POINTE POOL PLASTER

Agency: City of Ballwin
State: Missouri
Type of Government: State & Local
Posted Date: Nov 20, 2025
Due Date: Dec 18, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • POINTE POOL PLASTER
    The City of Ballwin seeks bids from qualified contractors to perform all prep work and to plaster the surface of an indoor swimming pool at The Pointe at Ballwin Commons, 1 Ballwin Commons Circle, Ballwin, MO 63021.
    Sealed bids addressed to the City of Ballwin, Parks and Recreation Dept. #1 Ballwin Commons Circle, Ballwin, MO 63021 will be accepted by the City of Ballwin until 2:00 P.M. (prevailing local time) on the 19th day of December, 2025 at which time all bids received will be opened and read aloud. Copies of the Bid Documents may be obtained by contacting Chris Conway Director of Parks and Recreation at 636-227-8950, or cconway@ballwin.mo.us or by clicking here . Bid Documents include this Notice to Contractors, Instructions to Bidders, General Conditions, the Plans and Specifications, Bid Proposal form, Bid Bond form, proposed City-Contractor Agreement, Bidders Information Sheet form, Exhibits, and any Addenda issued prior to closing of the scheduled time for accepting bids.
    Bids should be clearly marked “BID OPENING: 26-02: Pool Plaster, Attention Chris Conway.” Bids shall be submitted on the Bid Proposal form provided. All work shall be performed according to City of Ballwin specifications.
    The successful bidder shall comply with applicable State provisions concerning the payment of prevailing wages on public works projects. Accordingly, all workers performing work under the City-Contractor Agreement shall be paid not less than the prevailing hourly rate of wages as determined by the Department of Labor and Industrial Relations of the State of Missouri. A copy of the applicable Annual Wage Order and Incremental Increases for each occupational title required under this project is included in the Bid Documents as Exhibit A.

  • Attachment Preview

    City of Ballwin RFP 26-02
    CITY OF BALLWIN, MISSOURI
    NOTICE TO CONTRACTORS
    The City of Ballwin seeks bids from qualified contractors to perform all prep work and to plaster
    the surface of an indoor swimming pool at The Pointe at Ballwin Commons, 1 Ballwin
    Commons Circle, Ballwin, MO 63021.
    Sealed bids addressed to the City of Ballwin, Parks and Recreation Dept. #1 Ballwin Commons
    Circle, Ballwin, MO 63021 will be accepted by the City of Ballwin until 2:00 P.M. (prevailing
    local time) on the 19th day of December, 2025 at which time all bids received will be opened
    and read aloud. Copies of the Bid Documents may be obtained by contacting Chris Conway
    Director of Parks and Recreation at 636-227-8950, or cconway@ballwin.mo.us. Bid Documents
    include this Notice to Contractors, Instructions to Bidders, General Conditions, the Plans and
    Specifications, Bid Proposal form, Bid Bond form, proposed City-Contractor Agreement,
    Bidders Information Sheet form, Exhibits, and any Addenda issued prior to closing of the
    scheduled time for accepting bids.
    Bids should be clearly marked “BID OPENING: 26-02: Pool Plaster, Attention Chris
    Conway.” Bids shall be submitted on the Bid Proposal form provided. All work shall be
    performed according to City of Ballwin specifications.
    The successful bidder shall comply with applicable State provisions concerning the payment of
    prevailing wages on public works projects. Accordingly, all workers performing work under the
    City-Contractor Agreement shall be paid not less than the prevailing hourly rate of wages as
    determined by the Department of Labor and Industrial Relations of the State of Missouri. A
    copy of the applicable Annual Wage Order and Incremental Increases for each occupational title
    required under this project is included in the Bid Documents as Exhibit A.
    Enrollment in Federal Work Authorization Program
    Bidders are informed that pursuant to Section 285.530, RSMo, as a condition of the award of any
    contract in excess of five thousand dollars ($5,000.00), the successful bidder shall, by sworn
    affidavit and provision of documentation, affirm its enrollment and participation in a federal
    work authorization program with respect to the employees working in connection to the
    contracted services. Successful bidders shall also sign an affidavit affirming that it does not
    knowingly employ any person who is an unauthorized alien in connection to the contracted
    services.
    Safety Training
    Bidders are informed that the Project is subject to the requirements of Section 292.675, RSMo,
    which requires all contractors or subcontractors doing work on the Project to provide, and
    require its on-site employees to complete, a seven (7) hour course in construction safety and
    health approved by the Occupational Safety and Health Administration (“OSHA”) or a similar
    program approved by the Missouri Department of Labor and Industrial Relations which is at
    least as stringent as an approved OSHA program. The training must be completed within sixty
    (60) days of the date work on the Project commences. On-site employees found on the worksite
    without documentation of the required training shall have twenty (20) days to produce such
    documentation. Contractors and sub-contractors in violation of this provision will forfeit to the City of
    Ballwin $2,500.00 plus $100.00 a day for each employee who is employed without training. The City of
    1
    City of Ballwin RFP 26-02
    Ballwin may withhold assessed penalties from payment due to the bidder and/or any subcontractors
    employed thereby. The bidder shall complete and submit their bid on the “AFFIDAVIT OF WORK
    AUTHORIZATION”.
    A The Notice to Proceed is expected on January 13, 2026. Physical work on site will be
    scheduled to begin in the summer of 2026 and shall continue uninterrupted as outlined in the
    Specifications.
    Bid security in the amount of five (5%) percent of the Base Bid offered by the bidder as
    indicated on the Bid Proposal form shall accompany the bid submittal. Bid security shall be in
    the form of a bank draft or certified check drawn upon a responsible, solvent bank and payable to
    the City of Ballwin, Missouri or a satisfactory Bid Bond executed by the bidder and by a good
    and sufficient surety authorized to do business in Missouri.
    The successful bidder shall be required to furnish within seven (7) days of notification of
    contract award a satisfactory Payment, Performance and Guarantee Bond in the full amount of
    the Bid based on the bid quantities listed on the Bid Proposal form. The Payment, Performance
    and Guarantee Bond furnished shall meet all requirements of section 107.170 of the Revised
    Statutes of Missouri, as amended, and shall guarantee the faithful performance of the work
    including payment of prevailing wage requirements of the State of Missouri. No bid submitted
    shall be withdrawn after the opening of bids for a period of ninety (90) calendar days after the
    closing of the scheduled time for accepting bids.
    The City of Ballwin will affirmatively assure that in any contract entered into pursuant to this
    Notice to Contractors, qualified minority business enterprises will be afforded full opportunity to
    submit bids and will not be discriminated against on the grounds of race, color, religion, sex, age,
    disability, familial status, national origin or political affiliation. If you are a person that requires
    an accommodation or desires more information, please call (636) 227-8580 or RELAY
    MISSOURI 1-800-735-2966 TDD not later than 5:00 P.M. on the third day preceding the last
    day for accepting bids. Offices are open between 8:00 A.M. and 5:00 P.M. Monday through
    Friday.
    The City of Ballwin intends to award a contract for the Project based on the bid that, in the City
    of Ballwin’s sole discretion, best meets the interests and requirements of the City. The City of
    Ballwin reserves the right in the City’s sole discretion to reject any and all bids, to waive
    technicalities or deficiencies in any or all bids, to negotiate with any or all bidders or others for
    more favorable terms or prices, and to award a contract to other than the bidder submitting the
    lowest cost bid proposal, with or without negotiation. The City of Ballwin reserves the right not
    to open a sole bid.
    2
    City of Ballwin RFP 26-02
    CITY OF BALLWIN, MISSOURI
    INSTRUCTIONS TO BIDDERS
    1.​ General
    A.​ All work shall be constructed and completed in accordance with the specifications for the
    same, relating to the construction of such improvements.
    B. ​ The Bid Documents are on file at the City of Ballwin, Parks and Recreation Department
    #1 Ballwin Commons Circle, Ballwin, MO 63021.
    C. ​ There will be no pre-bid meeting. Any questions should be directed to Chris Conway
    Director of Parks and Recreation @ 636-227-8950.
    D. ​ Bid due date is December 19, 2025, at 2:00 P.M. (prevailing local time).
    2.​​ Scope
    Proposed construction for the Project will consist generally of: All work required to
    prepare surface for new plaster and to re-plaster surface of indoor swimming pool. See
    Specifications attached hereto. If Alternates are proposed, the Alternates must be itemized
    separately from the Base Bid.
    3.​ ​ Material Purchases
    The Contractor shall be responsible for paying all material suppliers. The Contractor shall pay
    all taxes required by law. For Sales Tax: see Special Sales Tax Provisions, paragraph 21.
    4.​ ​ Land and Rights-of-Way
    For the purposes of operating and maintaining the Project, the City of Ballwin shall acquire the
    necessary lands, easements and rights-of-way privileges required for same. The Contractor shall
    furnish and construct any necessary access roads or facilities.
    5.​ ​ Obtaining Bid Documents
    Bid Documents include the Notice to Contractors, the Instructions to Bidders, the General
    Conditions, the Plans and Specifications, the Bid Proposal form, the Bid Bond, the proposed
    City-Contractor Agreement, the Bidders Information Sheet form, Exhibits, and any Addenda
    issued prior to receipt of bid proposals and all modifications. Copies of the Bid Documents may
    be obtained at City of Ballwin, #1 Ballwin Commons Circle, Ballwin, MO 63021 or The Pointe
    at Ballwin Commons, 1 Ballwin Commons Circle, Ballwin, MO 63021 at no cost. The City of
    Ballwin shall maintain a list of all persons and organizations who have obtained copies of the
    Bid Documents.
    3
    City of Ballwin RFP 26-02
    6.​​ Bid Proposals
    A.​ Sealed bid proposals will be received in accordance with the Notice to Contractors.
    B.​ Bids shall be submitted on the accompanying Bid Proposal form. Bids shall be sealed in
    an envelope bearing only the printed endorsement "BID OPENING 26-02: Pool Plaster,
    ATTENTION: Chris Conway". In the case of proposals to be sent by mail, the envelope shall
    be placed in an outer or mailing envelope, and endorsed as noted above.
    C.​ Bid security in the amount of five (5%) percent of the Base Bid [exclusive of numbered
    Alternates] as indicated on the Bid Proposal form shall accompany the bid submittal. Bid
    security shall be in the form of a bank draft or certified check and drawn upon a responsible,
    solvent bank and payable to the City of Ballwin, Missouri or a satisfactory Bid Bond executed by
    the bidder and by a good and sufficient surety authorized to do business in Missouri. The bid
    security shall be refunded or returned to the bidder upon the faithful performance of the
    conditions of the Bid Proposal to the satisfaction of the City of Ballwin.
    D.​ The successful bidder shall be required within seven (7) days of receipt of written
    notification of award from the City of Ballwin to execute the City-Contractor Agreement and to
    furnish a satisfactory Payment, Performance and Guarantee Bond with a good and sufficient
    surety authorized to do business in the State of Missouri in the full amount of the bid submitted
    based on the bid quantity listed on the Bid Proposal form. The Payment, Performance and
    Guarantee Bond furnished shall meet all requirements of section 107.170 and 290.250 of the
    Revised Statutes of Missouri, as amended, and shall guarantee the faithful performance of the
    Work including payment of prevailing wage requirements of the State of Missouri. In case of
    failure or neglect to execute the City-Contractor Agreement or to furnish a satisfactory Payment,
    Performance and Guarantee Bond within the time above specified, such bidder will be
    considered as having abandoned the bid, and the bid security provided shall thereupon be
    forfeited to the City of Ballwin and collected as provided by law, and thereupon the Project shall
    be re-advertised or otherwise let to another bidder.
    E.​ Prior to final acceptance of the Project, the Contractor shall be required to provide in cash
    or by certified check payable to the City of Ballwin maintenance security in the amount of ten
    percent (10%) of the final construction cost of the Project. The maintenance security shall be
    held by the City of Ballwin in full force for one (1) year following final acceptance of the Project
    and the Contractor agrees and consents to the use of the maintenance security by the City of
    Ballwin to make any necessary repairs to any portion of the Work.
    F.​ No bid shall be considered unless the offering bidder shall furnish evidence satisfactory
    to the City of Ballwin that the bidder has the necessary facilities, ability and pecuniary resources
    to fulfill the conditions of the Contract Documents. The low bidder or any other bidder may be
    required to submit financial statements.
    G.​ All bids shall be made for materials in the different classes furnished in the Work
    complete, and no bid proposal will be made or considered on any part of the Work not complete
    in place, nor on materials except in completed work, unless specifically otherwise provided for in
    the Plans and Specifications.
    4
    City of Ballwin RFP 26-02
    H.​ Attention of the bidders is directed to the requirement that work on the project shall be
    commenced on June 1, 2026 and be completed no later than July 1, 2026. The pool shall be
    ready to be filled by 8:00 A.M. on July 2, 2026.
    The Contractor is required to coordinate all work around concurrent onsite projects, including the
    installation of an aquatic play structure and painting. Breaks in work should be anticipated as
    other improvements are completed
    I.​ No bid shall be withdrawn after the opening of bids for a period of ninety (90) calendar
    days after the closing time for acceptance of bids. Any bidder may withdraw a bid personally or
    by telegraphic or written request at any time prior to the closing time for the acceptance of bids.
    J.​ The successful bidder shall be required to comply with all applicable State provisions
    concerning the payment of prevailing wages on public works projects. The successful bidder
    shall submit attached Form PW-1000 to the Missouri Department of Labor and Industrial
    Relations, Division of Labor Standards upon award of the contract. All workers performing work
    under the City-Contractor Agreement shall be paid not less than the prevailing hourly rate of
    wages as determined by the Department of Labor and Industrial Relations of the State of
    Missouri. A copy of the applicable Annual Wage Order and Incremental Increases for each
    occupational title required under this project is included in the Bid Documents and shall be
    included in the Contract Documents.
    K.​ The Contractor and each subcontractor engaged on the Project shall keep posted in a
    prominent and easily accessible place at the Project site a clearly legible statement of all
    prevailing hourly wage rates to be paid to all workers employed on the construction of the
    Project. The statement shall remain continuously posted during the full time that any worker
    shall be employed on the Project.
    L.​ The Contractor and each subcontractor shall submit to the City of Ballwin monthly
    during the construction of the Project certified copies of payroll records for all workers employed
    on the Project. The Contractor shall forfeit, as a penalty, to the City of Ballwin the sum of
    $2,500, plus One Hundred Dollars ($100.00) for each worker employed by the Contractor or by
    any subcontractor for each working day or portion thereof that such worker is paid less than the
    prevailing hourly rate of wages as determined by the Department of Labor and Industrial
    Relations of the State of Missouri for work performed under the City Contractor Agreement.
    M.​ The bidder shall perform with his own organization, work amounting too not less than 50
    percent of the total contract cost.
    7.​ ​ Itemized Bids
    Each bid shall be itemized in component parts as set out on the Bid Proposal form to be
    submitted on or before the date and time for receiving bids. Each bid shall specify unit prices for
    all items and shall make extensions based upon the quantities listed. The sum of the products of
    the quantities listed in the Bid Proposal form as submitted, multiplied by the unit price bid, shall
    constitute the gross sum bid.
    5
    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    REQUEST FOR PROPOSAL (RFP) STATE 0000000410SL: Bulk Liquid Oxygen - MDC Close Date

    State Government of Missouri

    Bid Due: 6/18/2026

    Bid Title: SODIUM CHLORIDE Category: Public Works Status: Open Description: REQUEST FOR BIDS

    Bridgeton city

    Bid Due: 6/25/2026