PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Washington |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 25, 2026 |
| Due Date: | Oct 8, 2026 |
| Solicitation No: | W912DW27RA017 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Original)
- Original Published Date: Sep 24, 2026 09:55 pm PDT
- Original Response Date: Oct 08, 2026 01:00 pm PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Oct 23, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1AZ - CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Joint Base Lewis McChord , WAUSA
USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.
The definitive removal / demolition work items for each building will require:
a) Hazardous material / debris abatement and removal mostly within the crawl space
b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc.
c) Removal at ~ 90% removal of building mechanical – electrical systems
d) Removal of the existing roof EPDM system (but not the roof framing structure)
The definitive repair / new work items for each building will require:
e) New exterior envelope
f) New building mechanical – electrical systems
g) New Thermoplastic Polyolefin (TPO) Roof system
h) Painting of exteriors
Other considerations for site work coordination:
i) New utility connections (mostly by other entities)
j) Shared construction boundaries with adjacent current and future projects
- KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH
- SEATTLE , WA 98134-2329
- USA
- Cassandra Gonzalez
- cassandra.p.gonzalez@usace.army.mil
- Phone Number 2065073218
- Shawna West
- shawna.west@usace.army.mil
- Sep 24, 2026 09:55 pm PDTSpecial Notice (Original)
Related Document
| Oct 28, 2026 | [Presolicitation (Original)] Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222 |
| Nov 13, 2026 | [Solicitation (Updated)] Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3221 and 3222 |
See Also
Follow JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON Active
DEPT OF DEFENSE
Due by 11/30/2026
Follow WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107
TRANSPORTATION, DEPARTMENT OF
Due by 12/03/2026
Park & Ride NE 44th Street Station - Request for Qualifications are due
City of Renton
Due by 12/01/2026
Follow Design-Build Modernization of the LPOE in Lynden, Washington Sources Sought Active Contract
GENERAL SERVICES ADMINISTRATION
Due by 12/03/2026