Plumbing Replacement in Jail

Agency: Montcalm County
State: Michigan
Type of Government: State & Local
NAICS Category:
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Feb 14, 2026
Due Date: Mar 12, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Plumbing Replacement in Jail

Attachment Preview

Request for Proposal
For Replacement of Plumbing Fixtures in East End of Jail
2/12/2026
County of Montcalm
Brenda A. Taeter
County Controller/Administrator
County Controller’s Office
211 W. Main Street
P O Box 368
Stanton, MI 48888
Request for Proposal
For Replacement of Plumbing Fixtures in East End of Jail
Page |2
The following proposal and specifications are to ensure which materials, labor, and
services are included to complete the project.
Location of Project
County of Montcalm Public Safety Complex: 659 N. State Street, Stanton, MI 48888
Detailed Specifications to Include
Liability insurance of $1,000,000 minimum required
All equipment is to meet DOC specifications
Plumbing for all toilets and sinks to include cells 1-8 and the gymnasium as follows:
o Replace toilets with MDOC approved toilets for jail cells complying with ACA
standards. Generally require durable, vandal-resistant fixtures, stainless steel, to ensure
sanitation and security. Similar to: Acorn R2115-W-2 Siphon Jet floor Mounted
Toilet w/Back Spud, Stainless Steel Finish
o Replace sinks with MDOC approved sinks for jail cells primarily featuring heavy-gauge,
stainless steel, ligature resistant, and ADA compliant fixtures designed for high security
environments. Leading manufacturer Acorn Engineering provides common models,
including the Secur-Care (LR1677, LR1652, LR1653) and front access options 1650FA-
LOB, 1652FA)
Plumbing for shower heads in cells 1, 2, 7, 8 and gymnasium as follows:
o Replace shower heads with MDOC approved shower heads for jails emphasize tamper-
resistant, anti-ligature, and high durability designs, often featuring stainless steel
construction and low-flow, vandal resistant nozzles. Key brands include KryptoMax (G2
Automated Technologies), High Sierra, Acorn, and Willoughby
o Replace old valves with new valves as required
Work to be performed Monday through Friday, 8:00am-6:00pm
All contractor employees assigned to this project must provide ID in order to have background
checks done prior to the start of the job
Total Project Cost: $ _________________
County of Montcalm
2/12/2026
Request for Proposal
For Replacement of Plumbing Fixtures in East End of Jail
Submission Details
Page |3
Submission Deadlines
All bids must be submitted on paper and mailed or delivered to our office, address stated below, no later
than:
12:45pm on Thursday, March 12, 2026
Public Opening of bids at 12:50pm on March 12th.
Please indicate on the outside of the envelope “Replace Plumbing in Jail RFP”.
Submission Delivery Address
The delivery address for all submissions is:
Brenda A. Taeter
County Controller’s Office
County of Montcalm
211 W Main Street
P O Box 368
Stanton, MI 48888
Submission Questions and Clarifications
You may contact the following persons, if you have any questions or require clarification on any topics
covered in this Request for Proposal, no later than 3:00pm on March 2, 2026:
Doug Gietzen
Director of Buildings & Grounds
County of Montcalm
Cell: 989-818-2047
Email: dgietzen@montcalm.us
Brenda A. Taeter
County Controller/Administrator
County of Montcalm
Voice: 989-831-7398
Email: btaeter@montcalm.us
There will be a mandatory walk-thru of the project area within the Jail on Monday, February 23rd
at 10:00am. Please meet Doug in the Jail lobby at 9:50am. If you have any questions concerning
the walk-thru, please contact Doug at 989-818-2047 at your earliest convenience.
County of Montcalm
2/12/2026
Request for Proposal
For Replacement of Plumbing Fixtures in East End of Jail
Terms of Payment
Page |4
Payment for the project will be made upon completion of the project, unless specified otherwise
in contract.
Any additional work requiring additional cost must be submitted to the Director of Buildings &
Grounds and approved in writing (or by signature) before work is performed; additional
approved work will become part of the original contract and paid accordingly.
We appreciate your interest in this project.
County of Montcalm
2/12/2026
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow VGLZ 242016 B164 HVAC REPAIR Active Contract Opportunity Notice ID W50S8526BA005 Related

DEPT OF DEFENSE

RFQQ 184412,1: BN: RESIDENTIAL CONSTRUCTION CONTRACTOR REQUEST FOR QUALIFICATIONS Close Date 2/28/29 3:00

City of Detroit

Bid Due: 2/28/2029

Replacement of Roof of the Administration Building Request for Proposal For Replacement of

Montcalm County

Bid Due: 8/17/2026

Description: MCIC RTU Replacement Project Department: Genesee Intermediate School District Buyer: Megan Sturk

State of Michigan

Bid Due: 8/04/2026