Piedmont Propulsion Structural Floor Infill
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 17, 2025 |
| Due Date: | Nov 12, 2025 |
| Solicitation No: | 281-FB2637 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 281-FB2637 |
| Project Title: | Piedmont Propulsion Structural Floor Infill |
| Description: | cope of work summary: modification of the existing 14,000 square foot First Floor Level storage space and the existing Basement Floor Level space below. The Scope of Work will create manufacturing space on both floor levels. The recessed steel framing floor structure will be dismantled and reinstalled at a higher elevation with new steel column extension pieces and footing as needed. New steel floor decking and a concrete slab floor system will be constructed to match the top of the existing First Floor Level perimeter slab. |
| Opening Date: | 11/12/2025 3:00 PM |
| Posted Date: | 10/17/2025 |
| Status: | Open |
| Department: | CITY OF WINSTON-SALEM |
|
Solicitation Number
*
281-FB2637
|
Department
CITY OF WINSTON-SALEM
|
Status Reason
Open
|
|
|
Opening Date
2025-11-12T15:00:00.0000000
|
Posted Date
*
2025-10-17T11:44:55.0000000Z
|
Commodity Code
Concrete installation and repair services
|
|
|
Mandatory Conference/Site Visit
2025-10-28T04:00:00.0000000Z
|
Special Instructions
Submit questions in writing to James Anderson at andersja@forsyth.cc.
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Russell Frye
|
|||
|
Description
cope of work summary: modification of the existing 14,000 square foot First Floor Level storage space and the existing Basement Floor Level space below. The Scope of Work will create manufacturing space on both floor levels. The recessed steel framing floor structure will be dismantled and reinstalled at a higher elevation with new steel column extension pieces and footing as needed. New steel floor decking and a concrete slab floor system will be constructed to match the top of the existing First Floor Level perimeter slab.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.