Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp, Uinta Wasatch, Cache National Forest, Weber Utah
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Nov 7, 2024 |
| Due Date: | Nov 25, 2024 |
| Solicitation No: | 1141512 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Nov 07, 2024 02:04 pm CST
- Original Response Date: Nov 25, 2024 09:00 am CST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Dec 10, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2PA - REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
South Jordan , UT 84095USA
Presolicitation
Project Title: Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp, Uinta Wasatch, Cache National Forest, Weber Utah
1. Introduction.
This pre-solicitation notice is for information only and is not a commitment by the Government to solicit contractual offers or award contracts. The Government is not soliciting, nor will it accept proposals as a result of this presolicitation. If a competitive solicitation is issued in the future, it will be announced via The System for Award Management (SAM) at SAM.gov and interested parties must comply with that announcement. The Government will not reimburse respondents for any questions submitted or information provided as a result of this notice. This is not a solicitation or a promise to issue a solicitation, and this information is subject to modification and in no way binds the Government to award a contract.
2. Applicable North American Industry Classification System (NAICS) Code.
The applicable NAICS CODE: 237990- Other Heavy and Civil Engineering Construction (Size Standard in millions of dollars $45M).
3. Type of Contract to be Awarded.
As a result of this presolicitation and possible solicitation, the Special Project Operations Center, Intermountain Branch, plans to award a firm fixed price contract.
4. Type of Solicitation.
The solicitation, if released, will be governed by Federal Acquisition Regulation Part 15, “Contracting by Negotiation”.
5. Presolicitation Posting Period.
This presolicitation will be posted for 18 days.
6. Contracting Office Points of Contact.
Holly Hlavac, Contract Specialist, Holly.Hlavac@usda.gov
7. Contract Description.
This project includes all labor, materials and equipment to reconstruct the existing Port Ramp Day Use Area at Pineview Reservoir near Huntsville, UT. The site is owned by the Ogden Ranger District of the Uinta Wasatch, Cache National Forest.
Work Includes:
1. Removal and disposal of existing structures and site furnishings.
2. Removal and salvage to USFS of existing precast concrete vault comfort stations.
3. Preservation of existing accesses onto Snow Basin property.
4. Obliterating, scarifying, and regrading existing roadways and paths.
5. Construction of SR-158 road improvements, entry road, entry booths, and exit road.
6. Construction of storm drainage improvements: culverts, flared end sections, trash
racks, catch basins, treatment devices, and drainage channels.
7. Construction of rock rip rap slope protection.
8. Construction of entry gates.
9. Construction of concrete stairs.
10. Construction of precast concrete vault comfort stations.
11. Construction of new dump station.
12. Construction of improvements around Utah Division of Water Resources (DWR)
decontamination area.
13. Construction of a new parking lot area.
14. Construction of new booster pump station with associated water connections to
dump station, future concessionaire building, and host sites.
15. Construction of host sites with utility hookups.
16. Construction of sanitary sewer system for dump station and host sites with
underground wastewater storage tanks.
17. Construction of trash enclosures.
18. Construction of pavilions (i.e. shade structures) with picnic and utility tables.
8. Project Location.
The work will be conducted near Eden, Utah at an existing Forest Service owned site on the Ogden Ranger District. Located 1.4 miles north from the junction of Utah State Route 39 and Utah State Route 158, the site address is 444 N. Hwy 158, Eden, Utah 84310.
9. Estimated Period of Performance.
May 1, 2025, through May 1, 2026
10. Disclosure of Magnitude.
The anticipated magnitude for this project is more than $10,000,000.00
11. Type of Set-aside.
Total small business set-aside.
12. Responses.
Interested and capable sources are encouraged to respond to this presolicitation with a Statement of Capability. In addition to a Statement of Capabilities, firms responding to this announcement should include Company Name, Unique Entity Identification, Point of Contact, Address, and indicate whether they are a Small Business, 8(a) Concern, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Business, HUBZone Small Business, Small Disadvantaged Business, or Women-Owned Small Business. Responses are due within 18 days of this presolicitation and should be submitted to Contracting Specialist, Holly Hlavac at Holly.Hlavac@usda.gov.
- SPOC Intermountain 1400 INDEPENDENCE AVE SW, MS-1138
- Washington , DC 202500001
- USA
- Holly Hlavac
- holly.hlavac@usda.gov
- Lucas Dahlman
- lucas.dahlman@usda.gov
- Nov 07, 2024 02:04 pm CSTPresolicitation (Original)
See Also
Project: Mapleton ADA Ramps 2026 Ref. #: MPLTN26-03 Department: CITIES - Mapleton City
State Government of Utah
Due by 9/24/2026
Project: IFB - Lake Avenue Storm Water Drywell Installation Ref. #: 2026-027 Department:
State Government of Utah
Due by 9/28/2026
Project: Crack Seal 2027 Ref. #: ST2026005 Department: CITIES - American Fork Type:
State Government of Utah
Due by 9/30/2026
Follow GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah Active Contract Opportunity Notice
AGRICULTURE, DEPARTMENT OF
Due by 9/23/2026