Port Area Infrastructure and Complete Streets Project

Agency: City of West Sacramento
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 541330 - Engineering Services
  • 541519 - Other Computer Related Services
Posted Date: Oct 3, 2024
Due Date: Oct 31, 2024
Solicitation No: 24-050-RFP
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID: 24-050-RFP

Title: Port Area Infrastructure and Complete Streets Project

Addenda: 0

Release Date: 10/3/2024

Due Date: 10/31/2024

Post Information
Posted At:Thu, Oct 3, 2024 3:39 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

STATEMENT OF PURPOSE

The City of West Sacramento is soliciting proposals from qualified firms ("Proposer") to provide Professional Services for Engineering Design for the Port Area Infrastructure and Complete Streets Project. More details on the City's needs for this work are provided in the Scope of Work .

Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor."

SYNONYMOUS TERMS

Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous:

a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror

b. Purchase Order, Contract, Agreement

c. Services, Work, Scope, and Project

d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet

Background

The Port Area Infrastructure Project originally began as a project intended to address the poor pavement conditions along Southport Parkway. Since then, this Project has expanded to include not only road rehabilitation, but also other complete streets elements, including filling sidewalk gaps, adding bike lanes, upgrading utilities to enhance safety and to meet the needs of pedestrians, bicyclists, motorists, and public transportation uses along Harbor Blvd from the US 50 On/Off ramp to Industrial Blvd; Industrial Blvd from Harbor Blvd to the Palamidessi Bridge; Lake Washington Blvd from the Palamidessi Bridge to Southport Parkway; and Southport Parkway from Lake Washington Blvd to Promenade Street.

The high percentage of truck traffic in the Project area has significantly impacted the pavement conditions. The City recently completed the Neighborhood Pavement Preservation program which focused on preserving and maintaining local roadways. Southport Parkway between Lake Washington Blvd and Ramco Street was included as part of this Project. The dig out work completed was intended to temporarily address the most damaged areas of Southport Parkway, and although it has helped the pavement conditions, it is evident that this was a temporary solution and a more permanent solution is required.

In 2022, the City entered into a design contract and completed preliminary design, utility studies, traffic studies, and geotechnical studies. The following documents were completed and will be available in the "Attachment" section of this RFP.

  1. 35% Schematic Design
  2. 35% Construction Estimate
  3. Storm Drainage, Sewer and Water System Evaluation and Analysis
  4. Geotechnical Pavement Evaluation
  5. LCCA Memo with Attachments
  6. Phase 1 ESA
  7. Traffic Analysis Report
  8. UPRR Exhibit

Although the total project construction cost is currently estimated at $37 million it is anticipated that construction will be completed in separate phases.

Timeline
Project Release Date:
October 3, 2024
Pre-Proposal Meeting (Non-Mandatory):
October 10, 2024, 2:00pm
Microsoft Teams Need help?
https://teams.microsoft.com/l/meetup-join/19%3ameeting_OTE2NjU1OGUtMmZkMS00YTNjLWFlOWQtZGFiYjdlZjU3NjAy%40thread.v2/0?context=%7b%22Tid%22%3a%22284d74b9-2287-48dd-86fa-55c87b82bc40%22%2c%22Oid%22%3a%22b6374918-6b3a-4d2b-93fb-65151bde0f9c%22%7d

Meeting ID: 235 121 534 68
Passcode: gBZm9o
________________________________________
Dial in by phone
+1 619-485-0116,,827756678# United States, All locations
Find a local number
Phone conference ID: 827 756 678#
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
Question Submission Deadline:
October 17, 2024, 5:00pm
Question Response Deadline:
October 24, 2024, 5:00pm
Proposal Submission Deadline:
October 31, 2024, 2:00pm
Prospective Interview Date:
November 11, 2024
City Council Contract Approval :
January 15, 2025
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Title: HCTP Cleanout and Clarifier Beach Repairs Project (MI 2646) Addenda:

City of Thousand Oaks

Bid Due: 6/24/2026

S33WLCBG - La Cienega Boulevard Green Street Project Status Stage Open Posted 5/27/2026

City of Los Angeles

Bid Due: 7/01/2026

Follow REPAIR FUEL FACILITIES AND REPLACE OWS, AT NAVAL BASE CORONADO (NBC), SAN

Federal Agency

Bid Due: 7/14/2026

Follow USFS - Route 1 Road Repair - V2. Active Contract Opportunity Notice

Federal Agency

Bid Due: 7/17/2026