Pike County Jail Renovations - SHOWERS

Agency: State Government of Mississippi
State: Mississippi
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Apr 24, 2026
Due Date: May 7, 2026
Solicitation No: 366-20260409112943 PCBS
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Procurement Details

Smart Number 366-20260409112943 PCBS Advertised Date 04/24/2026 5:00 PM
RFx # 3170035616 Submission Date 05/07/2026 2:00 PM
RFx Status Open Major Procurement Category CONSTRUCTION
RFx Opening Date N/A Sub Procurement Category CONSTRUCTION - SERVICES
RFx Type MDA - RFx
Agency MPTAP
RFx Description Pre-Bid Conference:
Date & Time: 4/22/2026 10:00 AM
Description: Pike County Jail Renovations - SHOWERS Magnolia, Mississippi Project No. 26000.01
Pre-Bid Conference to be held at Pike County Jail, 2109 Jesse Hall Industrial Pk. Rd., Magnolia, MS 39652

-----------------------------------------------------------------------------------

RFx Items
PRODUCT CATEGORY PRODUCT DESCRIPTION
91502 Serv CommMediaNotBid

Awarded
VENDOR NAME VENDOR NUMBER AWARD DATE AWARD AMOUNT FUNDING SOURCE

Bid Attachments
Attachments
26000.01 SPECIFICATIONS 2026-0408 compressed.pdf
Attachments
26000_01_DRAWINGS_2026-0408_compressed1 (2)

Attachment Preview

DIVISION 08 - OPENINGS
SEE DRAWINGS FOR HOLLOW METAL FRAME REPAIR.
DIVISION 09 - FINISHES
SECTION 092236 - METAL LATH
SECTION 092900 - GYPSUM BOARD
SECTION 096723 - RESINOUS FLOORING
SECTION 099123 - INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
SECTION 102813.63 - DETENTION TOILET ACCESSORIES
NOT APPLICABLE
DIVISION 11 - EQUIPMENT
DIVISION 12 - FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
DIVISION 22 - PLUMBING
SEE MECHANICAL DRAWINGS FOR PLUMBING WORK
NOT APPLICABLE
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC)
DIVISION 27 - COMMUNICATIONS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
DIVISION 31 - EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
DIVISION 33 - UTILITIES
DIVISION 34 - TRANSPORTATION
DIVISION 40 - PROCESS INTERCONNECTIONS
DIVISION 99 - FORMS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
SECTION 001113 ADVERTISEMENT FOR BIDS
Notice is hereby given that sealed bids and electronic bids will be received for the project
named below by Pike County Board of Supervisors, 200 E. Bay Street, Magnolia, MS 39652
until 2:00 PM on Thursday, May 7, 2026.
Location for Receipt of Sealed Hard Copy Bids:
Pike County Board of Supervisors
200 E. Bay Street
Magnolia, Mississippi 39652
Location for Receipt of Electronic Bids:
Access the following website and login: www.jbhmplans.com
Access the Public Jobs link, access the Project link, and access the Submit Bid tab.
Plans and Specifications Entitled:
Pike County Board of Supervisors
Pike County Jail Renovations - Showers
2109 Jesse Hall Industrial Park Road
Magnolia, MS 39652
May be inspected at the office of the Architect named below, or may be obtained from the
Architect as set out below:
Qualified Prime (General) Contractors, Subcontractors, and Material Suppliers are required
to register and order bid documents at www.jbhmplans.com.
Bid documents are available as paper prints or as digital copies. Cost of digital copy (.pdf
Format) and/or the cost of paper prints will be listed on the www.jbhmplans.com website.
Bid documents are non-refundable and must be purchased through the website.
Questions regarding website registration and online orders please contact our web support
line at (662) 407-0193.
All plan holders are required to have a valid email address for registration.
Partial sets will not be issued.
Proposals shall be submitted in duplicate only upon the blank proposal forms provided with the
specifications and must be accompanied by Proposal Security in the form of Certified Check or
acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid; such
security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out
the terms of the proposal, execute contract and post-Performance Bond in the form and amount
within the time specified. The Bid Bond, if used, shall be payable to the Owner.
00 11 13 - 1
ADVERTISEMENT FOR BIDS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
Bids on the Project must be received on or before the period scheduled for the Project and no
bid withdrawn after the scheduled closing time for the Project for a period of forty-five (45) days.
All bids submitted in excess of $50,000.00 by a Prime or Subcontractor to do any erection,
building, construction, repair, maintenance, or related work must comply with the Mississippi
Contractors Act of 1985, by securing a Certificate of Responsibility from the State Board of
Contractors. Each bid, exceeding $5,000.00, must be accompanied by the Bidder's certified
check or a bid bond, duly executed by the Bidder as principal and having surety thereon, a
surety company approved by the Owner and signed by an agent, regularly commissioned and
licensed to transact business in Mississippi, in the amount of five percent of the bid. All bid
bonds must be accompanied by the appropriate Power of Attorney. No Power of Attorney is
necessary with a certified check.
The Owner reserves the right to reject any and all bids on any or all projects and to waive
informalities.
A Pre-Bid Conference has been scheduled for 10:00 AM on Wednesday, April 22, 2026 and
will be held at the Pike County Jail, 2109 Jesse Hall Industrial Park Road, Magnolia, MS 39652.
A site tour of the project shall be available following the meeting. All general contract/major
subcontract Bidders and Suppliers are urged to attend. All Bidders are expected to have
familiarized themselves with conditions relating to the Work prior to the Pre-Bid Conference.
OWNER:
Pike County Board of Supervisors
200 E. Bay Street
Magnolia, Mississippi 39652
ARCHITECT:
JBHM ARCHITECTS, PA
1400 MEADOWBROOK ROAD, SUITE 101
JACKSON, MS 39211
PH: (601) 352-2699
DATES OF ADVERTISEMENT: Wednesday, April 8, 2026
Wednesday, April 15, 2026
END OF SECTION 001113
00 11 13 - 2
ADVERTISEMENT FOR BIDS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
SECTION 002113 INSTRUCTIONS TO BIDDERS
PART 1 - GENERAL
1.01 GENERAL REQUIREMENTS
A. Interpretations: Should a bidder find discrepancies in or omissions from the plans and
specifications or be in doubt as to their written meaning, he should immediately notify the
Architect in writing. The Architect will then send a written instruction or interpretation to
all known holders of the documents if deemed appropriate by the Architect. Neither the
Owner nor the Architect will be responsible for nor bound by any oral instructions or for a
bidder's failure to make inquiry.
B. Addenda: Any addenda to the plans and/or specifications issued before or during the
time of bidding will become a part of the Contract and receipt of same must be
acknowledged by Bidder in his proposal.
C. "Or Equal" Substitutions: Refer to Section 002213, Paragraphs 3.4.2 and 3.4.4 and to
Section 012500 - "Or Equal" Substitutions: Bidder is advised that some sections of the
specifications may not allow for substitutions and that the requirements of Sections 00 22
13 and 01 25 00 must be strictly complied with to obtain a substitution where substitution
is allowed. Failure to strictly comply with Sections 00 22 13 and 01 25 00 and any
requirements in the technical specifications which do not conflict with, and which are in
addition to Sections 00 22 13 and 01 25 00 may, in the Owner's sole discretion, result in
the rejection of the request for "or equal" substitution.
D. Construction Documents: As indicated in the Advertisement for Bids, Contract
Documents will be issued via link only. Bidders should include in Base Bid
Proposal cost of printing all documents required for construction, as-built
drawings, and close out documents.
1.02 BIDDING
A. Contract for Construction: Lump sum, single bid received from General Contractors
and shall include General, Mechanical, Electrical, and Site work as well as all other work
shown on plans and specified herein.
B. Subcontractors and Suppliers: The Bidder is specifically advised that any person, firm,
or other party to whom it is proposed to award a Subcontract or Purchase Order under
this Contract must be acceptable to the Owner.
1. The Owner may make such investigation as he deems necessary to determine the
ability of the Bidder or subcontractors or suppliers to perform the work, and the
Bidder shall furnish to the Owner all such information and data for this purpose as
the Owner may request. The Owner reserves the right to reject any bid if the
evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that
such Bidder is properly qualified to carry out the obligations of the Contract and to
complete the work contemplated therein within the time required.
00 21 13 - 1
INSTRUCTIONS TO BIDDERS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
2. All subcontractors must have a current, valid, Contractor's License and/or Certificate
of Responsibility where Bid exceeds $50,000.00.
3. Listing of Subcontractors and Suppliers:
a. So that the Owner may be assured that only qualified and competent
subcontractors and suppliers will be utilized on the Project and to prevent
"bid-shopping" and/or "bid-chopping", each Bidder shall identify within seven (7)
days after Bid receipt date the name of the subcontractor and supplier used by
the Bidder in his bid for each subcontractor and supplier whose bid or quote
exceeds $50,000.00. Bidder's List shall be provided on the Listing Form
provided with the Proposal Form. A Bidder's failure to indicate the name(s) of
the subcontractors and major suppliers included in his lump sum price within
seven (7) days after Bid receipt may result in the rejection of the Bidder's bid as
nonresponsive.
b. The successful Bidder shall use the subcontractor and supplier identified by him
as being included in his lump sum price, provided however, the Bidder assumes
the risk that the subcontractor or supplier listed within the seven (7) day period
will be acceptable to the Owner and the Architect. The Bidder shall not
substitute another subcontractor for the listed subcontractor or supplier unless
agreed to in writing by the Owner.
c. If Bidder lists itself as a supplier for any of the classifications listed, then the
Bidder will be required to furnish such product from its manufacturing inventory
and to demonstrate to the Owner and Architect that it has satisfactory
qualifications and prior experience manufacturing and furnishing such materials,
equipment and/or products. If Bidder lists itself as a subcontractor for any of the
classifications listed, then the Bidder will be required to perform the work with its
own regularly employed personnel and to demonstrate to the Owner and
Architect that it has satisfactory qualifications and prior experience performing
such work with its own regularly employed personnel. The Owner reserves the
right to reject any bid if the evidence submitted by Bidder fails to satisfy the
Owner that the Bidder has satisfactory qualifications and prior experience
performing such work and/or furnishing such materials, equipment and/or
products.
1.03 CERTIFICATE OF RESPONSIBILITY
A. Each Bidder submitting a bid equal to or in excess of $50,000.00 on public or private
projects must show on his bid and on the face of the envelope containing the bid, his
Certificate of Responsibility Number, as required by Section 31-3-21 (latest revision)
Mississippi Code. If the bid does not exceed $50,000.00, a notation so stating must
appear on the face of the envelope.
B. Each subcontractor shall also have a Certificate of Responsibility Number, as required
by Section 31-3-21 (latest revision), Mississippi Code.
C. Evidence: No bid will be opened, considered or accepted unless the above information
is given as specified. Sufficient evidence that said Certificate of Responsibility has
00 21 13 - 2
INSTRUCTIONS TO BIDDERS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
been issued and is in effect at the time of receiving bids must be submitted if required by
the Owner or the Architect. Likewise, it shall be the responsibility of the General
Contractor to require a Certificate of Responsibility Number from any subcontractor that
falls in the category of "B" above.
D. In accordance with Mississippi law, if the Bidder is a joint venture, either the joint venture
or all of the Contractors which make up the joint venture must hold certificates of
responsibility from the State Board of Contractors.
1.04 PRE-BID CONFERENCE
A. A pre-bid conference has been scheduled at 10:00 AM on Wednesday, April 22,
2026, at 2109 Jesse Hall Industrial Park Road, Magnolia, MS 39652.
B. All general contract/major subcontract Bidders and Suppliers are urged to attend.
C. All Bidders are expected to have familiarized themselves with conditions relating to the
Work prior to the pre-bid conference.
1.05 NON-RESIDENT CONTRACTOR
A. When a non-resident Contractor submits a bid for a Mississippi public project, he shall
include with bid a copy of his resident State's current law pertaining to such State's
treatment of non-resident Contractors as required by Section 31-3-21, Mississippi Code,
(latest revisions) or a letter stating that his resident State has no such law pertaining to
such State's treatment of non-resident contractors.
1.06 BID SECURITY
A. Each bid, exceeding $5,000.00, must be accompanied by the Bidder's certified check or
a bid bond, duly executed by the Bidder as principal and having surety thereon, a surety
company approved by the Owner and signed by an agent, regularly commissioned
and licensed to transact business in Mississippi, in the amount of five percent of the
bid. All bid bonds must be accompanied by the appropriate Power of Attorney. No
Power of Attorney is necessary with a certified check.
1.07 OPENING OF PROPOSALS
A. Refer to the Advertisement for Bids.
1.08 PREPARATION OF BID
A. Conditions of Work: Each Bidder must fully inform himself of the conditions relating to
the construction of the project and employment of labor thereon. Failure to do so will
not relieve a successful Bidder of his obligation to furnish all material and labor
necessary to carry out the provisions of his Contract. The Contractor must employ
methods or means to cause no interruptions of or interference with the work of any
other Contractor.
B. Examination of Site: All Bidders, including the general contractor and subcontractors,
00 21 13 - 3
INSTRUCTIONS TO BIDDERS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
will visit the site of the building, and inform themselves of all conditions. Failure to visit
the site will in no way relieve the successful Bidder from his obligation to complete all
work in accordance with the Contract Documents without additional cost to the Owner.
C. Staging and Access: All Bidders, including the general contractor and subcontractors,
acknowledge that the construction premises are restricted, and that access is affected
by the location of the Project, by the Facilities surrounding the Project and by other
construction either presently being performed or proposed to be performed during the
performance of this Contract. All Bidders, including the general contractor and
subcontractors, further acknowledge that such limitations in space and accessibility have
been taken into account in estimating their bids.
D. Laws and Regulations: The Bidder's attention is directed to the fact that all applicable
state laws, municipal ordinances, and the rules and regulations of all authorities having
jurisdiction over construction of the project apply to the Contract. The successful Bidder
shall be required to comply with all applicable laws, ordinances, rules and regulations at
no additional cost to Owner whether such laws, ordinances, rules and/or regulations are
enacted or adopted or become effective before or after bid opening.
E. Obligation of Bidder: At the time of opening of bids, Bidder will be presumed to have
inspected the site and to have read and be thoroughly familiar with the plans and
specifications, including all addenda.
F. Telegraphic and Facsimile Modifications: A Bidder may modify his bid by telegraphic or
facsimile communication at any time, provided such communication is received by the
Owner prior to the scheduled time for opening bids. Written confirmation must be
received within two days from the bid opening time, or no consideration will be given the
telegraphic or facsimile modifications.
1.09 PROPOSALS
A. Form: Submit all proposals on forms provided and fill all applicable blank spaces
without interlineation, alteration, or erasure and recapitulations of the work to be done.
No oral, telegraphic, or telephonic proposals will be considered. Any addenda issued
during the bidding must be noted on the Proposal Form.
B. Withdrawal: Any bid may be withdrawn prior to the time for opening of bids or
authorized postponement thereof. Any bid received after the time and date specified
will not be considered. All bids are irrevocable offers to contract at the price bid which
may not be withdrawn until Forty-Five (45) days after bid opening.
C. Submittal: Submit bids in duplicate in an opaque sealed envelope bearing on the
outside, the name and Certificate of Responsibility number of the Bidder, his address,
bid opening date, time, complete project name, and project number.
D. Any bid modification or qualification on the outside of the envelope will be considered
only if accompanied by signature and title of person making the modification.
E. Mailing: If forwarded by mail, the sealed envelope containing the bid must be enclosed
in another envelope addressed to:
00 21 13 - 4
INSTRUCTIONS TO BIDDERS

P.N. 26000.01 JBHM Architects, P.A. 04/08/2026
PIKE COUNTY BOARD OF SUPERVISORS
200 E. BAY STREET
MAGNOLIA, MS 39652
If submitting Electronic Bid: www.jbhmplans.com
F. Bidders are urged to deliver their bid to the Owner. Owner will not be responsible for
misdelivery of mail or express deliveries.
1.10 Contract
A. Award of Contract: Award shall be made to the lowest and best Bidder, pursuant to
Mississippi law and these Instructions to Bidders. The lowest bid shall be the base bid
or combination of base bid and those alternates which produce a total within available
funds. The Owner reserves the right to waive irregularities and to reject any and all
bids.
B. Evaluation of the lowest and best Bidder, pursuant to Mississippi law and these
Instructions to Bidders, will include but not be limited to the following:
1. The submitted bid price.
2. The Bidder's relevant experience with Public and/or School projects of similar size,
complexity, cost, and schedule restraints.
a. Name of the project
b. Owner's name and contact information
c. Contract original sum and final contract amount
d. Contract original substantial completion date and actual substantial
completion date
e. Indicate if there were any claims, liquidated damages imposed, etc.
3. The Bidder's proposed Project Manager's relevant experience with Public and/or
School projects of similar size, complexity, cost and schedule restraints.
4. The Bidder's proposed Superintendent's (on-site foreman's) relevant experience
with Public and/or School projects of similar size, complexity, cost.
If requested by the Owner, the three lowest Bidders must provide requested information within
48 hours of receipt of bids.
C. Disqualification of Bidder: The Owner reserves the right to award to other than the low
Bidder when, in the Owner's judgment, it is in his best interest to do so. For instance, a
Bidder may be disqualified for such reasons as:
1. Bidder being in arrears on existing contracts.
2. Bidder being in litigation with the Owner or the institution/agency.
3. Bidder having defaulted on or failed to satisfactorily complete a previous
contract with the Owner, including Bidder's failure to satisfactorily fulfill the
warranty obligations of a previous contract with the Owner.
4. The above is not an inclusive list.
D. Security for Faithful Performance: When the bid exceeds $5,000.00 and simultaneously
00 21 13 - 5
INSTRUCTIONS TO BIDDERS

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Procurement Details Smart Number 1555-20260714151557 Tupelo Advertised Date 07/23/2026 12:00 PM RFx #

State Government of Mississippi

Bid Due: 8/19/2026

Procurement Details Smart Number 61-20260722095404 LCSD Advertised Date 07/24/2026 12:00 PM RFx #

State Government of Mississippi

Bid Due: 8/20/2026

Procurement Details Smart Number 113-20260723112647 BSDC Advertised Date 07/24/2026 5:00 PM RFx #

State Government of Mississippi

Bid Due: 8/13/2026

Solicitation Submission Deadline Request Documents and Specifications BID 27-05 DSC 8/12/26 2:00 PM

University of Southern Mississippi

Bid Due: 8/12/2026