Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp Ogden Ranger District, Uinta Wasatch, Cache National Forest, Weber, Utah
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Oct 8, 2024 |
| Due Date: | Nov 14, 2024 |
| Solicitation No: | 1131540 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Updated)
- Updated Published Date: Oct 08, 2024 08:32 am MDT
- Original Published Date: Oct 02, 2024 07:38 am MDT
- Updated Response Date: Nov 14, 2024 12:00 pm MST
- Original Response Date: Nov 14, 2024 12:00 pm MST
- Inactive Policy: 15 days after response date
- Updated Inactive Date: Nov 29, 2024
- Original Inactive Date: Nov 29, 2024
- Initiative:
- Original Set Aside:
- Product Service Code: Z2PA - REPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
South Jordan , UT 84095USA
NOTE: THE PRE-SOLICITATION FALL SITE VISIT NOTIFICATION HAS BEEN UPDATED TO ADD THE FOLLOWING ATTACHMENTS: STATEMENT OF WORK, SPECIFICIATIONS AND DRAWINGS.
PRE-SOLICITATION FALL SITE VISIT ONLY, THIS IS NOT A SOLICITATION
Project Title: Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp, Ogden Ranger District, Uinta Wasatch, Cache National Forest, Weber, Utah
Project Summary:
This project includes all labor, materials and equipment to reconstruct the existing Port Ramp Day Use Area at Pineview Reservoir near Huntsville, UT. The site is owned by the Ogden Ranger District of the Uinta Wasatch, Cache National Forest.
Work Includes:
1. Removal and disposal of existing structures and site furnishings.
2. Removal and salvage to USFS of existing precast concrete vault comfort stations.
3. Preservation of existing accesses onto Snow Basin property.
4. Obliterating, scarifying, and regrading existing roadways and paths.
5. Construction of SR-158 road improvements, entry road, entry booths, and exit road.
6. Construction of storm drainage improvements: culverts, flared end sections, trash
racks, catch basins, treatment devices, and drainage channels.
7. Construction of rock rip rap slope protection.
8. Construction of entry gates.
9. Construction of concrete stairs.
10. Construction of precast concrete vault comfort stations.
11. Construction of new dump station.
12. Construction of improvements around Utah Division of Water Resources (DWR) decontamination area.
13. Construction of a new parking lot area.
14. Construction of new booster pump station with associated water connections to dump station, future concessionaire building, and host sites.
15. Construction of host sites with utility hookups.
16. Construction of sanitary sewer system for dump station and host sites with underground wastewater storage tanks.
17. Construction of trash enclosures.
18. Construction of pavilions (i.e. shade structures) with picnic and utility tables.
Site Visit Information:
Date: Friday November 15, 2024.
Time: 10:00 AM MST
Where: Pineview Trail Head
Access: Approx. 6.5 miles East of the mouth of Ogden Canyon along Hwy 158 41°15'56.25"N 111°49'28.52"W, Ogden, Utah.
POC/Telephone Number: Oscar Mena 801-554-9916
A Forest Service site visit of the units will be at the Pineview Trail Head at 10:00 AM MST on Friday November 15, 2024. Those participating in the site visit must furnish their own transportation and may wish to bring a lunch. Please inform the District Office if you plan to attend by calling POC at 801-554-9916 by noon of the day before the site visit.
The function of the Forest Service site visit is to show the on-the-ground location of the work areas, boundaries and other in-place markers, and the routes of travel that may be utilized in going to and from the work areas.
Directions and Access:
Approx. 6.5 miles East of the mouth of Ogden Canyon along Hwy 158 41°15'56.25"N 111°49'28.52"W, Ogden, Utah. Some areas are located behind locked gates and must be viewed on the scheduled site visit, or "walk-in" may be required. Interested parties desiring to visit units on their own should coordinate travel with Oscar Mena COR at 801-554-9916.
MAGNITUDE OF CONSTRUCTION PROJECT
More than $10,000,000.00
- US
- Holly Hlavac
- holly.hlavac@usda.gov
- Lucas Dahlman
- Lucas.Dahlman@usda.gov
- Oct 08, 2024 08:32 am MDTSpecial Notice (Updated)
- Oct 02, 2024 07:38 am MDT Special Notice (Original)
Related Document
| Oct 3, 2024 | [Special Notice (Original)] Pineview Reservoir Recreation Complex Reconstruction – Port Boat Ramp Ogden Ranger District, Uinta Wasatch, Cache National Forest, Weber, Utah |
See Also
Project: Mapleton ADA Ramps 2026 Ref. #: MPLTN26-03 Department: CITIES - Mapleton City
State Government of Utah
Due by 9/24/2026
Project: Crack Seal 2027 Ref. #: ST2026005 Department: CITIES - American Fork Type:
State Government of Utah
Due by 9/30/2026
Follow GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah Active Contract Opportunity Notice
AGRICULTURE, DEPARTMENT OF
Due by 9/23/2026
Follow U.S. Department of State Passport Office Construction Services - Salt Lake City,
GENERAL SERVICES ADMINISTRATION
Due by 9/18/2026