Pilot Station Water Distribution & WTP Improvements Project
| Agency: | ALASKA NATIVE TRIBAL HEALTH CONSORTIUM |
|---|---|
| State: | Alaska |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Nov 1, 2024 |
| Due Date: | Nov 21, 2024 |
| Solicitation No: | IFB #ANTHC 25-B-16847 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: This is a re-solicitation of IFB #ANTHC 25-B-291808. The project schedule has been adjusted and the requirement for liquidated damages has been removed.
The Project includes the following Work: Work of the Project includes rehabilitation of the Pilot Station water treatment plant (WTP) and distribution upgrades. Work includes, but is not limited to, the following: • Construction of temporary bypass of existing system • Demolition of existing treatment, heating, and distribution system piping • Construction of new chlorine room and replacement of existing chlorination equipment • Installation of new raw water heat addition system • Replacement of all existing distribution piping, meters, and instruments • Installation of new concrete pads for equipment as required • Installation of new mechanical and plumbing systems • Installation of new Owner supplied control panels (supplied and commissioned by ANTHC) • Modify existing well control panels as required (will be commissioned by ANTHC) • Installation of water storage tank level transducer and controls • Flush, pressure test, disinfect, and commission systems within the WTP, in coordination with ANTHC The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with constructing water treatment plant distribution systems.
Estimated Cost Range: Owner anticipates that the Work’s total bid price will be approximately $1,250,000 – $1,700,000.
Anticipated Schedule: The Project has an expected substantial completion date of 1 September 2025 and final completion date of 1 October 2025.
See Also
+ 2026C043 - Bartlett Pool Renovation Click here to be added to the
City of Anchorage
Due by 9/30/2026
Basic Information Solicitation Number STP0001408 Title ITB: STP0001408 / Z600770000 - Wasilla-Fishhook Road
State Government of Alaska
Due by 9/25/2026
WASILLA-FISHHOOK ROAD - MAIN STREET REHABILITATION Plan Holders List Central Region , Wasilla
State Government of Alaska
Due by 9/25/2026
Basic Information Solicitation Number 27-VSW-KMO-012 Title ITB 27-VSW-KMO-012 Manokotak Sewer Improvements Department Environmental
State Government of Alaska
Due by 9/17/2026