Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | West Virginia |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Dec 19, 2025 |
| Due Date: | Jan 13, 2026 |
| Solicitation No: | W911WN26BA003 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Dec 19, 2025 08:20 am EST
- Original Published Date: Dec 10, 2025 10:41 am EST
- Updated Date Offers Due: Jan 13, 2026 11:00 am EST
- Original Date Offers Due: Jan 13, 2026 11:00 am EST
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jan 28, 2026
- Original Inactive Date: Jan 28, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2KA - REPAIR OR ALTERATION OF DAMS
-
NAICS Code:
- 238990 - All Other Specialty Trade Contractors
-
Place of Performance:
Wheeling , WV 26003USA
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project at Pike Island Locks and Dam, Ohio River, Belmont County, West Virginia. The work is located on both the Main Lock Chamber and the Auxiliary Lock Chamber, downstream of each of the downstream miter gates at the poiree dam location. The site of the work may be reached from state and local roads and streets, however, floating plant support may be required for some features of work. The general description of the work is to furnish all equipment, labor, layout of work, and supervision to prepare the site for future installation of downstream bulkhead recesses by others. This work includes coring holes in the concrete, wiresawing of concrete, on both the vertical and horizontal faces of the lock monoliths, to the extent shown in the plans. Portions of this work will occur underwater. Concrete coring work will be performed in the 110-FT by 1200-FT main lock chamber, and the 110-FT by 600 FT auxiliary lock chamber, specifically at the monoliths adjacent to the Poiree dam sill. The work will involve both vertical and horizontal coring of concrete. In addition to concrete coring, concrete wiresawing work will be performed in the 110-FT by 600-FT auxiliary lock chamber only, at the location where the concrete coring was executed. The work will involve both vertical and horizontal sawing of concrete.
NOTICE: Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on “View FFP Contract Changes Playbook Here”.
19 December 2025 - Organized pre-bid site visit conducted on 17 December 2025. Contracting discussion and site visit sign in posted.
- WILLIAM S MOORHEAD FEDERAL BUILDING 1000 LIBERTY AVE
- PITTSBURGH , PA 15222-4198
- USA
- Aaron Barr
- aaron.m.barr@usace.army.mil
- Phone Number 4123957157
- Connie L. Ferguson
- Connie.L.Ferguson@usace.army.mil
- Phone Number 4123957551
- Dec 19, 2025 08:20 am ESTSolicitation (Updated)
- Dec 10, 2025 10:41 am EST Solicitation (Original)
- Nov 30, 2025 12:04 am EST Presolicitation (Updated)
Related Document
| Oct 29, 2025 | [Presolicitation (Original)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Oct 30, 2025 | [Presolicitation (Updated)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Dec 10, 2025 | [Solicitation (Original)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Jan 6, 2026 | [Solicitation (Updated)] Pike Island Locks and Dam Bulkhead Slot Coring and Wiresawing |
| Jan 15, 2026 | [Solicitation (Updated)] Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam |
| Jan 21, 2026 | [Solicitation (Updated)] Bulkhead Slot Coring and Wiresawing for Pike Island Locks and Dam |
See Also
General Information Document ID CRFQ-0310-DNR2700000005-1 Status Open Description Cacapon State Park Lodge Roof
State of West Virginia
Due by 9/22/2026
General Information Document ID CRFQ-0810-DMT2700000001-1 Status Open Description Replace 4,000 ties on SBVR
State of West Virginia
Due by 9/17/2026
General Information Document ID ARFQ-0313-DEP2700000007-1 Status Open Description AML - Harmonds Creek Portals
State of West Virginia
Due by 9/23/2026
General Information Document ID CRFQ-0211-GSD2700000015-1 Status Open Description Building 8 Chimney Inserts and
State of West Virginia
Due by 10/01/2026