted using the form in OpenGov.
Insurances
4. The Successful Bidder will be required to provide proof of insurance that meets the requirements contained in the attached Requirements for Certificate of Insurance.
Special Requirements
5. Work must be completed before February 15, 2025.
Award will be made to the responsive and responsible bidder providing the lowest total bid price.
DO NOT submit a quote of more than $50,000. In the event no responsive and responsible quotes are received under the quote threshold, the County may elect to cancel this Quick Quote and re-solicit using another procurement method.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description: Convention Center - Cooling Tower Water Line Replacement (RE Department: Facilities Development
Palm Beach County
Bid Due: 6/22/2031
Description: Summit Library Administration Renovations Department: Procurement Buyer: Jeromy Calderon Solicitation Number: RPQ-680-F25-0090/JC-1-1
Palm Beach County
Bid Due: 8/14/2030
Follow Z1DA--FY26: NRM (PROJ: 548-23-112) BB Upgrade Exterior Signage and Wayfinding Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/03/2026
Follow Cape Canaveral National Cemetery Ornamental Grass Renovation and Irrigation National Shrine Project
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/23/2026