Plants Dam Bid RFIs (pdf)

Agency: Town of East Lyme
State: Connecticut
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 6, 2026
Due Date: Apr 10, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Plants Dam Bid RFIs (pdf)

Plants Dam Rehabilitation/Reconstruction Requests for Information Responses

Attachment Preview

Plants Dam Rehabilitation/Reconstruction Requests for Information Responses
4/6/2026
Notes from pre-bid meeting (on 3/31/2026):
1. The approximate project clearing limits are marked and posted by the Town’s tree warden.
2. Trees must be felled by May 15, 2026, then stumps and felled trees must be removed by the
contractor off-site removal is the responsibility of the contractor.
3. The soil export from necessary grading can be brought to the Town transfer station (91
Roxbury Road, Niantic) to be deposited without fee.
4. The construction site entrance shall be in the same location and approximate grade as the
future proposed driveway (option 3) to the east of the existing kiosk, there is a need to cut
back the berm along the road to establish this entrance. The kiosk should be protected or
removed and replaced after construction is completed.
Questions Received:
1. Q: Is a bid bond required?
A: No.
2. Q: Are we allowed to remove the guardrail to gain access to the dam and are we allowed to
use jersey barriers in the guardrail removed areas?
A: Yes to removing the rail, but needs to be approved by CTDOT. It may require removal
and replacement of guardrail on a daily basis, we do not have a response yet from
CTDOT.
3. Q: It was mentioned to repair the chain-link fence on the headwall. Are we replacing the
chain-link fence and posts or do we have to use the existing chain-link fence in the repair?
A: New chain link fence (in kind) to be replaced the entire run. New fence to be
installed between the guiderail and the headwall, old fence removed.
4. Q: Are we allowed to set our equipment on the dam spillway area?
A: On sheets 3 and 3A we show how to access the spillway apron.
5. Q: The detail dimensions are not for a PZC- 13 either PZC 13 ‘s are 55” w and 12” deep.
(shown 44” & 9”) [what is the acceptable product?]
A: Provide PCZ 13 for the project, ignore detail dimensions.
6. Q: Can 8-9” straw wattles be used in lieu of siltsoxx and typically the flap for the silt fence is
buried and then the wattle is placed against the fence.
A: Yes this is an acceptable alternate, provided it is spike as shown on the detail.
7. Q: No specification is provided for steel sheets. Drawing C-3A states PCZ 13, grade 60 or
equal. Please confirm sheets are to be supplied mill finish and no sealant is required in
interlocks.
A: Supplied mill finish with no sealant is acceptable.
8. Q: Please provide borings or other information that demonstrates drivability of sheets.
A: Provided on the webpage.
9. Q: Can concrete dam re-facing be formed and poured in lieu of shotcreted?
A: Yes, either one is acceptable.
10. Q: Drawing C-4 shows clearing for construction entrance and staging area. The limit of
clearing does not include equipment access between the staging area and the east side of
the dam/spillway. Please confirm contractor will be allowed to clear this area as needed to
provide equipment and material access for dam and spillway work.
A: Confirmed, yes additional clearing at the eastern portion of the dam is allowed.
11. Q: For the tree clearing, are we limited to what is shown on the plan or can additional trees
be removed depending on equipment used for the dam work?
A: Confirmed, yes additional clearing at the eastern portion of the dam is allowed.
12. Q: For tree clearing on the Base Bid, shall this include all the trees within the limits of the
parking area and associated grading as well?
A: Yes.
13. Q: For the debris removal, this is limited to tree debris and leaves? There will be no
excavating/dredging of soil?
A: There is no excavation or dredging of soil.
14. Q: The concrete apron between the dam and culverts is suitable for equipment loads and
use, with wood mats being placed over concrete?
A: Yes
15. Q: Can a temporary access be established to access the right side of the dam for proposed
work?
A: Yes, but needs to be approved by CTDOT. It may require removal and replacement of
guardrail on a daily basis, we do not have a response yet from CTDOT.
16. Q: If police details are required, with those be provide by the Town or does the contractor
need to include in the bid?
A: This can be provided by the Town, contractor to indicate the number of days required for
traffic control. Detail may be Police or certified flaggers.
17. Q: Clarifying that the chain link fence on top of the headwall with need to be replaced with
new for the entire length?
A: New chain link fence (in kind) to be replaced the entire run. New fence to be
installed between the guiderail and the headwall, old fence removed.
18. Q: Is the excavation and removal of soils for the parking lot area to be included in the Base
Bid or Option #3?
A: The base bid only includes enough for the contractor to establish a work area. The
remainder is covered in option 3. The soil export from necessary grading can be
brought to the Town transfer station (91 Roxbury Road, Niantic) to be deposited without
fee.
19. Q: On the Parking Lot plan, sheet SP-1, Can you please provide a detail of the level spreader,
specifically if geotextile fabric will be required on bottom and sides, etc.?
A: No, geotextile is not required.
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

20 MT. PLEASANT TERRACE TORRINGTON CT 06790 Bids are invited by owner and

State Government of Connecticut

Bid Due: 6/12/2026

MILK BID Start Date : May 28, 2026 08:00:00 AM EDT End Date

State Government of Connecticut

Bid Due: 6/23/2026

Frozen Food & Staple Goods West Hartford Nutrition Services is accepting proposals for

State Government of Connecticut

Bid Due: 6/22/2026

Follow FCI Danbury 4th Quarter Fruit Active Contract Opportunity Notice ID 15B20326Q00000034 Related

JUSTICE, DEPARTMENT OF

Bid Due: 6/05/2026