PKAA, ,Marshall Coal Fire Mitigation Project
| Agency: | State Government of Colorado |
|---|---|
| State: | Colorado |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 27, 2025 |
| Due Date: | Mar 7, 2025 |
| Solicitation No: | NCS1-PKAA-2025000245-1 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Description: PKAA, ,Marshall Coal Fire Mitigation Project
Department: DNR - Division of Reclamation Mining & Safety
Buyer: Teresa Ryan
Solicitation Number: NCS1-PKAA-2025000245-1
Type: Notice of Contractor Settlement (NCS1)
Category: Construction
Closing Date and Time: 03/07/2025 11:45 AM MST
| Line Number | Commodity Description | Details | Requested | |
|
1
|
The project work will involve mitigating the subsurface coal fire by excavating the burning/smoldering coal and thoroughly blending the hot material with cold overburden until the temperature of the blended material is below eighty degrees Fahrenheit (80°F). The cooled and blended material will then be used to backfill the excavation. The excavation, blending and backfilling operations will occur in a rolling manner so that only a portion of the mitigation area is open at any one time. A portion of the mitigation area is planned to be re-developed for use as the Marshall Mesa Trailhead. In the areas planned for the trailhead re-development, compacted backfill will be required. All areas within the trailhead re-development will be rough graded to elevations provided in the Site Plans. Outside of the trailhead re-development area the mitigated areas will be graded to resemble the surrounding natural topography, seeded and hydro-mulched. It is estimated that 182,000 cubic yards of material will be excavated and blended during the mitigation process.
|
Specifications
Commodity Code
96273
|
Service From
09/30/2024
Service To
02/28/2025
|
View Purchase History
Additional Information
|
See Also
Description: C27DM4 - CMGC Pre-Const Services: SpCk Dam Rehab Proj Department: DNR -
State Government of Colorado
Due by 6/30/2027
Follow Forest wide Decommissioning, Gunnison National Forest Colorado Active Contract Opportunity Notice ID
AGRICULTURE, DEPARTMENT OF
Due by 9/22/2026
Follow Z1DA--554-26-106 Replace DW Valves. Active Contract Opportunity Notice ID 36C25926R0057 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/30/2026
General Information Document ID IFB1-CAAA-2027000018-1 Status Open Description CTF FCF Grease Interceptor IFB1
State Government of Colorado
Due by 10/01/2026